States › New Jersey

Pequest WMA Trail

Rail-trail in New Jersey

Runs through White Township and Liberty Township · Warren County

Conditions now

Loading the weather near Mountain Lake…

Forecast by the National Weather Service for Mountain Lake · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
4.1 mi 6.7 km1
Surface
Dirt1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Pequest Trout Hatchery mile 2.6 directions to trailhead 1
  2. Parking at Pequest Road mile 4.1 directions to trailhead 2
Pequest River Viaduct, beside the trail (opens in a new tab)
Pequest River Viaduct, beside the trail · Photo: WallyFromColumbia · CC BY-SA 3.0 · Wikimedia Commons

About this trail

The Pequest WMA Trail follows about 4 miles of the abandoned Lehigh and Hudson River Railway through the Pequest Wildlife Management Area in Warren County, New Jersey. The New Jersey Division of Fish and Wildlife describes the area as more than 5,000 acres off Route 46, home to the Pequest Trout Hatchery and Natural Resource Education Center. The railway's Belvidere–Greycourt, New York, line opened in full on August 14, 1882. The company filed for bankruptcy in 1972, Conrail abandoned the route between Warwick, New York, and Belvidere during the 1980s, and in 1988 the track between Limecrest and Belvidere was sold to a land developer and removed.

The trail runs west from Janes Chapel Road in Oxford and crosses the Pequest River four times, once beneath the Pequest Viaduct, which carried the Lackawanna Old Road over the river. Remains of signal towers, ties and concrete mile markers survive along the grade. At Buttzville, where US 46 meets NJ 31, two abandoned railroad bridges cross one over the other, and the bed is reached down a steep embankment from the parking area. Between NJ 31 and Pequest Furnace Road a second line ran higher on the hillside; it turned south just before Pequest Furnace Road, and part of it is now the Oxford Bikeway. A large parking area sits on the east side of Pequest Furnace Road.

TrailLink lists 4.2 miles of ballast, cinder, dirt and gravel and calls the trail much better suited to walking than to biking: some river bridges are not decked and consist only of the original railroad ties, though the bridge at Pequest Furnace Road is decked. Under Division rules described in 2016, mountain biking on wildlife management areas is allowed on existing trails and secondary roads from March 1 to April 15, from June 1 to September 15 and on Sundays, and on major designated trails year-round.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

78% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Belvidere Brg, 10.2 km from the trail's middle, 50 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F364048617179848376645241
Low °F181926364656605952403024
Precipitation, in3.22.73.644.14.54.84.54.64.83.34.1
Snow, in9.95.23.50.30000000.44
Old maps

USGS topographic maps of the trail's middle go back to the 1888 Hackettstown sheet (1:62,500); the 1954 Washington sheet (1:24,000) shows the area at mid-century. Browse all 16 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. New Jersey's Wildlife Management Areas (Paul Tarlowe, June 1999, updated December 2016) — NJDEP Division of Fish & Wildlife · government source · checked Oct 14, 2026
    Supports: Pequest WMA of more than 5,000 acres off Route 46 in Warren County, Pequest Trout Hatchery and Natural Resource Education Center, mountain-biking seasons and year-round use of major designated trails on WMAs
  3. Lehigh and Hudson River Railway — Wikipedia · organization · checked Oct 14, 2026
    Supports: trail on the L&HR grade, Belvidere–Greycourt line opened August 14, 1882, 1972 bankruptcy, Conrail abandonment Warwick–Belvidere in the 1980s, 1988 sale and removal of Limecrest–Belvidere track, trail west from Janes Chapel Road in Oxford, four Pequest River crossings, Pequest Viaduct carrying the Lackawanna Old Road, signal tower remains, ties and concrete mile markers
  4. Pequest Wildlife Management Area Trail — TrailLink · web · checked Oct 14, 2026
    Supports: 4.2 miles between Pequest Road and NJ 31, ballast/cinder/dirt/gravel surface, better suited to walking than biking, undecked bridges with original ties, decked bridge at Pequest Furnace Road, Buttzville bridges and steep embankment at US 46/NJ 31, parallel upper and lower lines, upper line now partly the Oxford Bikeway, parking on the east side of Pequest Furnace Road

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.