States › Ohio

Richland B&O Trail

Rail-trail in Ohio · OpenStreetMap relation

Runs through Mansfield, Lexington, Bellville and Butler · Richland County

Conditions now

Loading the weather near Bellville…

Forecast by the National Weather Service for Bellville · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
18.5 mi 29.8 km1
On former railbed
17.6 mi 95%
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at West Elm Street mile 0 directions to trailhead 1
  2. Parking at State Route 97 mile 7.3 directions to trailhead 2
  3. Parking at State Route 97 mile 7.3 directions to trailhead 3
  4. Parking at State Route 97 mile 7.8 directions to trailhead 4
  5. Parking at East Main Street mile 11.2 directions to trailhead 5
  6. Parking at Marion Avenue mile 15.2 directions to trailhead 6
  7. Parking at Marion Avenue mile 15.2 directions to trailhead 7
  8. Parking at Marion Avenue mile 15.2 directions to trailhead 8
  9. Parking at South Home Road mile 15.3 directions to trailhead 9
  10. Parking at Millsboro Road mile 16.3 directions to trailhead 10
  11. Parking at Park Avenue West mile 17.3 directions to trailhead 11
  12. Parking at Park Avenue West mile 17.3 directions to trailhead 12
  13. Parking mile 17.7 directions to trailhead 13
  14. Parking at Hope Road mile 18.5 directions to trailhead 14
B&O Railway Bridge @ Bellville, OH - panoramio (opens in a new tab)
B&O Railway Bridge @ Bellville, OH - panoramio · Photo: Aaron Zhu · CC BY-SA 3.0 · Wikimedia Commons

About this trail

The Richland B&O Trail is a paved rail-trail of about 18.4 miles in Richland County, Ohio, between Butler and Mansfield, connecting four of the county's communities. The Richland County Park District operates it. It follows the former Baltimore & Ohio Railroad line through the county, on which every town had a station; passenger and freight service through Lexington ended with the last train in 1987, and the tracks beside the Lexington depot became the trail. Former park district director Steve McKee described the trail as nearly a decade in the making, and it marked its 30th anniversary in 2025.

Mile markers run from Hitchman Park in Butler (mile 0) north through Bellville and Lexington to North Lake Park in Mansfield (mile 18.4), passing Kingwood Center Gardens near the Mansfield end. Parking areas include Hitchman Park and the Whiffletree in Butler; the Hines Avenue bridge and the Bike Depot in Bellville; a lot off State Route 97 near mile 8; the Senior Center and Community Park in Lexington; and Deer Park, Millsboro Road, Kingwood Center Gardens and North Lake Park in Mansfield. Lexington's depot, built around 1913 and the only original B&O station left standing in the county, now houses the Lexington Senior Civic Center. A 1.1-mile, 10-foot-wide connector built by the City of Mansfield, nearing completion in September 2025, links the trail to Trimble Road through a tunnel under that road.

The trail is open year-round from dawn to dusk and is handicapped accessible. Motorized vehicles, buggies and horses are prohibited, dogs must be leashed, and only Class 1 and Class 2 e-bikes are permitted; there are no charging stations along the trail.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

32% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Mansfield 5 W, 14.5 km from the trail's middle, 61 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F343848627280838276635039
Low °F171928384958616053423223
Precipitation, in3.22.43.43.94.74.343.53.43.53.23.1
Old maps

USGS topographic maps of the trail's middle go back to the 1915 Shauck sheet (1:62,500); the 1961 Mansfield South sheet (1:24,000) shows the area at mid-century. Browse all 8 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 9718680, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. B&O Bike Trail — Richland County Park District · web · checked Oct 14, 2026
    Supports: paved trail along a former railway between North Lake Park in Mansfield and Butler, connects four communities, parking locations, open every day dawn to dusk year-round, rules on motorized vehicles, buggies, horses and leashed dogs
  3. Richland B & O Trail — Destination Mansfield · web · checked Oct 14, 2026
    Supports: 18.4 miles, paved, former Baltimore & Ohio railway, mile markers from Hitchman Park (mile 0) to North Lake Park (mile 18.4), Kingwood Center Gardens, parking at mile points including SR 97 near mile 8, 1.1-mile 10-foot connector to Trimble Road through a tunnel, handicapped accessible, Class 1 and 2 e-bikes only, no charging stations
  4. 60 and 30: Richland County Park District celebrates dual anniversaries — Richland Source (2025-09-27) · web · checked Oct 14, 2026
    Supports: 30th anniversary in 2025, nearly a decade in the making per former director Steve McKee, four communities, Mansfield building the 1.1-mile path to Trimble Road nearing completion
  5. Then & Now: The B&O depot(s) in Lexington — Richland Source (2018, updated 2023) · web · checked Oct 14, 2026
    Supports: B&O ran through Richland County with a station in every town, Lexington depot built around 1913 and the only original one left standing, last train in 1987, depot became the Lexington Senior Civic Center, adjacent tracks became the trail

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.