States › Michigan

Pere Marquette State Trail

Rail-trail in Michigan · OpenStreetMap relation

Runs through Baldwin, Yates Township, Richmond Township (Osceola County), Reed City, Evart, Sylvan Township (Osceola County), Garfield Township (Clare County), Surrey Township and 10 more · Lake, Osceola and Clare counties

All 18 towns and places

Baldwin, Pleasant Plains Township, Yates Township, Cherry Valley Township, Chase Township, Richmond Township (Osceola County), Reed City, Hersey, Hersey Township, Evart Township, Evart, Osceola Township (Osceola County), Sylvan Township (Osceola County), Orient Township, Garfield Township (Clare County), Surrey Township, Farwell and Grant Township (Clare County)

Conditions now

Loading the weather…

Forecast by the National Weather Service · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

The Pere Marquette State Trail is a bicycle and multi-use trail in lower Michigan, running 55 miles (89 km) through Clare, Lake, and Osceola Counties. Intersecting with the White Pine Trail in Reed City, the trail is paved in areas, with a ballast or cinder surface elsewhere. The trail's western terminus is the Village of Baldwin with the City of Clare as its eastern terminus. From Baldwin east to The Pere Marquette State Trail is open to non-motorized uses. Except for a gap at its eastern end as the trail enters the City of Clare, it is developed on a former railroad bed. From the City of Clare southeast to Midland, the trail continues as the Pere Marquette Rail Trail.

From Wikipedia3 (CC BY-SA). Help improve the article and it improves here.

Managed by Michigan DNR Parks and Recreation Division.2

Length
56.4 mi 90.8 km1
On former railbed
53.3 mi 95%
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at 9th Street mile 0.1 directions to trailhead 1
  2. Parking at West Upton Avenue mile 17.5 directions to trailhead 2
  3. Parking at East Lincoln Avenue mile 18 directions to trailhead 3
  4. Parking at North Main Street mile 21.2 directions to trailhead 4
  5. Parking at Mill Site Road mile 21.3 directions to trailhead 5
  6. Parking at 10th Street mile 30.7 directions to trailhead 6
  7. Rail trail parking mile 31.1 · restrooms · water directions to Rail trail parking
  8. Parking at South Pine Street mile 31.1 · restrooms · water directions to trailhead 8
  9. Parking at South Pine Street mile 31.1 · restrooms · water directions to trailhead 9
  10. Parking at South Pine Street mile 31.1 · restrooms · water directions to trailhead 10
  11. Parking at East Railroad Avenue mile 31.2 · restrooms · water directions to trailhead 11
  12. Parking at East Railroad Avenue mile 31.2 · water directions to trailhead 12
  13. Parking at East Railroad Avenue mile 31.2 · restrooms · water directions to trailhead 13
  14. Parking at North River Street mile 31.3 directions to trailhead 14
  15. Parking at North River Street mile 31.3 directions to trailhead 15
  16. Parking at 6 Mile Road mile 31.5 · restrooms directions to trailhead 16
  17. Parking at 80th Avenue mile 31.9 directions to trailhead 17
  18. Parking mile 40.7 directions to trailhead 18
  19. Parking at Lake Station Avenue mile 44 directions to trailhead 19
  20. Parking at Mystic Lake Road mile 44 directions to trailhead 20
  21. Parking at Mill Street mile 51.6 directions to trailhead 21
  22. Parking at North Corning Street mile 51.7 directions to trailhead 22
  23. Parking at East Main Street mile 52.4 directions to trailhead 23
  24. Trailhead Parking mile 54.8 directions to Trailhead Parking
  25. Parking at East Ludington Drive mile 54.8 directions to trailhead 25
  26. Parking at George Street mile 56.1 directions to trailhead 26
Pere Marquette State Trail 2022 (opens in a new tab)
Pere Marquette State Trail 2022 · Photo: Notorious4life (talk) (Uploads) · CC0 · Wikimedia Commons

About this trail

The Pere Marquette State Trail is a rail-trail of about 55 miles in Lake, Osceola and Clare counties in Michigan's Lower Peninsula, running between the village of Baldwin and the city of Clare. The Michigan Department of Natural Resources manages it through its Parks and Recreation Division. The trail follows the route on which the Pere Marquette Railway ran trains west past Baldwin to Ludington and east to Saginaw; its successor, the Chesapeake and Ohio Railway, ended the Ludington–Saginaw trains in the latter months of 1949.

