States › Florida

Orlando Coast to Coast Gap Trail

Greenway in Florida · OpenStreetMap relation

Runs through Lockhart · Orange County

Conditions now

Loading the weather near Lockhart…

Forecast by the National Weather Service for Lockhart · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
3.5 mi 5.6 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.

Orlando Coast to Coast Gap Trail (opens in a new tab)
Photo: rking · CC BY-SA 4.0 · Mapillary

About this trail

The Orange County Gap Trail is a stretch of the Florida Coast-to-Coast Trail in Orange County, Florida, that the Florida Department of Transportation (FDOT) is building as a 12-foot-wide multi-use trail. The Florida Department of Environmental Protection says the Coast-to-Coast Trail will span approximately 250 miles (400 km) between St. Petersburg and Titusville and is 88 percent complete. FDOT's Segment 2, project 436433-1, is 3.619 miles (5.8 km) long and runs from the intersection of Clarcona-Ocoee Road and North Hiawassee Road to the junction of U.S. 441 (North Orange Blossom Trail), Apopka Boulevard and State Road 414 (Maitland Boulevard). FDOT's 2020 notice gave its length as 3.9 miles (6.3 km). Segment 1, 0.16 mile (0.26 km) from Clarcona-Ocoee Road to the West Orange Trail, is listed as completed, with construction started in spring 2020.

FDOT lists Segment 2 as in construction: the page gives a start of fall 2025, completion estimated for spring 2027, a cost of $11.7 million and Jr. Davis Construction Company, Inc. as contractor (page updated October 22, 2026). The project is part of FDOT's Shared-Use Nonmotorized (SUN) Trail network. The trail will remain at least 4 feet from the roadway, and the work will improve sidewalk conditions and safety at Clarcona-Ocoee Road, Beggs Road, Pine Hills Road and Orange Blossom Trail. The 2020 notice described the trail as running beside the existing roadway.

The mapped line covers about 3.5 miles (5.6 km) in many short pieces near Lockhart. OpenStreetMap tags its ways as cycleways with bicycles designated, one of them concrete, and names the route Orlando Coast to Coast Gap Trail. The FDOT pages do not say which stretches are open while construction continues.

Sources checked Oct 31, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

11% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: October to April. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Orlando Executive Airport, 14.2 km from the trail's middle, 11 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F717478838891929290847873
Low °F525458636973757574686054
Precipitation, in2.62.12.72.73.78.28.17.76.53.21.72.3
Old maps

USGS topographic maps of the trail's middle go back to the 1955 Orlando sheet (1:250,000); the 1956 Orlando West sheet (1:24,000) shows the area at mid-century. Browse all 7 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 21714910, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Florida Coast-to-Coast Trail — Florida Department of Environmental Protection · government source · checked Oct 31, 2026
    Supports: will span approximately 250 miles; links communities between St. Petersburg and Titusville; currently 88 percent complete
  3. 436433-1 Coast to Coast Trail - Orange County Gap Trail Segment 2 — CFLRoads (FDOT) · web · checked Oct 31, 2026
    Supports: name Orange County Gap Trail Segment 2; approximately 3.6-mile, 12-foot-wide multi-use trail; Clarcona-Ocoee Road and North Hiawassee Road to U.S. 441, Apopka Boulevard and S.R. 414; 3.619 miles; SUN Trail network; at least 4 feet from the roadway; improvements at Clarcona-Ocoee Road, Beggs Road, Pine Hills Road and Orange Blossom Trail; construction phase, start fall 2025, estimated completion spring 2027; $11.7 million; Jr. Davis Construction Company, Inc.; updated 10/22/2026
  4. 436435-1 Orange County Gap Segment 1 from Clarcona-Ocoee Road to West Orange Trail — CFLRoads (FDOT) · web · checked Oct 31, 2026
    Supports: Segment 1: .160 miles from Clarcona-Ocoee Road to the West Orange Trail; completed; project start spring 2020
  5. Learn About Plans for the New Orange County Gap Trail — CFLRoads (FDOT news release, January 3, 2020) · web · checked Oct 31, 2026
    Supports: Segment 2 described as 3.9 miles; new trail from Hiawassee Road to north of State Road 414 adjacent to the existing roadway; part of the Coast to Coast Trail
  6. Orlando Coast to Coast Gap Trail — OpenStreetMap relation 21714910 · web · checked Oct 31, 2026
    Supports: route name; cycleway ways tagged bicycle=designated, one with surface=concrete

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.