States › Massachusetts

Norwell Recreational Bikeway

Greenway in Massachusetts

Runs through Norwell · Plymouth County

Conditions now

Loading the weather near Marshfield Hills…

Forecast by the National Weather Service for Marshfield Hills · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
2.4 mi 3.8 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Main Street mile 0.6 directions to trailhead 1
  2. Parking mile 0.6 directions to trailhead 2
  3. Parking mile 0.7 directions to trailhead 3
  4. Parking at Forest Street mile 2 directions to trailhead 4
  5. Parking at Forest Street mile 2.3 directions to trailhead 5
  6. Parking at River Street mile 2.4 directions to trailhead 6
Norwell, along the trail (opens in a new tab)
Norwell, along the trail · Photo: John Phelan · CC BY 3.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Norwell Recreational Bikeway is the main off-road part of the Norwell Pathway, a network of paved cycling and walking paths, sidewalks and boardwalks in Norwell, Massachusetts, that offers an alternative to crossing town on Route 123 (Main Street). The town's trail map gives the Pathway's length as 3.5 miles; about 2.4 miles are mapped here. The North and South Rivers Watershed Association described it in 2016 as a project that had been unfolding over the previous few years.

From Gaffield Park, a playground at the corner of Forest and River streets in the town center, the Pathway follows Forest Street as a sidewalk, crossing the street twice and passing Miller Woods, a 45-acre town conservation area. At the intersection of Forest and Circuit streets it becomes a separate path, wider than the sidewalk and with marked lanes, which skirts the fields of the Donovan-Wildcat Conservation Area, winds through woods and wetlands on boardwalks over streams, and reaches the Norwell Middle School complex at 328 Main Street. Beyond the school it continues past town sports fields and the transfer station, with more boardwalks and paved sections, to Cushing Hill Road, near the high school and library on South Street.

The surface is asphalt with boardwalk sections. Parking is at the middle school, at Gaffield Park and in a lot at 107 Circuit Street near Pleasant Street; there is no parking at the Cushing Hill Road end, and the connection from there to the high school is on the street. TrailLink lists biking, inline skating, walking and wheelchair use.

Sources checked Oct 13, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

69% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Hingham, 11.6 km from the trail's middle, 13 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F384047586877838274635243
Low °F222329384857636255443527
Precipitation, in4.545.44.63.843.63.83.95.24.45.1
Snow, in14.814.510.31.7000000.10.78.8
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1885 Abington sheet (1:62,500); the 1961 Cohasset sheet (1:24,000) shows the area at mid-century. Browse all 17 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Norwell Pathway and Main St Sidewalk Trail Map — Town of Norwell Conservation · government source · checked Oct 13, 2026
    Supports: Norwell Pathway 3.5 miles; route south of Main Street to Forest Street
  3. Norwell's Pathway and More — North and South Rivers Watershed Association (2016) · organization · checked Oct 13, 2026
    Supports: network of paths, sidewalks and boardwalks as an alternative to Route 123; unfolding over the previous few years; Gaffield Park, Forest Street sidewalk crossing twice, Miller Woods 45 acres, Forest and Circuit intersection, marked lanes, Donovan fields, boardwalks, middle school, sports fields, transfer station, Cushing Hill Road, high school and library
  4. Norwell Pathway — TrailLink · web · checked Oct 13, 2026
    Supports: asphalt and boardwalk surface, parking at 107 Circuit Street and the middle school at 328 Main Street, no parking at the west end, on-street connection to the high school, activities

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.