Oak Parkway Trail
Greenway in California
Runs through Folsom · Sacramento County
Conditions now
Loading the weather near Folsom…
Forecast by the National Weather Service for Folsom · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Rebecca Way mile 1.4 directions to trailhead 1
- Parking at Montrose Drive mile 1.9 directions to trailhead 2
(opens in a new tab) About this trail
The Oak Parkway Trail is a paved bike and pedestrian path in Folsom, Sacramento County, California, and one of the main corridors of the City of Folsom's Class I trail system. The city's trails and bikeways map lists it with the Humbug-Willow Creek Trail, the Folsom Rail Trail and the Folsom Lake Trail, running between Blue Ravine Road and East Natoma Street, in a network the map puts at more than 50 miles of developed Class I paths.
The trail runs east-west across the city, passing B.T. Collins Park. In 2015 the city hired HELIX Environmental Planning for the environmental work on an Oak Parkway Trail undercrossing, meant to give riders a separated Class I link between the Johnny Cash Trail and the Oak Parkway Trail in place of bike lanes; OpenStreetMap now shows a path undercrossing at the trail's west end, near East Natoma Street and the Johnny Cash Trail. In 2023 the city filed its Class I Trail Connections Project, part of the Active Transportation Plan adopted in June 2022, which includes two links along the Oak Parkway Trail: an 800-foot path to Willow Creek Drive replacing a narrow, nonstandard shared path through B.T. Collins Park, and a 200-foot path to McFarland Drive.
This record maps about 2.3 miles in four pieces, asphalt with some concrete sections. An $18.5 million city water pipeline project, with work along the Oak Parkway Trail corridor, Oak Avenue Parkway and East Bidwell Street, was reported complete in September 2026.
Sources checked Oct 16, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
1% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: October to May. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Sacramento 5 ESE, 27.7 km from the trail's middle, 108 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 56 62 68 74 81 89 94 94 89 79 65 56 Low °F 41 44 47 49 54 59 61 61 59 53 45 41 Precipitation, in 3.9 3.6 2.8 1.4 0.9 0.2 0 0 0.1 0.9 1.8 3.5 Snow, in 0 0 0 0 0 0 0 0 0 0 0 0 - Old maps
USGS topographic maps of the trail's middle go back to the 1891 Sacramento sheet (1:125,000); the 1954 Folsom sheet (1:24,000) shows the area at mid-century. Browse all 14 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Johnny Cash Trail within 0.2 mi · 2.5 mi, paved
- Humbug-Willow Creek Trail within 0.2 mi · 5.6 mi, paved
- American River Bike Trail 0.5 mi away · 36.5 mi, paved
- Willow Creek Trail 0.6 mi away · 6.1 mi, paved
- American River Bike Trail (North Bank) 0.8 mi away · 5.4 mi, paved
- Folsom Parkway Rail Trail 1.2 mi away · 2.1 mi, surface unknown
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Class I Trail Connections Project (City of Folsom) — CEQAnet, State of California · government source · checked Oct 16, 2026 Supports: 2023 filing, Active Transportation Plan adopted June 2022, 800-foot Willow Creek Drive connection replacing a narrow nonstandard shared path through BT Collins Park, 200-foot McFarland Drive connection along the Oak Parkway Trail
- Folsom Trails and Bikeways map (City of Folsom, 2023), as posted by Folsom Times · press · checked Oct 16, 2026 Supports: main trail corridors including the Oak Parkway Trail between Blue Ravine Road and E. Natoma Street, more than 50 miles of developed Class I trails
- Major $18.5 million Folsom water pipeline project completed — Folsom Times · press · checked Oct 16, 2026 Supports: $18.5 million pipeline project, work along the Oak Parkway Trail corridor, Oak Avenue Parkway and East Bidwell Street, completion reported September 2026
- HELIX Provides Environmental Consulting for the Folsom Oak Parkway Trail Undercrossing Project — HELIX Environmental Planning · web · checked Oct 16, 2026 Supports: 2015 city contract for environmental work on an undercrossing linking the Johnny Cash Trail and Oak Parkway Trail with a Class I route instead of Class II facilities
- Oak Parkway Trail undercrossing (way 791157847) — OpenStreetMap contributors · web · checked Oct 16, 2026 Supports: undercrossing at the west end near East Natoma Street and the Johnny Cash Trail, asphalt and concrete surface, mapped extent of about 2.3 miles in four pieces, B.T. Collins Park beside the trail
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.