States › Kentucky

Ohio River Levee Trail

Greenway in Kentucky

Runs through Louisville · Jefferson County

Conditions now

Loading the weather near Louisville/Jefferson County metro government (balance)…

Forecast by the National Weather Service for Louisville/Jefferson County metro government (balance) · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
6.0 mi 9.7 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.

Ohio River Levee Trail (opens in a new tab)
Photo: Moogie · CC BY-SA 4.0 · Mapillary

About this trail

The Ohio River Levee Trail is a paved shared-use path along the Ohio River flood levee in southwest Louisville, Kentucky. It is part of the Louisville Loop, a planned ring of paved trail of about 100 miles around Jefferson County, and Louisville Metro Parks and Recreation designed the Loop's sections. It is a greenway, not a rail-trail. Wikipedia counts the Levee Trail as the Loop's second-oldest section, after the downtown Riverwalk. The city uses the name Ohio River Levee Trail for the whole river section of the Loop, which runs nearly 26 miles from the Big Four Bridge west along the river to the Mill Creek Generating Station. This record covers its southwest end.

The line on this page, drawn from OpenStreetMap, covers about 6.0 miles along the levee. It runs from near Riverview Park and Greenwood Road south to the Watson Lane Trailhead near the Mill Creek Generating Station. TrailLink gives the Watson Lane end, at Tennis Boulevard in Valley Village, as an end point of the Loop. To the north the levee path continues toward the Mill Creek Trail and the Riverwalk, which lead to downtown Louisville.

The southernmost stretch, 2.66 miles from Riverside, the Farnsley-Moremen Landing, to the Mill Creek Generating Station, opened in October 2015. It was the first addition to the levee section in seven years. Planning began in 2009, after the Kentuckiana Planning and Development Agency (KIPDA) and the Kentucky Transportation Cabinet secured $1.218 million in federal funding. A new trailhead at 7600 Watson Lane opened at the same time, with a drinking fountain, bike racks, benches, a TARC bus turnaround, parking and Louisville Loop wayfinding signs.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

1% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Louisville International Airport, 16 km from the trail's middle, 9 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F444858707886898882705847
Low °F283139485967717062503932
Precipitation, in3.43.44.64.85.24.343.73.73.73.44.1
Snow, in4.54.12.10.1000000.10.32.2
Old maps

USGS topographic maps of the trail's middle go back to the 1909 Kosmosdale sheet (1:48,000); the 1955 Kosmosdale sheet (1:24,000) shows the area at mid-century. Browse all 10 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. City of Parks (Louisville Loop section) — Wikipedia · organization · checked Oct 15, 2026
    Supports: Levee Trail as the second-oldest section of the Louisville Loop after the Riverwalk; Mill Creek Trail connecting the Levee Trail and the Riverwalk
  3. Louisville Loop opens another 2.6 miles of shared-use paths in Southwest Louisville — Broken Sidewalk (October 13, 2015) · web · checked Oct 15, 2026
    Supports: Ohio River Levee Trail section of the Louisville Loop, nearly 26 miles from the Big Four Bridge to the Mill Creek Station; 2.66-mile segment from Riverside, the Farnsley-Moremen Landing to the Mill Creek Generating Station; first addition to the section in seven years; planning from 2009 with $1.218 million in federal funding via KIPDA and KYTC; trailhead at 7600 Watson Lane and its amenities; planned 100-mile Loop
  4. Louisville Loop — TrailLink (Rails to Trails Conservancy) · web · checked Oct 15, 2026
    Supports: Loop sections designed by Louisville Metro Parks and Recreation; end point at Watson Lane and Tennis Blvd (Valley Village); off-road Levee Trail continuing from the Riverwalk; asphalt and concrete surface
  5. Ohio River Levee Trail — OpenStreetMap way 397735814 (one of the paved levee path ways of that name) · web · checked Oct 15, 2026
    Supports: trail name; paved path on the levee; with the other ways of the same name, mapped extent of about 6.0 miles from near Riverview Park and Greenwood Road to the Watson Lane Trailhead near the Mill Creek Generating Station

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.