Railroad Bed East
Rail-trail in Vermont
Runs through Town of Marshfield · Washington County
Conditions now
Loading the weather near Marshfield…
Forecast by the National Weather Service for Marshfield · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.
No photo of the trail itself yet. Ridden it? Add yours.
About this trail
Railroad Bed East is a mapped name for about 1.1 miles of the former Montpelier and Wells River Railroad bed in Marshfield, Vermont, running southeast from Bemis Farm Road toward Groton State Forest. It is a fragment of the Cross Vermont Trail, which follows the railroad's general route between Montpelier and Wells River: from Bemis Farm Road to the Groton State Forest boundary the bed is a minimally maintained Class IV town road and part of that trail. Trains ran on the line from 1873 to 1956; the State of Vermont bought the railbed in 1957 and later sold or gave away much of it, and snowmobile clubs began keeping it as a winter trail in the late 1960s.
Sources checked Oct 13, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
75% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Plainfield, 8.1 km from the trail's middle, 126 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 25 29 38 52 66 75 80 78 70 56 42 31 Low °F 3 4 14 27 39 48 53 51 43 32 23 12 Precipitation, in 2.7 2.4 2.6 3.2 3.6 4.6 4.7 3.4 3.5 4.3 2.8 3.3 - Old maps
USGS topographic maps of the trail's middle go back to the 1939 Plainfield sheet (1:48,000); the 1953 Plainfield sheet (1:62,500) shows the area at mid-century. Browse all 9 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationCross Vermont Trail Association
Nearby trails
- Cross Vermont Trail within 0.2 mi · 18.9 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- The story of the Montpelier & Wells River Railroad — Cross Vermont Trail Association · organization · checked Oct 13, 2026 Supports: service 1873–1956, state purchase 1957, later sales, snowmobile use from the late 1960s, Bemis Farm Road to Groton State Forest boundary is a Class IV Marshfield town road and the Cross Vermont Trail, trail follows the railroad's general route
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.