States › Tennessee

Richland Creek Greenway

Greenway in Tennessee

Runs through Nashville · Davidson County

Conditions now

Loading the weather near Nashville-Davidson metropolitan government (balance)…

Forecast by the National Weather Service for Nashville-Davidson metropolitan government (balance) · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
3.5 mi 5.7 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at 46th Avenue North mile 0 directions to trailhead 1
  2. Parking at Richland Creek Greenway mile 0.9 directions to trailhead 2
  3. Parking at Wyoming Avenue mile 2.3 directions to trailhead 3
Richland Creek greenway - panoramio.jpg (opens in a new tab)
Richland Creek greenway - panoramio.jpg · Photo: Paula Tejo · CC BY 3.0 · Wikimedia Commons

About this trail

The Richland Creek Greenway is a paved multi-use trail in Nashville, Tennessee, that loops around McCabe Park and connects the Sylvan Park and Cherokee Park neighborhoods with the shopping centers, entertainment areas and schools along White Bridge Pike. In July 2003 the Metropolitan Council of Nashville and Davidson County adopted a resolution recognizing the groups that helped propose and develop it, among them the Ingram Foundation, the St. Thomas Foundation, Greenways of Nashville, several neighborhood associations, CSX Corporation and Nashville Tech Community College. The resolution described a two-mile greenway whose first trail segment was to be built in the fall of 2003.

The trail makes nearly a complete loop around McCabe Park, and three access spurs lead from the loop into the surrounding neighborhoods and to White Bridge Pike. A 0.65-mile section runs beside the railroad tracks between White Bridge Pike and Cherokee Road. TrailLink lists endpoints at 201 54th Avenue North and 230 Kenner Avenue North, where there is parking, with further parking at 5100 Wyoming Avenue, 4617 Sloan Road and 26 White Bridge Road.

The surface is asphalt. TrailLink gives the length as 4.01 miles; the mapped trail is about 3.4 miles.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

36% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: March to April and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Nashville Berry Field, 15.6 km from the trail's middle, 39 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F485462728088919085746152
Low °F293138475766706862493832
Precipitation, in4.14.44.44.75.14.34.43.73.93.33.84.6
Snow, in1.410.300000000.10.4
Old maps

USGS topographic maps of the trail's middle go back to the 1903 Greenbrier sheet (1:125,000); the 1952 Nashville West sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Resolution No. RS2003-1510 — Metropolitan Council of Nashville and Davidson County · government source · checked Oct 15, 2026
    Supports: groups recognized for proposing and developing the greenway; connects Sylvan Park and Cherokee Park with shopping, entertainment and schools along White Bridge Road; two-mile greenway; first segment to be built in fall 2003; adopted July 2003
  3. Richland Creek Greenway — TrailLink · web · checked Oct 15, 2026
    Supports: nearly complete loop around McCabe Park; three access spurs; 0.65 miles along the railroad tracks between White Bridge Pike and Cherokee Road; endpoints and parking addresses; asphalt; 4.01 miles
  4. OpenStreetMap ways for Richland Creek Greenway — OpenStreetMap contributors · web · checked Oct 15, 2026
    Supports: mapped length about 3.4 miles

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.