States › Virginia

Riverwalk Trail

Greenway in Virginia · OpenStreetMap relation

Runs through Danville and West Point · King William County

Conditions now

Loading the weather near Danville…

Forecast by the National Weather Service for Danville · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
10.8 mi 17.4 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Park Circle mile 0 · restrooms directions to trailhead 1
  2. Parking at Park Avenue mile 0.3 directions to trailhead 2
  3. Parking at Memorial Drive mile 0.4 directions to trailhead 3
  4. Parking at Neal Court mile 2.3 directions to trailhead 4
  5. Parking at Neal Court mile 2.3 directions to trailhead 5
  6. Parking at Neal Court mile 2.3 directions to trailhead 6
  7. Parking at Neal Court mile 2.3 directions to trailhead 7
  8. Parking at North Main Street mile 3.7 · restrooms directions to trailhead 8
  9. Parking at Patton Street mile 3.7 · restrooms directions to trailhead 9
  10. Parking at Newton Street mile 3.9 directions to trailhead 10
  11. Parking at Bridge Street mile 3.9 directions to trailhead 11
  12. Parking at Colquhoun Street mile 4 directions to trailhead 12
  13. Parking at Colquhoun Street mile 4 directions to trailhead 13
  14. Parking at Colquhoun Street mile 4 directions to trailhead 14
  15. Parking at Colquhoun Street mile 4 directions to trailhead 15
  16. Parking at Bridge Street mile 4 directions to trailhead 16
  17. Parking at Bridge Street mile 4 directions to trailhead 17
  18. Parking at Bridge Street mile 4 directions to trailhead 18
  19. Parking at Craghead Street mile 4.1 directions to trailhead 19
  20. Parking at River Park Drive mile 5.1 directions to trailhead 20
  21. Parking at River Park Drive mile 5.1 directions to trailhead 21
  22. Parking at River Park Drive mile 5.2 directions to trailhead 22
  23. Parking at River Park Drive mile 5.2 directions to trailhead 23
  24. <different> Boat Ramp mile 7 · restrooms directions to <different> Boat Ramp
  25. Parking mile 7 · restrooms directions to trailhead 25
  26. Parking at 13th Street directions to trailhead 26
  27. Parking at 14th Street directions to trailhead 27
  28. Parking at Chelsea Road directions to trailhead 28
  29. Parking at 14th Street directions to trailhead 29
  30. Parking at F Street directions to trailhead 30
  31. Parking at 14th Street directions to trailhead 31
  32. Parking at F Street directions to trailhead 32
  33. Parking at F Street directions to trailhead 33
  34. Parking at F Street directions to trailhead 34

Plan your visit

Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).

Danville Riverwalk Trail.jpg (opens in a new tab)
Danville Riverwalk Trail.jpg · Photo: Mx. Granger · CC0 · Wikimedia Commons

About this trail

The Riverwalk Trail is a walking and biking trail along the Dan River in Danville, Virginia, run by Danville Parks and Recreation. In May 2025 it was 10 miles long, from Anglers Park to Ballou Park; older descriptions give over 9 miles. It passes parks, historic sites and businesses, linking Dan Daniel Memorial Park, Anglers Park, the Carrington Pavilion, the Danville Science Center and historic downtown Danville, and the city's parks director has called it one of the most used recreational amenities in the area.

Trailheads with parking are at the Crossing at the Dan on Craghead Street, Dan Daniel Memorial Park on River Park Drive, Anglers Park on Northside Drive and Main Street Plaza on Main Street. The trail is used for bike races, trail runs, charity walks, marathons and environmental education.

Danville Parks and Recreation is extending the trail with grant money. The first phase runs from the Main Street Plaza trailhead to the new Riverfront Park and was expected to be finished when the park opened in summer 2025; it is wider than the rest of the trail, to allow for events and food trucks. A later phase is to reach Dan River Falls and cross the river on the White Mill Pedestrian Bridge, a 966-foot bridge completed in 1921 that linked Dan River Inc.'s White Mill to yarn mills on the north bank. Lead and asbestos were removed from the bridge between November 2021 and summer 2022 in a rehabilitation of about $1 million, paid for by a $500,000 Virginia Brownfields Restoration and Economic Development Assistance Fund grant and $587,140 in New Market Tax Credit money, and the city then sought designs for its conversion. The extensions are expected to bring the trail to about 12 miles.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

37% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to May and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Danville Regional Airport, 1.7 km from the trail's middle, 3 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F495361717885898781716152
Low °F283037455463676659463630
Precipitation, in3.42.73.53.54.144.93.54.23.33.53.1
Snow, in2.52.51.5000000001.1
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1923 Danville sheet (1:48,000); the 1965 Ringgold sheet (1:24,000) shows the area at mid-century. Browse all 8 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

What riders say on Reddit

1 Reddit thread about this trail, May 2025

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 9735538, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Danville Riverwalk Trail to extend through Riverfront Park and White Mill Bridge — WDBJ7 (May 19, 2025) · web · checked Oct 14, 2026
    Supports: 10 miles from Anglers Park to Ballou Park; Danville Parks and Recreation, director Bill Sgrinia, 'one of the most used recreational amenities'; grant-funded extension from Main Street Plaza Trailhead to Riverfront Park, wider for events and food trucks, expected with the park's opening in summer 2025; next phase to Dan River Falls and the White Mill Pedestrian Bridge; about 12 miles when complete
  3. Danville Riverwalk Trail — The Crooked Road · web · checked Oct 14, 2026
    Supports: over 9 miles along the Dan River; parks, historic sites and businesses; Dan Daniel Memorial Park, Anglers Park, Carrington Pavilion, Danville Science Center, downtown; trailheads at Crossing at the Dan (Craghead Street), Dan Daniel Memorial Park (River Park Drive), Anglers Park (Northside Drive), Main Street Plaza; bike races, trail runs, charity walks, marathons, environmental education
  4. Bids sought for design of Danville's White Mill pedestrian bridge — Danville & Pittsylvania County Economic Development (Register & Bee, December 19, 2022) · web · checked Oct 14, 2026
    Supports: White Mill bridge completed 1921, 966 feet, linked the White Mill to yarn mills on the north bank; lead and asbestos removal November 2021 to summer 2022; about $1 million from a $500,000 Virginia Brownfields grant and $587,140 New Market Tax Credit money; request for design proposals

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.