States › Florida

Paved Multi-Use

Greenway in Florida · OpenStreetMap relation

Runs through Liberty Triangle · Marion County

Conditions now

Loading the weather near Liberty Triangle…

Forecast by the National Weather Service for Liberty Triangle · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Managed by Florida State Parks.

Length
13.5 mi 21.8 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Southwest 16th Avenue mile 7.5 · restrooms directions to trailhead 1
  2. Parking at Southeast 80th Street mile 13.2 · restrooms · water directions to trailhead 2
  3. Disabled mile 13.3 · restrooms · water directions to Disabled
  4. Parking at Southeast 80th Street mile 13.3 · restrooms · water directions to trailhead 4
  5. Parking at Southeast 80th Street mile 13.3 · restrooms · water directions to trailhead 5
Florida I75sb SW Florida Trail Overpass (opens in a new tab)
Florida I75sb SW Florida Trail Overpass · Photo: Michael Rivera · CC BY-SA 4.0 · Wikimedia Commons

About this trail

This record, named "Paved Multi-Use" after a generic OpenStreetMap label on a route that lists Florida State Parks as operator, is the paved multi-use trail of the Marjorie Harris Carr Cross Florida Greenway in Marion County, Florida. It runs about 13.5 miles on the map from the Santos Trailhead, just north of Belleview, west across Interstate 75 to State Road 200. The greenway is a corridor more than 1.5 miles wide in places along the route of the Cross Florida Barge Canal, a project cancelled in 1971 and deauthorized by Congress in 1990; the greenway is named for Marjorie Harris Carr, who led the opposition to the canal, and the land passed to the Florida State Parks system. In February 2018 Marion County, the Florida Department of Environmental Protection and the Florida Department of Transportation announced the completion of the trail's Santos and Land Bridge phases.

From Santos the asphalt trail runs about 6.5 miles west to the Landbridge Trailhead, passing under County Roads 475 and 475A and by the Florida Horse Park. About 1.1 miles farther it crosses I-75 on the Land Bridge, a landscaped overpass built for trail users and wildlife and shared by cyclists, hikers and horseback riders. The trail continues about 2.5 miles to a quarter-mile connector from the 49th Avenue Trailhead, then about 5.5 miles more, passing under SW 49th Avenue and County Road 484, to State Road 200 just north of the Ross Prairie Trailhead, where the pavement ends at roadside parking.

Mountain-bike trails, horse trails and the Florida Trail cross and parallel the paved route; the Santos singletrack system is built and maintained by the Ocala Mountain Bike Association. Speed limits are posted for cyclists. The Santos Trailhead has parking, restrooms, showers, drinking water, picnic pavilions and camping, and the Landbridge Trailhead has paved parking, restrooms, water and an equestrian staging area.

Sources checked Oct 16, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

51% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: October to April. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Ocala, 14.7 km from the trail's middle, 6 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F717479848991929290847772
Low °F464852576470727270635448
Precipitation, in3.42.93.72.23.57.46.97.16.53.22.12.7
Old maps

USGS topographic maps of the trail's middle go back to the 1895 Ocala sheet (1:62,500); the 1968 Shady sheet (1:24,000) shows the area at mid-century. Browse all 7 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 20823374, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Marjorie Harris Carr Cross Florida Greenway — Wikipedia · organization · checked Oct 16, 2026
    Supports: greenway corridor more than 1.5 miles wide in places on the route of the Cross Florida Barge Canal; named for Marjorie Harris Carr, leader of the opposition; canal deauthorized by Congress in 1990 and handed to Florida State Parks, managed by DEP; land bridge over I-75 for trail users; canal project cancelled in 1971
  3. Marjorie Harris Carr Cross Florida Greenway — Highlanders Chapter, Florida Trail Association · organization · checked Oct 16, 2026
    Supports: Santos Trailhead just north of Belleview; trail west to SR 200 crossing the land bridge over I-75
  4. New sections of Cross Florida Greenway open — WOGX FOX 51 Gainesville (February 27, 2018) · web · checked Oct 16, 2026
    Supports: Marion County Board of County Commissioners, DEP and FDOT announced completion of the Santos and Land Bridge phases of the greenway trail
  5. Cross Florida Greenway eco-biking — 100 Florida Trails · web · checked Oct 16, 2026
    Supports: segment distances Santos to Landbridge Trailhead (6.5 mi), to the Landbridge (1.1 mi), to 49th Avenue Trailhead (2.5 mi, quarter-mile connector), to SR 200 (5.5 mi) just north of Ross Prairie Trailhead; underpasses at CR 475, CR 475A, SW 49th Ave and CR 484; Florida Horse Park; Land Bridge shared by bikers, hikers and equestrians, planters and viewing area; end of pavement at SR 200 with roadside parking; mountain-bike, equestrian and Florida Trail crossings; posted speed limits; Santos and Landbridge trailhead amenities; Ocala Mountain Bike Association maintains the Santos trails
  6. OpenStreetMap relation 20823374 · web · checked Oct 16, 2026
    Supports: the name Paved Multi-Use, operator Florida State Parks, and the mapped route of about 13.5 miles from Santos to SR 200

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.