States › New York

Onondaga Creekwalk

Greenway in New York

Runs through Syracuse · Onondaga County

Conditions now

Loading the weather near Syracuse…

Forecast by the National Weather Service for Syracuse · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
4.3 mi 6.9 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Harborside Drive mile 0.1 directions to trailhead 1
  2. Parking at Harborside Drive mile 0.2 directions to trailhead 2
  3. Parking at Hiawatha Boulevard West mile 0.4 directions to trailhead 3
  4. Parking at Harborside Drive mile 0.4 directions to trailhead 4
  5. Parking at Harborside Drive mile 0.5 directions to trailhead 5
  6. Parking at Hiawatha Boulevard West mile 0.6 directions to trailhead 6
  7. Parking at Hiawatha Boulevard West mile 0.6 directions to trailhead 7
  8. Parking at Hiawatha Boulevard West mile 0.6 directions to trailhead 8
  9. Parking at Bear Street West mile 0.9 directions to trailhead 9
  10. Parking at West Kirkpatrick Street mile 1.1 directions to trailhead 10
  11. Parking at West Kirkpatrick Street mile 1.2 directions to trailhead 11
  12. Parking at Spencer Street mile 1.3 directions to trailhead 12
  13. Parking at Spencer Street mile 1.3 directions to trailhead 13
  14. Parking at Spencer Street mile 1.4 directions to trailhead 14
  15. Parking at Spencer Street mile 1.4 directions to trailhead 15
  16. Parking at West Division Street mile 1.5 directions to trailhead 16
  17. Parking at Maltbie Street mile 1.5 directions to trailhead 17
  18. Parking at Plum Street mile 1.6 directions to trailhead 18
  19. Parking at Plum Street mile 1.6 directions to trailhead 19
  20. Parking at Evans Street mile 1.6 directions to trailhead 20
  21. Parking at Plum Street mile 1.7 · water directions to trailhead 21
  22. Parking at Plum Street mile 1.7 · water directions to trailhead 22
  23. Parking at Plum Street mile 1.7 directions to trailhead 23
  24. Parking at North Franklin Street mile 1.8 · water directions to trailhead 24
  25. Parking at Evans Street mile 1.8 directions to trailhead 25
  26. National Grid Lot mile 1.9 directions to National Grid Lot
  27. Parking at Herald Place mile 1.9 directions to trailhead 27
  28. Parking at West Genesee Street mile 1.9 directions to trailhead 28
  29. Parking at Herald Place mile 1.9 directions to trailhead 29
  30. Parking at Wallace Street mile 1.9 directions to trailhead 30
  31. Parking at Wallace Street mile 2 directions to trailhead 31
  32. Parking at West Genesee Street mile 2 directions to trailhead 32
  33. Parking at West Genesee Street mile 2 directions to trailhead 33
  34. Parking at North Franklin Street mile 2.1 directions to trailhead 34
  35. Parking at West Willow Street mile 2.1 directions to trailhead 35
  36. Federal Lot mile 2.2 directions to Federal Lot
  37. Parking at Erie Boulevard West mile 2.2 directions to trailhead 37
  38. Parking at West Washington Street mile 2.3 directions to trailhead 38
  39. Parking at West Washington Street mile 2.3 directions to trailhead 39
  40. Parking at Walton Street mile 2.4 directions to trailhead 40
  41. Parking at West Fayette Street mile 2.4 directions to trailhead 41
  42. Parking at West Jefferson Street mile 2.5 directions to trailhead 42
  43. Parking at West Fayette Street mile 2.5 directions to trailhead 43
  44. Parking at Walton Street mile 2.5 directions to trailhead 44
  45. Parking at West Jefferson Street mile 2.5 directions to trailhead 45
  46. Parking at Walton Street mile 2.5 directions to trailhead 46
  47. Parking at West Fayette Street mile 2.5 directions to trailhead 47
  48. Parking at West Fayette Street mile 2.5 directions to trailhead 48
  49. Parking at West Jefferson Street mile 2.6 directions to trailhead 49
  50. Parking at Seymour Street mile 2.9 directions to trailhead 50
  51. Parking at West Onondaga Street mile 3 directions to trailhead 51
  52. Parking at South West Street mile 3 directions to trailhead 52
  53. Parking at West Onondaga Street mile 3 directions to trailhead 53
  54. Parking at Midland Avenue mile 3 directions to trailhead 54
  55. Parking at Temple Street mile 3.1 directions to trailhead 55
  56. Parking at Temple Street mile 3.1 directions to trailhead 56
  57. Parking at West Onondaga Street mile 3.1 directions to trailhead 57
  58. Parking at Oxford Street mile 3.5 directions to trailhead 58
  59. Parking at Kirk Park Drive mile 4.5 directions to trailhead 59
  60. Parking at Hunt Avenue mile 4.5 directions to trailhead 60
Onondaga Creekwalk Franklin Square (opens in a new tab)
Onondaga Creekwalk Franklin Square · Photo: Kai Brinker · CC BY-SA 2.0 · Wikimedia Commons

