Oak Creek Trail
Rail-trail in Nebraska · OpenStreetMap relation
Runs through Valparaiso · Butler and Saunders counties
Conditions now
Loading the weather near Dwight…
Forecast by the National Weather Service for Dwight · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at South Lincoln Street mile 0 directions to trailhead 1
Plan your visit
- National Recreation TrailDesignated in 2007 National Recreation Trails database
Links checked Oct 18, 2026. Sources: National Recreation Trails database (NPS and American Trails).
No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Oak Creek Trail is a crushed-limestone rail-trail in eastern Nebraska that links Valparaiso, Loma and Brainard. The Great Plains Trails Network lists it at 13.2 miles, and the BikeTheRail record from OpenStreetMap measures about 12.8 miles. The Lower Platte South Natural Resources District (LPSNRD) manages it.
The corridor was once occupied by the Union Pacific Railroad. The line was taken out of service under the federal rail banking process in 1993, and the trail opened in 1996, according to the district. An equestrian trail has since been added through the entire corridor. The district also records more than 100 registered geocaches placed along the trail.
From the trailhead near Highway 79 in Valparaiso, where parking is provided for horse trailers, the trail follows the Bates Branch of Oak Creek out of town for several miles. Loma marks the approximate halfway point and is home to St. Luke's Czech Catholic Shrine. Just before Brainard the trail follows the top of a scenic ridge, and Brainard has a village park and swimming pool. The district reports parking and restrooms in all three communities.
Sources checked Oct 18, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
The Federal Railroad Administration's national rail map marks 93% of this route as a trail on former railroad right-of-way.
- Shade
12% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to June and August to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
David City, 21.9 km from the trail's middle, 10 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 31 36 49 61 72 82 86 84 77 64 48 35 Low °F 12 15 26 36 49 60 64 62 53 40 26 16 Precipitation, in 0.8 0.9 1.7 3 4.5 4.9 3.1 4 2.8 2.2 1.4 1.1 Snow, in 8 7.4 5.1 1.9 0 0 0 0 0 0.9 2.4 6.1 - Old maps
USGS topographic maps of the trail's middle go back to the 1899 Wahoo sheet (1:125,000); the 1969 Valparaiso SW sheet (1:24,000) shows the area at mid-century. Browse all 6 maps in topoView.
Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationOak Creek Trail - Great Plains Trail Network
- Agency noticesOak Creek Trail - Lower Platte South NRD
- RedditSearch Reddit: r/Nebraska
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 6093045, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Official trail website · Official site · checked Oct 31, 2026
- Oak Creek Trail - Lower Platte South Natural Resources District · organization · checked Oct 18, 2026 Supports: railbanking 1993, opening 1996, Union Pacific, equestrian trail, geocaches, Valparaiso trailhead, Bates Branch, limestone surface, Loma, shrine, ridge, Brainard park and pool, parking and restrooms
- Oak Creek Trail - Great Plains Trail Network · organization · checked Oct 18, 2026 Supports: 13.2 miles, Valparaiso to Brainard through Loma, crushed limestone
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.