Paint Creek to Polly Ann Trail Connector
Greenway in Michigan
Runs through Orion Township · Oakland County
Conditions now
Loading the weather near Lake Orion…
Forecast by the National Weather Service for Lake Orion · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at West Clarkston Road mile 1.1 directions to trailhead 1
- Parking at West Clarkston Road mile 1.4 directions to trailhead 2
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Paint Creek to Polly Ann Trail Connector is a pathway of about 3 miles in Orion Township, Oakland County, Michigan, linking the north end of the Paint Creek Trail with the Polly Ann Trail. Orion Township led the project, which was built in phases over several years; the final section, connecting to the Paint Creek Trail, was completed in fall 2020. Both trails it joins are part of the statewide Iron Belle Trail.
The connector follows Clarkston Road. At its east end, a pedestrian bridge crosses Paint Creek just north of Clarkston and Kern roads, where the Paint Creek Trail has two parking lots. The Paint Creek Trailways Commission describes the link as a bridge and pathway built by the Charter Township of Orion.
SEMCOG reported in November 2020 that the township had finished a large section of trailway along Clarkston Road in 2019 with $267,600 in Michigan Natural Resources Trust Fund grants and local funds, and that the new bridge drew $1.6 million in Transportation Alternatives Program funds. OHM Advisors, the township's engineer, describes the wider Clarkston Road Regional Pathway as about 5.8 miles long, with a 1,400-foot boardwalk along Elkhorn Lake, and reports that it was completed in 2020.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
23% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Pontiac Wwtp, 14.3 km from the trail's middle, 38 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 31 34 44 58 69 78 82 81 74 60 47 36 Low °F 17 18 26 36 49 59 63 62 54 42 32 24 Precipitation, in 2.2 1.9 2.2 2.9 3.8 3.3 3.1 3.2 2.9 2.9 3.1 2.2 Snow, in 12.1 9 4.1 0.9 0 0 0 0 0 0.1 1.7 8.1 - Old maps
USGS topographic maps of the trail's middle go back to the 1943 Lake Orion sheet (1:24,000); the 1945 Lake Orion sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Paint Creek Trail within 0.2 mi · 8.9 mi, dirt
- Polly Ann Trail within 0.2 mi · 35.4 mi, crushed stone
- Connector Trail (Addison Oaks) 3.3 mi away · 2.3 mi, gravel
- Buhl Lake Loop 3.6 mi away · 2.5 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Frequently Asked Questions — Paint Creek Trailways Commission · organization · checked Oct 15, 2026 Supports: Polly Ann Connector is a bridge and pathway near Clarkston and Kern roads built by the Charter Township of Orion; two parking lots at Clarkston and Kern roads
- Spotlight on…Orion Township: A Pure Michigan Trail Town — SEMCOG (November 17, 2020) · organization · checked Oct 15, 2026 Supports: 2019 completion of a large Clarkston Road trailway section, $267,600 in MNRTF grants and local funds, $1.6 million in Transportation Alternatives Program funds for the pedestrian bridge
- Paint Creek Trail introduces upgrades, including new 3-mile connector pathway — Metromode (February 4, 2021) · web · checked Oct 15, 2026 Supports: 3-mile length, link between the Paint Creek and Polly Ann trails, Orion Township led the multi-year project, final section completed fall 2020, bridge just north of Clarkston and Kern roads, Iron Belle Trail
- Orion Township - Clarkston Road Regional Pathway — OHM Advisors · web · checked Oct 15, 2026 Supports: Clarkston Road Regional Pathway about 5.8 miles, 1,400-foot boardwalk along Elkhorn Lake, completed 2020, along the Clarkston Road portion of the Iron Belle Trail
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.