Roby Trail
Greenway in Illinois
Runs through Champaign · Champaign County
Conditions now
Loading the weather near Champaign…
Forecast by the National Weather Service for Champaign · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.
Plan your visit
- National Recreation TrailDesignated in 1981 National Recreation Trails database
Links checked Oct 18, 2026. Sources: National Recreation Trails database (NPS and American Trails).
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Roby Trail is a 1.43-mile trail of the Champaign Park District in southwest Champaign, Illinois. The district obtained the 10-acre corridor in 1979, partly by purchase and partly by gift, with the Phinney Drainage District among the donors, and developed it with Illinois Department of Natural Resources Land and Water Conservation Fund grants of $32,812 in 1978 (which also covered Bian Park) and $70,655 in 1980. It was certified as a National Recreation Trail, the Roby Recreation Trail, on November 18, 1981; that listing allows bicycling, walking and leashed dogs.
The trail begins in Robeson Park, at 2019 South Duncan Road, and runs northeast through subdivisions to Mattis Avenue just south of Kirby Avenue; going on past its end leads onto the Simon Trail. OpenStreetMap maps it mostly as concrete, with several bridges, two of them timber decked.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
31% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to June and August to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Champaign 3s, 4.1 km from the trail's middle, 2 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 34 38 50 63 74 83 85 84 79 66 51 38 Low °F 18 21 31 42 53 62 65 64 56 44 32 24 Precipitation, in 2.3 2.2 2.8 3.9 4.8 4.6 4.5 3.5 3.4 3.4 3.2 2.4 Snow, in 6.5 5.8 2.5 0.3 0 0 0 0 0 0 0.9 4.8 - Old maps
USGS topographic maps of the trail's middle go back to the 1907 Mahomet sheet (1:62,500); the 1957 Bondville sheet (1:24,000) shows the area at mid-century. Browse all 11 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Agency noticesRoby Trail — Champaign Park District
Nearby trails
- Carle at the Fields Trail 0.9 mi away · 2.5 mi, paved
- Greenbelt Bikeway 1.3 mi away · 1.7 mi, paved
- Boneyard Greenway 2.2 mi away · 1.2 mi, paved
- Prairie Path 3.7 mi away · 1.8 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Roby Trail — Champaign Park District · organization · checked Oct 17, 2026 Supports: 1.43 miles; begins in Robeson Park, 2019 S Duncan Rd; runs northeast through subdivisions to Mattis Ave just south of Kirby Ave; obtained 1979; 10.022 acres; partial purchase and gifts incl. Phinney Drainage District; 1978 LWCF grant $32,812 incl. Bian Park; 1980 LWCF grant $70,655
- Roby Recreation Trail — National Recreation Trails · organization · checked Oct 17, 2026 Supports: certified National Recreation Trail Nov 18, 1981; allowed uses bicycling, walking, leashed dogs; continues onto the Simon Trail; managed by the Champaign Park District
- Roby Trail — OpenStreetMap contributors · web · checked Oct 17, 2026 Supports: mostly concrete surface; bridges, two with wood decks (ways 1017993840, 1017993842)
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.