States › Massachusetts

Rabbit Run Rail Bed

Rail-trail in Massachusetts

Runs through New Salem and Petersham · Franklin and Worcester counties

Conditions now

Loading the weather near Petersham…

Forecast by the National Weather Service for Petersham · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
2.5 mi 4.0 km1
On former railbed
0.9 mi 36%
Surface
Surface unknown1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Old North Dana Road mile 0 directions to trailhead 1
Quabbin Reservoir from Rabbit Run Rail Bed, New Salem MA.jpg (opens in a new tab)
Quabbin Reservoir from Rabbit Run Rail Bed, New Salem MA.jpg · Photo: John Phelan · CC BY-SA 4.0 · Wikimedia Commons

About this trail

The Rabbit Run Rail Bed is a dirt route of about 2.5 miles in New Salem, Massachusetts, on the north side of the Quabbin Reservoir, starting at Gate 35 at the end of Old North Dana Road. Part of it follows the bed of the Springfield, Athol and North-eastern Railroad, a branch between Springfield and Athol that engineers nicknamed the "Rabbit Run" because its stations were close together. Chartered as the Athol and Enfield Railroad in 1869, the line opened in 1873 and was bought by the Boston and Albany Railroad in 1880. Most of the line closed in 1934 for the creation of the reservoir, and 36 miles of the branch were abandoned.

From the parking area at Gate 35, a dirt road runs about half a mile through woodland and then along the shore of the reservoir, a walk of about 3 miles out and back. The Western Massachusetts Scenic Byways guide describes the remnants of the rail bed and the connector road from Gate 35 as a 2-mile shoreline walkway open to the public for daytime hiking or bicycling.

The Quabbin watershed is managed by the Massachusetts Department of Conservation and Recreation, and to protect the water supply most areas around the reservoir are publicly accessible only by foot, with limited parking at some gates. Separately, the town of Athol plans a 6.2-mile Rabbit Run Trail on the remaining right-of-way in Athol and New Salem.

Sources checked Oct 13, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

60% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Orange Municipal Airport, 9.3 km from the trail's middle, 8 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F333745597079848274625039
Low °F141524344655605950393021
Precipitation, in2.72.33.43.43.24.13.83.94.34.23.43.4
Old maps

USGS topographic maps of the trail's middle go back to the 1887 Belchertown sheet (1:62,500); the 1952 Quabbin Reservoir sheet (1:24,000) shows the area at mid-century. Browse all 18 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Historic Railway

The line in its working days, from copies of old photographs, oldest first.

New Salem, c. 1901–1907: Station with passenger train
New Salem, c. 1901–1907: Station with passenger trainPhoto: H. C. Ellis (publisher) · Public domain · Wikimedia Commons (opens in a new tab)

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Springfield, Athol and North-eastern Railroad — Wikipedia · organization · checked Oct 13, 2026
    Supports: Rabbit Run nickname and its origin, 1869 charter, 1873 opening, Boston and Albany purchase 1880, closure of most of the line in 1934, planned 6.2-mile Rabbit Run Trail in Athol and New Salem
  3. Quabbin Reservoir — Wikipedia · organization · checked Oct 13, 2026
    Supports: DCR manages the watershed, 36 miles of the Athol Branch abandoned, most areas accessible only by foot with limited parking at gates
  4. Visit the Quabbin — Greenfield Recorder (2019) · web · checked Oct 13, 2026
    Supports: Gate 35: about half a mile of woodland then the shore, 3-mile out-and-back walk from Old North Dana Road in New Salem on a dirt road
  5. Rabbit Run Railroad — Western Massachusetts Scenic Byways · web · checked Oct 13, 2026
    Supports: rail bed and connector road from Gate 35 form a 2-mile shoreline walkway open for daytime hiking or bicycling

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.