From Baldwin the trail runs about 17 miles to Reed City, crossing the Baldwin River and Sanborn Creek. In Reed City it meets the Fred Meijer White Pine Trail State Park, and a welcome center with restrooms occupies a depot modeled after the original 1892 station. The next 12 miles to Evart follow the Hersey and Muskegon rivers to a restored depot in downtown Evart. The final 26 miles cross the Muskegon River, pass through two tunnels, reach the trail's highest point at M-66 and continue past Lake Station and Farwell to the Clare Depot, where the Pere Marquette Rail-Trail continues 30 miles to Midland.

State trail data lists about 36 miles of asphalt in Osceola and Clare counties, about 18 miles of crushed limestone in Lake and Osceola counties and a short natural-surface section in Clare County. In 2011 the DNR resurfaced the last 11 miles between Farwell and Reed City with an asphalt mix suited to snowmobiles, giving a continuous 37 miles of pavement. A gap through the city of Clare at the trail's eastern end was closed in 2024; the city held the ribbon cutting at the Clare Union Depot trailhead on October 23, 2024.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

The Federal Railroad Administration's national rail map marks 90% of this route as a trail on former railroad right-of-way.

Shade

28% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Big Rapids Wtp, 23.9 km from the trail's middle, 31 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F283142556877817972584433
Low °F131220314353575547362819
Precipitation, in2.422.643.83.43.54.233.832.3
Snow, in17.8167.71.5000000.23.814.3
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1954 Midland sheet (1:250,000); the 1959 Evart sheet (1:62,500) shows the area at mid-century. Browse all 8 maps in topoView.

Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 4279469, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Michigan DNR Statewide Railtrails, Michigan · Government dataset · Michigan DNR dataset notice on DNRTrailsOPENDATA: "a public record ... no restrictions on the use, reproduction, or distribution of this dataset", as is, no warranty · checked Oct 31, 2026
    “managing_org from Michigan DNR Statewide Railtrails”
  3. “Pere Marquette State Trail”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
  4. Wikidata Q7167748, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
  5. Statewide Railtrails (DNRTrailsOPENDATA layer 16) — Michigan Department of Natural Resources GIS · government source · checked Oct 14, 2026
    Supports: managed and administered by DNR Parks and Recreation Division, counties (Lake, Osceola, Clare), surface mileage by county (asphalt about 36.5 mi, crushed limestone about 18 mi, about 2 mi natural surface in Clare County), open status, meets the Fred Meijer White Pine Trail in Osceola County
  6. Pere Marquette State Trail — Wikipedia · organization · checked Oct 14, 2026
    Supports: 55 miles, Clare, Lake and Osceola counties, Baldwin and Clare termini, former railroad bed, Pere Marquette Railway trains west to Ludington and east to Saginaw, C&O ended Ludington–Saginaw trains in late 1949, earlier gap entering Clare
  7. Rail – Trail Ribbon cutting held at Clare Depot — Clare County Review (November 2024) · press · checked Oct 14, 2026
    Supports: completion of the Clare Gap through the city, ribbon cutting October 23, 2024 at the Clare Union Depot trailhead
  8. Pere Marquette State Trail | Michigan Trails — TrailLink · web · checked Oct 14, 2026
    Supports: section lengths (17, 12 and 26 miles), Baldwin River and Sanborn Creek crossings, Reed City depot welcome center modeled after the 1892 station, Hersey and Muskegon rivers, Evart depot, Muskegon River bridge, two tunnels, high point at M-66, Lake Station, eastern end at the Clare Depot, White Pine Trail connection in Reed City, 30-mile Pere Marquette Rail-Trail to Midland
  9. Pere Marquette State Rail Trail Surfacing Project Complete: Celebration Planned — OutdoorHub (July 2011) · web · checked Oct 14, 2026
    Supports: 2011 DNR resurfacing of the final 11 miles between Farwell and Reed City with snowmobile-friendly asphalt, continuous 37 miles of asphalt

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.