Park Depot Greenway Trail
Greenway in North Carolina
Runs through Fuquay-Varina · Wake County
Conditions now
Loading the weather near Fuquay-Varina…
Forecast by the National Weather Service for Fuquay-Varina · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Park Depot Greenway Lot mile 0 directions to Park Depot Greenway Lot
- Parking mile 1.5 directions to trailhead 2
- Parking at Kennebec Road mile 1.6 directions to trailhead 3
- Parking at Kennebec Road mile 1.6 directions to trailhead 4
No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Park Depot Greenway Trail is a paved greenway of about 2 miles in Fuquay-Varina, North Carolina, operated by the town's Parks, Recreation and Cultural Resources department. It starts at Old Honeycutt Road Park and connects to the South Lakes Greenway; the town lists parking at the park, 101 Fitness Drive.
An extension that opened at the end of January 2021 added 1,870 linear feet of paved or boardwalk greenway, carrying the trail from Old Honeycutt Park through the South Lakes subdivision with connections to Willow Spring High School and South Lakes Elementary School. The $1.2 million extension was paid for entirely with grants: $256,000 from a Wake County Facilities grant and $1 million from CAMPO. Moffat Pipe was the contractor and Kimley-Horn the engineering firm.
OpenStreetMap maps the trail as asphalt, with several wooden bridges, designated for bicycles and pedestrians. Town greenway rules ask users to stay on the trail surface, yield to traffic at crossings and not smoke or vape.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
43% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: February to May and October to December. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Raleigh 4 SW, 18.2 km from the trail's middle, 34 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 54 58 65 74 80 87 90 88 83 74 64 56 Low °F 33 35 41 49 58 66 70 68 63 51 41 36 Precipitation, in 3.9 3.1 4.2 3.8 3.8 5.7 4.7 5.4 5.1 3.9 3.4 3.6 - Old maps
USGS topographic maps of the trail's middle go back to the 1953 Raleigh sheet (1:250,000); the 1964 Angier sheet (1:24,000) shows the area at mid-century. Browse all 7 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Hilltop Needmore Park - Yellow Loop 3.4 mi away · 1.8 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Park Depot Greenway — Town of Fuquay-Varina · organization · checked Oct 17, 2026 Supports: extension opened end of January 2021; 1,870 linear feet of paved or boardwalk greenway; route through South Lakes subdivision; school connections; about 2 miles; $1.2 million cost and grant amounts; contractor and engineering firm
- Trails and Greenways — Town of Fuquay-Varina · organization · checked Oct 17, 2026 Supports: operated by Parks, Recreation and Cultural Resources; starts at Old Honeycutt Road Park and connects to South Lakes Greenway; 2 miles; parking at 101 Fitness Drive; greenway rules
- OpenStreetMap way 696439817 (Park Depot Greenway Trail) — OpenStreetMap contributors · web · checked Oct 17, 2026 Supports: asphalt surface with wooden bridges; designated for bicycles and pedestrians
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.