States › Wisconsin

Pheasant Branch Creek Corridor Trail

Greenway in Wisconsin · OpenStreetMap relation

Runs through Middleton · Dane County

Conditions now

Loading the weather near Middleton…

Forecast by the National Weather Service for Middleton · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.5 mi 2.4 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Branch Street mile 1.5 directions to trailhead 1
Pheasant Branch Creek Corridor Trail (opens in a new tab)
Photo: vgxhc · CC BY-SA 4.0 · Mapillary

About this trail

The Pheasant Branch Creek Corridor Trail is a paved greenway along Pheasant Branch Creek in Middleton, Wisconsin, a suburb on the northwest side of Madison. A bicycle-route guide describes it as paved and in excellent condition, with its western end on Deming Way and its eastern end at County Highway M (Century Avenue), where riders cross at a stoplight into Pheasant Branch Conservancy. This record maps about 1.5 miles.

The path reaches the creek through Middleton's parks. The same guide says the North Fork Trail, which runs from Ed Tallard Park past Penni Klein Park and Middleton Firefighters Memorial Park, joins the corridor trail, and the U.S. Highway 12 Trail joins the North Fork Trail.

Heavy rain in 2018 washed out bridges and pavement along the corridor and eroded the banks. New bridges were installed and the trail was restored.

The neighboring Pheasant Branch Conservancy West Trail lies just across Century Avenue, inside the conservancy; the conservancy is owned by Dane County Parks, the Wisconsin DNR and the City of Middleton.

Sources checked Oct 18, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

55% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May and July to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Charmany Farm, 5.2 km from the trail's middle, 45 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F263143566878828072604532
Low °F101324354758626052392716
Precipitation, in1.51.62.44.14.65.54.74.13.62.92.22
Snow, in10.110.65.51.6000000.32.28.2
Old maps

USGS topographic maps of the trail's middle go back to the 1907 Cross Plains sheet (1:62,500); the 1962 Middleton sheet (1:24,000) shows the area at mid-century. Browse all 8 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 7212369, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Pheasant Branch Conservancy - Wisconsin Bike Trails · web · checked Oct 18, 2026
    Supports: paved corridor trail, ends at County Highway M (Century Avenue) and Deming Way, 2018 flood damage and restoration, North Fork Trail and U.S. Highway 12 Trail connections
  3. Pheasant Branch Conservancy - Dane County Parks · web · checked Oct 18, 2026
    Supports: conservancy ownership by Dane County Parks, Wisconsin DNR and City of Middleton
  4. OpenStreetMap · web · checked Oct 18, 2026
    Supports: mapped length, surface and location of the way(s)

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.