States › Washington

Rhododendron Trail

Greenway in Washington

In Island County

Conditions now

Loading the weather near Coupeville…

Forecast by the National Weather Service for Coupeville · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.5 mi 2.5 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Northeast Birch Street mile 0.1 directions to trailhead 1

Plan your visit

Links checked Oct 18, 2026. Sources: National Park Service boundaries.

Ebey Blockhouse WA NPS (opens in a new tab)
Ebey Blockhouse WA NPS · Photo: National Park Service · Public domain · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Rhododendron Trail is a paved, non-motorized path on the west side of State Route 20 at Coupeville on Whidbey Island, in Island County, Washington. It is one of the completed pieces of the county's long-range Whidbey Isle Trail, the "bridge-to-boat" plan for a paved path from Deception Pass to the Clinton ferry terminal, and at Coupeville it connects with the Kettles Trail, which runs along the highway from the southern entrance of Fort Ebey State Park to South Main Street.

In 2013 the trail ran from the South Main Street intersection south to Jacobs Road, and the county funded a $237,500 extension of about a quarter mile to the Rhododendron Park campground entrance, emerging at the park's ball fields. Later phases brought the trail to Rhododendron Park Road. On September 17, 2024, the Island County commissioners approved a $3.725 million project for a further 1.5-mile, 10-foot-wide paved section from Rhododendron Park Road to Patmore Road south of Coupeville, with construction expected to begin in 2027.

The path is 10 feet wide and open to pedestrians and bicyclists; motorized vehicles are not permitted. The mapped line covers about 1.5 miles, which OpenStreetMap shows as an asphalt path designated for bicycles and pedestrians.

Sources checked Oct 17, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

17% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Coupeville 1 S, 1.6 km from the trail's middle, 41 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F444751566265707066564944
Low °F373638424750535349444036
Precipitation, in2.51.921.91.71.30.80.71.22.13.12.6
Snow, in000.300000000.61.6
Old maps

USGS topographic maps of the trail's middle go back to the 1939 Coupeville sheet (1:62,500); the 1953 Coupeville sheet (1:24,000) shows the area at mid-century. Browse all 5 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Central Whidbey trail to grow — Whidbey News-Times · press · checked Oct 17, 2026
    Supports: west side of Highway 20 through Coupeville, connection to the Kettles Trail, phases to Jacobs Road and Rhododendron Park Road, September 17, 2024 approval of the $3.725 million extension to Patmore Road, 1.5 miles and 10 feet wide, construction expected 2027
  3. Whidbey's Rhododendron Trail extension is funded — South Whidbey Record · web · checked Oct 17, 2026
    Supports: Whidbey Isle Trail bridge-to-boat plan, Kettles Trail extent, Rhododendron Trail from South Main Street to Jacobs Road, $237,500 quarter-mile extension to the park campground and ball fields, 10-foot paved multimodal path, no motor vehicles
  4. OpenStreetMap way 785644221 (Rhododendron Trail) · web · checked Oct 17, 2026
    Supports: asphalt path, bicycle and foot designated

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.