States › Texas

Northeast Texas Trail

Rail-trail in Texas

Runs through Farmersville, Wolfe City, Ladonia, Paris, Blossom, Clarksville, Avery, New Boston and 6 more · Collin, Hunt, Fannin, Lamar, Red River and Bowie counties

All 14 towns and places

Farmersville, Celeste, Wolfe City, Ladonia, Roxton, Paris, Reno (Lamar County), Blossom, Detroit, Clarksville, Annona, Avery, De Kalb and New Boston

Conditions now

Loading the weather…

Forecast by the National Weather Service · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

The Northeast Texas Trail (NETT) is a 130+-mile multi-use trail along the route, following alongside U.S. Highway 82 and Texas State Highway 34. The trail connects nineteen cities spread over seven counties, stretching from the edge of the Dallas–Fort Worth metroplex to the Texarkana metropolitan area along the Arkansas border. The Northeast Texas Trail is the longest hike/bike and equestrian trail in Texas and the fourth longest in the United States. As of 2026, the trail exists in a patchwork of completed, paved sections and highly rugged, unimproved stretches.

From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.

Official website

Length
113 mi 182 km1
Opened
20113
Surface
Dirt1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Trail Head Park Plaza mile 0 · restrooms directions to trailhead 1
  2. Parking at Maple Street mile 12.3 directions to trailhead 2
  3. Parking at West Grizzley Avenue mile 12.7 directions to trailhead 3
  4. Parking at Dragon Drive mile 67.7 directions to trailhead 4
  5. Parking at 24th Street Southeast mile 67.7 directions to trailhead 5
  6. Parking at Dragon Drive mile 67.7 directions to trailhead 6
  7. Parking at South Harrison Street mile 81.7 directions to trailhead 7
  8. Parking at Houston Street directions to trailhead 8
  9. Parking at Onion Alley restrooms directions to trailhead 9
Northeast Texas Trail (opens in a new tab)
Photo: graharg · CC BY-SA 4.0 · Mapillary

About this trail

The Northeast Texas Trail (NETT) is a rail-trail of about 130 miles across seven counties of northeast Texas, from Farmersville, east of Dallas, through 19 rural towns to New Boston, west of Texarkana; this record maps about 108 miles of it. The corridor is rail-banked and held in pieces by several owners: Chaparral Rails to Trails from Farmersville to Paris, the Greater Paris Development Foundation from Paris to Clarksville, and Clarksville, Annona, Avery, Bowie County and New Boston farther east. The NorthEast Texas Trail Coalition, a nonprofit set up by those owners in 2012, promotes the trail. The western half follows a line the Gulf, Colorado and Santa Fe Railway built in 1886 and the Chaparral Railroad last ran before it was rail-banked in 1995; the eastern half follows the Texas and Pacific Railway's 1876 line, rail-banked in 1997 after Union Pacific gave it up.

From Farmersville the route runs northeast through Celeste, Wolfe City, Ladonia and Roxton to Paris, the halfway point, then east through Reno, Blossom, Clarksville, Annona, Avery and De Kalb to New Boston. The Trail de Paris, the first developed section, has grown from 2.5 to 11.5 miles. Wikipedia counts more than 100 railroad bridges, including a crossing of the Sulphur River.

The trail remains a mix of improved sections and rough, unimproved railbed; the coalition posts a temporary mandatory detour around a section on the southwest side of Paris that is not rail-banked. In 2022 TxDOT received a $25 million federal RAISE grant, shared with El Paso's Paso del Norte Trail, for bridges and trail surfaces on the NETT. TxDOT's Paris District has registered projects for a 10-foot aggregate path from Clarksville to the Bowie County line and a crushed-rock path from Celeste to Roxton, the latter scheduled for August 2026 to March 2028. The coalition reports that the Texas Parks and Wildlife Department commissioned a study of making it a state park.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

27% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: February to April and October to December. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Paris, 18.2 km from the trail's middle, 11 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F545866758391969689786556
Low °F333745536371757466554436
Precipitation, in3.13.34.34.75.64.33.5344.64.24.3
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1953 Texarkana sheet (1:250,000); the 1964 Detroit sheet (1:24,000) shows the area at mid-century. Browse all 5 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Historic Railway

The line in its working days, from copies of old photographs, oldest first.

