Putnam Greenway
Greenway in New York
Runs through New York and Bronx · Bronx County
Conditions now
Loading the weather near New York…
Forecast by the National Weather Service for New York · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.
(opens in a new tab) About this trail
The Putnam Greenway record is the stretch of the Putnam Trail in Van Cortlandt Park in the Bronx, New York City, about 1.4 miles long. Wikipedia's article on the park describes the Putnam Trail as 1.5 miles running north through the woods between the lawn and Van Cortlandt Lake, past the golf course and Tibbetts Brook, to the Yonkers line, and captions a photograph of it "Putnam Greenway".
The trail follows the former New York and Putnam Railroad line, whose Putnam Division carried freight and passengers between the Bronx and Putnam County from 1881 to 1958, with freight continuing later. The remains of the former Van Cortlandt Park station can be seen beside it. At the Yonkers line it meets the South County Trailway, which Westchester County Parks manages and which runs 14.1 miles to the North County Trailway in Eastview and is part of the Empire State Trail.
The park trail was unpaved, hard dirt that Norwood News reported in 2016 was difficult for wheelchairs and nearly impassable after heavy rain. According to Wikipedia, reconstruction began in August 2019 and the trail reopened in October 2020 as a paved path for pedestrians and bicyclists.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
NYC Putnam Division and Putnam Branch (Conrail). From New York Abandoned Rail Lines (NYS OPRHP, 2020).
- Shade
76% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to June and August to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Bronx, 7.5 km from the trail's middle, 5 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 40 43 50 61 72 81 86 84 77 66 54 45 Low °F 27 29 35 44 55 64 71 69 62 51 41 33 Precipitation, in 3.7 3.2 4.4 4 4.1 4.5 4.4 4.8 4.5 4.1 3.5 4.7 - Old maps
USGS topographic maps of the trail's middle go back to the 1891 Harlem sheet (1:62,500); the 1956 Yonkers sheet (1:24,000) shows the area at mid-century. Browse all 15 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- South County Trailway within 0.2 mi · 14.4 mi, paved
- Van Cortlandt Park Greenway within 0.2 mi · 1.3 mi, paved
- Mosholu Parkway Greenway 0.5 mi away · 1.8 mi, paved
- Bronx River Greenway 1.3 mi away · 18.8 mi, paved
- Manhattan West Side Bike Path 2.4 mi away · 12.6 mi, paved
- Mosholu-Pelham Greenway 2.5 mi away · 5.3 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Van Cortlandt Park - Wikipedia · organization · checked Oct 17, 2026 Supports: length, route, Putnam Greenway caption, railroad remains, 2019-2020 paving
- South County Trailway - Wikipedia · organization · checked Oct 17, 2026 Supports: Putnam Division 1881-1958, South County Trailway length, manager, Empire State Trail
- Old Putnam Trail plans up for community review again - Norwood News · organization · checked Oct 17, 2026 Supports: 2016 unpaved condition
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.