About this trail

The Onondaga Creekwalk is a mostly paved, partly bricked, multi-use trail in Syracuse, Onondaga County, New York, running roughly parallel to Onondaga Creek from Kirk Park on the South Side through downtown Armory Square to Onondaga Lake. Wikipedia gives its length as 4.8 miles (7.7 km); the line in this record covers about 4.3 miles (6.9 km). The first three-eighths-mile section opened in September 1990. Phase 1, 2.6 miles (4.2 km) from Armory Square to the lake, was completed in October 2011. Phase 2, a 2.2-mile (3.5 km) extension from Armory Square south to Kirk Park, was declared complete in July 2020; public radio station WAER reported on July 1, 2020 that officials had cut the ribbon. A third phase to Dorwin Avenue is unbuilt.

From Armory Square the trail passes Franklin Square and the Inner Harbor and reaches the lake near Hiawatha Boulevard. A link from West Bear Street at Van Rensselaer Street to Hiawatha Boulevard West opened on December 31, 2020, connecting to the Loop the Lake Trail.

The stretch through Franklin Square has brick paving. The trail passes an old railroad bridge near Maltbie Street that once carried a rail spur, and in Phase 2 it runs under an elevated New York, Susquehanna and Western Railway bridge near South West Street. The northern end under the CSX mainline at the lake was announced closed indefinitely in fall 2018 after ice and waves eroded the pavement.

Sources checked Oct 31, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

NYC Watertown Branch, NYC West Shore and NYC former Main Line (New York Central / Conrail / Delaware Lackawanna & Western). From New York Abandoned Rail Lines (NYS OPRHP, 2020).

Shade

25% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Syracuse Hancock International Airport, 8.3 km from the trail's middle, 6 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F323442566977828073604837
Low °F161825364757626053423324
Precipitation, in2.62.533.53.43.63.93.73.43.93.23.3
Snow, in3430.319.830.100000.29.830.6
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1895 Syracuse sheet (1:62,500); the 1958 Syracuse West sheet (1:24,000) shows the area at mid-century. Browse all 11 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Onondaga Creekwalk — Wikipedia · organization · checked Oct 31, 2026
    Supports: mostly paved, partly bricked, 4.8 miles; trail approximately parallels Onondaga Creek from Kirk Park on the South Side through downtown at Armory Square to Onondaga Lake; first 3/8-mile section opened September 1990; Phase 1 completed October 2011, 2.6 miles to that point; Phase 2 a 2.2-mile extension declared complete July 2020; Phase 3 to Dorwin Avenue unbuilt; connection opened December 31, 2020 from West Bear Street at Van Rensselaer Street, linking to Hiawatha Boulevard West and the Loop the Lake Trail; old railroad bridge near Maltbie Street that carried a rail spur; trail passes under the elevated NYS&W bridge on South West Street in Phase 2; northern end under the CSX mainline announced closed indefinitely in fall 2018 by ice and wave erosion
  3. New Syracuse Creekwalk extension reaches into city's south side — WAER (July 1, 2020) · organization · checked Oct 31, 2026
    Supports: published July 1, 2020: ribbon cutting for the 2.2-mile extension from Armory Square to Kirk Park; phase one linked Armory Square to Onondaga Lake
  4. A stretch of tranquility in downtown Syracuse — Parks & Trails New York (trails blog) · organization · checked Oct 31, 2026
    Supports: brick paving (photo caption places it through the Franklin Square region); trail heads north from Armory Square through the Franklin Square neighborhood and the Inner Harbor area to Hiawatha Boulevard and the lake
  5. Onondaga Creekwalk — OpenStreetMap relation 14113371 · web · checked Oct 31, 2026
    Supports: relation tagged route=bicycle, network=lcn, cycle_network=US:NY:Syracuse, name Onondaga Creekwalk, 54 member ways

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.