Blossom, 1909: T&P Depot
Blossom, 1909: T&P DepotPhoto: H. D. Conner; The Grace Museum · Publicly available for research, teaching and private study (Portal to Texas History terms of use) · Digital Public Library of America (opens in a new tab)

Community

What riders say on Reddit

6 Reddit threads about this trail, Feb 2024 to May 2025

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Where people who ride and look after this trail post: notices, conditions, work days.

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. “Northeast Texas Trail”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
  3. Wikidata Q19877188, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
  4. Official trail website · Official site · checked Oct 31, 2026
  5. RAISE Grant Project - NETT (CSJ: 0901-00-062), Project Details — Texas Department of Licensing and Regulation · government source · checked Oct 15, 2026
    Supports: TxDOT Paris District project Celeste to Roxton, shared use path on abandoned railroad bed with crushed base rock surface, bridge re-decking, start 8/1/2026, completion 3/1/2028
  6. Northeast Texas Trail (NETT) (CSJ: 0901-27-056), Project Details — Texas Department of Licensing and Regulation · government source · checked Oct 15, 2026
    Supports: TxDOT Paris District 10-foot unpaved aggregate shared-use path from BU 82-J (Clarksville) to the east city limits of Annona
  7. Northeast Texas Trail - Avery Project (CSJ: 0901-27-054), Project Details — Texas Department of Licensing and Regulation · government source · checked Oct 15, 2026
    Supports: TxDOT Paris District 10-foot unpaved aggregate shared-use path from Annona to the Bowie County line
  8. TxDOT received $25 million in federal funds to expand two trail corridors in northeast Texas and El Paso — NorthEast Texas Trail Coalition (TxDOT press release, Aug. 17, 2022) · organization · checked Oct 15, 2026
    Supports: 2022 $25 million RAISE grant to TxDOT shared with the Paso del Norte Trail; bridges, trail surfaces; 130-mile former rail corridor from Farmersville to New Boston across seven counties
  9. History of the NETT — NorthEast Texas Trail Coalition · organization · checked Oct 15, 2026
    Supports: 19 towns and 7 counties from Farmersville to New Boston; rail-bank entities and their sections (RTC New Boston to Clarksville, GPDF Clarksville to Paris, Chaparral Paris to Farmersville), quitclaims to Farmersville, Bowie County, Clarksville, Annona and Avery; coalition operational 2012 with 501(c)(3) status; Trail de Paris grown from 2.5 to 11.5 miles
  10. Rail Banked Agencies — NorthEast Texas Trail Coalition · organization · checked Oct 15, 2026
    Supports: current section owners: Chaparral Rails to Trails (Merit to Paris), Greater Paris Development Foundation (Paris to Clarksville), Clarksville, Annona, Avery, Bowie County, New Boston
  11. NorthEast Texas Trail Coalition — Biking, Hiking, Walking, and Equestrian trails in NE Texas · organization · checked Oct 15, 2026
    Supports: 130-mile trail, Paris as halfway point, temporary mandatory detour for the non-railbanked section on the southwest side of Paris, campsites adjacent to the right of way, TPWD feasibility study of a state park
  12. Northeast Texas Trail — Wikipedia · organization · checked Oct 15, 2026
    Supports: 1886 Gulf, Colorado and Santa Fe line Farmersville to Paris, Chaparral Railroad, rail-banked 1995; 1876 Texas and Pacific line Paris to New Boston, Union Pacific ceased service late 1990s, rail-banked 1997; towns along the route; more than 100 rail bridges including the Sulphur River; patchwork of improved and rugged unimproved stretches as of 2026

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.