Ohio River Trail
Greenway in Ohio · OpenStreetMap relation
Runs through Cincinnati · Hamilton County
Conditions now
Loading the weather near Cincinnati…
Forecast by the National Weather Service for Cincinnati · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Kellogg Road mile 0.2 · restrooms directions to trailhead 1
- Parking at Kellogg Road mile 0.2 directions to trailhead 2
- Parking at Kellogg Road mile 0.9 directions to trailhead 3
- Parking at Kellogg Road mile 1.1 directions to trailhead 4
- Trail Parking mile 1.2 directions to Trail Parking
- Parking at Kellogg Road mile 1.2 directions to trailhead 6
- Parking at Kellogg Road mile 1.2 directions to trailhead 7
- Parking at Kellogg Avenue mile 2 directions to trailhead 8
- Parking at Kellogg Avenue mile 2.1 directions to trailhead 9
- Parking at Waits Avenue mile 2.1 directions to trailhead 10
- Parking at Kellogg Avenue mile 2.5 directions to trailhead 11
- Parking at Kellogg Avenue mile 2.6 directions to trailhead 12
- Parking at Kellogg Avenue mile 2.6 directions to trailhead 13
- Parking at Kellogg Avenue mile 2.7 directions to trailhead 14
- Parking at Kellogg Avenue mile 2.7 directions to trailhead 15
- Parking at Kellogg Avenue mile 3.5 directions to trailhead 16
- Parking at Kellogg Avenue mile 3.6 directions to trailhead 17
- Trailhead at Kellogg Avenue mile 3.8 directions to trailhead 18
- Parking at Wilmer Avenue mile 5.2 directions to trailhead 19
- Parking at Airport Road mile 5.2 directions to trailhead 20
- Parking at Airport Road mile 5.3 directions to trailhead 21
- Parking at Wilmer Avenue mile 5.3 directions to trailhead 22
- Parking at Wilmer Avenue mile 5.3 directions to trailhead 23
- Parking at Alley #17 mile 5.6 directions to trailhead 24
- Parking at Kellogg Avenue mile 5.9 directions to trailhead 25
- Parking at Kellogg Avenue mile 6 · water directions to trailhead 26
- Parking at Kellogg Avenue mile 6.1 directions to trailhead 27
- Parking at Stanley Avenue mile 6.1 directions to trailhead 28
- Parking at Congress Avenue mile 6.2 directions to trailhead 29
- Parking at Strader Avenue mile 6.5 directions to trailhead 30
- Parking at Watson Street mile 6.9 · restrooms directions to trailhead 31
- Parking at Parsons Street mile 9.6 directions to trailhead 32
- Parking at Ted Gregory Way mile 9.7 directions to trailhead 33
- Parking at Kilgour Street mile 10 · water directions to trailhead 34
- Sawyer Point Parking Lot mile 10.1 · restrooms · water directions to Sawyer Point Parking Lot
- Parking at Butler Street mile 10.2 · restrooms · water directions to trailhead 36
- Parking at Pike Street mile 10.3 · water directions to trailhead 37
- Public Landing mile 10.5 · restrooms directions to Public Landing
- Lot E mile 11.2 directions to Lot E
- Parking at West Mehring Way mile 11.3 directions to trailhead 40
(opens in a new tab) About this trail
The Ohio River Trail is a path being built along the north bank of the Ohio River in Cincinnati, Ohio. The City of Cincinnati's bicycle program says it will span 23 miles from Coney Island through downtown to Sayler Park, and that it will complete the connection from downtown to the Little Miami Scenic Trail. About 7.9 miles are mapped here, in several pieces between downtown and Kellogg Road to the east.
The city lists completed segments of 0.5 mile along Mehring Way from Main Street to Broadway Street, 0.6 mile through T.M. Berry International Friendship Park, and 3.9 miles between Corbin Street and Salem Road. A segment announced in 2012 was to repurpose one westbound lane of the Kellogg Avenue bridge as a separated route for pedestrians and bicyclists, linking the Lunken Airport Trail in the East End with the Magrish Nature Preserve near Salem Road in Mount Washington and the Schmidt ballfield on Riverside Drive. East of Salem Road, the 2.2-mile Salem Road to Sutton Road segment follows the river side of Kellogg Avenue to close the gap between the trail ending at Salem Road and the trail ending at Sutton Road. It received $4 million in federal Congestion Mitigation and Air Quality funding; construction began in October 2019, with completion expected in winter 2020.
On the western side of the city the trail has been completed at Fernbank Park, and the city planned two more western segments.
Sources checked Oct 14, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
13% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to June and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Cincinnati Lunken Airport, 1.8 km from the trail's middle, 4 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 41 45 55 67 75 83 87 86 80 68 55 45 Low °F 24 26 33 42 53 61 65 64 56 44 34 28 Precipitation, in 2.9 2.8 3.9 4.4 4.7 4.6 4.4 3.4 3.1 3 2.9 3.3 - On the National Register
- Ida Street Viaduct, Cincinnati · structure, listed 1980 · nomination file for Ida Street Viaduct
- Newport and Cincinnati Bridge, Cincinnati · structure, listed 2001
- Newport and Cincinnati Bridge, Newport · structure, listed 2001 · nomination file for Newport and Cincinnati Bridge
- SHOWBOAT MAJESTIC, Cincinnati · structure, listed 1980 · nomination file for SHOWBOAT MAJESTIC
- MAJESTIC, Cincinnati · structure, listed 1989
- Mansion Hill Historic District, Newport · historic district, listed 1980 · nomination file for Mansion Hill Historic District
- Fulton-Presbyterian Cemetery, Cincinnati · site, listed 1979 · nomination file for Fulton-Presbyterian Cemetery
- Old maps
USGS topographic maps of the trail's middle go back to the 1898 East Cincinnati sheet (1:62,500); the 1955 Newport sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- RedditSearch Reddit: r/Ohio
Nearby trails
- Licking River Greenway 0.9 mi away · 1.8 mi, gravel · Kentucky
- Little Miami Scenic Trail 1.4 mi away · 78.1 mi, paved
- Wasson Way 1.7 mi away · 4.7 mi, paved
- Armleder Trail 1.7 mi away · 2.5 mi, paved
- Murray Path 2.8 mi away · 2.1 mi, paved
- Five Mile Trail 3.0 mi away · 2.8 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 562678, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Trails — Bikes, City of Cincinnati · government source · checked Oct 14, 2026 Supports: 23 miles from Coney Island through downtown to Sayler Park; connection to the Little Miami Scenic Trail; completed segments on Mehring Way, through T.M. Berry International Friendship Park and from Corbin Street to Salem Road; Fernbank Park; two more western segments planned
- Ohio River Trail: Lunken To Salem — Bikes, City of Cincinnati (June 18, 2012) · government source · checked Oct 14, 2026 Supports: westbound lane of the Kellogg Avenue bridge repurposed; Lunken Airport Trail to Magrish Nature Preserve near Salem Road; Schmidt ballfield on Riverside Drive
- Ohio River Trail: Salem Road To Sutton Road — Bikes, City of Cincinnati · government source · checked Oct 14, 2026 Supports: 2.2-mile segment on the river side of Kellogg Avenue; closes gap between Salem Road and Sutton Road; $4 million CMAQ grant; construction began October 2019, completion expected winter 2020
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.