States › Ohio

Riverside Trail

Greenway in Ohio

Runs through Toledo · Lucas County

Conditions now

Loading the weather near Toledo…

Forecast by the National Weather Service for Toledo · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
2.2 mi 3.5 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Ohio Street mile 0 directions to trailhead 1
  2. Parking at North Summit Street mile 0.1 directions to trailhead 2
  3. Parking at North Superior Street mile 0.6 directions to trailhead 3
  4. Parking at Bush Street mile 1.1 directions to trailhead 4
  5. Parking at Bush Street mile 1.1 directions to trailhead 5
  6. Parking at North Superior Street mile 1.2 directions to trailhead 6
  7. Parking at Bush Street mile 1.2 directions to trailhead 7
  8. Parking at Ostrich Lane mile 1.3 directions to trailhead 8
  9. Parking at Ostrich Lane mile 1.3 directions to trailhead 9
  10. Parking at Ostrich Lane mile 1.4 directions to trailhead 10
  11. Parking at Water Street mile 2.3 directions to trailhead 11
  12. Parking at Water Street mile 2.5 directions to trailhead 12

Plan your visit

Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).

Monroe Street Bridge: view north, south elevation (opens in a new tab)
Monroe Street Bridge: view north, south elevation · Photo: HAER OH-105, Robert Benton · No known restrictions · Library of Congress, Prints & Photographs Division

About this trail

The Riverside Trail is a paved multi-use path along the west bank of the Maumee River in downtown Toledo, Ohio. In 2015 a planning administrator in the city's Division of Engineering Services described the Riverside Trail as a proposed route from Maumee to Cullen Park in Point Place, generally paralleling the river, and one of 13 proposed or completed bike trails in the 2015 Toledo Bike Plan. The plan routed it along Emerald Avenue into Middlegrounds Metropark, and the city intended to build the next piece from Middlegrounds to Promenade Park in 2016.

As mapped, the trail runs about 2.2 miles from Middlegrounds Metropark, a 28-acre Metroparks Toledo park at the base of the Anthony Wayne Bridge with a 1.5-mile walk and bike path and a bike-share hub, north past Promenade Park and along Water Street and North Summit Street through the Vistula neighborhood to Jamie Farr (Riverside) Park. Middlegrounds is open from 7 a.m. until dark.

The downtown riverfront is part of the Glass City Riverwalk, a Metroparks Toledo project between the Anthony Wayne Bridge and the Craig Street (I-280) Bridge on both sides of the river. In 2020 the U.S. Department of Transportation awarded the Toledo Metropolitan Area Council of Governments about $23.7 million for it. Riverwalk plans for Vistula call for more than a mile of 12-foot shared-use path, and a City of Toledo reconstruction of Water Street designed to carry the Riverwalk was slated to begin in 2025. OpenStreetMap shows asphalt and concrete surfaces.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

9% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Toledo Metcalf Field, 11.3 km from the trail's middle, 5 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F343646607181858276645038
Low °F202229405161656355453426
Precipitation, in1.81.82.33.33.53.23.23.53.12.42.32.1
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1900 Toledo sheet (1:62,500); the 1952 Toledo sheet (1:24,000) shows the area at mid-century. Browse all 7 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Short path start of ambitious bike plan — The Blade (November 16, 2015) · web · checked Oct 14, 2026
    Supports: Riverside Trail name, proposed route from Maumee to Cullen Park in Point Place paralleling the river, one of 13 trails in the 2015 Toledo Bike Plan, Emerald Avenue into Middlegrounds Metropark, 2016 piece from Middlegrounds to Promenade Park
  3. Middlegrounds Metropark — Metroparks Toledo · web · checked Oct 14, 2026
    Supports: 28 acres, entrance at the base of the Anthony Wayne Bridge, 1.5-mile walk/bike path, bike-share hub, hours 7 a.m. until dark, part of the Glass City Riverwalk
  4. BUILD — Glass City Riverwalk (Metroparks Toledo) · web · checked Oct 14, 2026
    Supports: Glass City Riverwalk between the Anthony Wayne Bridge and the Craig Street Bridge (I-280) on both sides of the river, Metroparks Toledo project management, $23 million BUILD grant
  5. Vistula — Glass City Riverwalk (Metroparks Toledo) · web · checked Oct 14, 2026
    Supports: more than 1 mile of 12-foot shared-use path planned in Vistula, Water Street reconstruction by the City of Toledo incorporating the Riverwalk, slated to begin in 2025
  6. Toledo awarded $23M federal grant to develop multi-use riverside trail downtown — NBC 24 (September 10, 2020) · web · checked Oct 14, 2026
    Supports: 2020 USDOT BUILD grant of $23,668,160 to TMACOG for the Glass City Riverwalk with Metroparks Toledo
  7. Riverside Trail — OpenStreetMap ways (e.g. way 713672600) · web · checked Oct 14, 2026
    Supports: mapped route from Middlegrounds Metropark past Promenade Park along Water Street and North Summit Street to Jamie Farr (Riverside) Park, about 2.2 miles, asphalt and concrete surfaces

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.