Rock Island Trail
Rail-trail in Illinois · OpenStreetMap relation
Runs through Toulon, Wyoming, Princeville, Dunlap, Peoria Heights and Peoria · Stark and Peoria counties
Conditions now
Loading the weather…
Forecast by the National Weather Service · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
The Rock Island Trail State Park is a 26-mile (42 km) long public rail trail in the west-central region of the U.S. state of Illinois. It was designated a National Recreation Trail in 2003.
From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.
- Length
- 34.1 mi 54.8 km1
- On former railbed
- 29.1 mi 86%
- Opened
- 19893
- Surface
- Paved1
- Last checked
- Oct 31, 2026
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Rock Island State Trail Toulon Access mile 0.6 directions to Rock Island State Trail Toulon Access
- Parking at Wittmeyer Road mile 4.3 directions to trailhead 2
- Rock Island State Trail Park School Road Access mile 20 directions to Rock Island State Trail Park School Road Access
- Parking at North 2nd Street mile 20.6 · restrooms · water directions to trailhead 4
- Parking at South 1st Street mile 21.2 directions to trailhead 5
- Parking at West Pioneer Parkway mile 27.5 directions to trailhead 6
- Parking at West Pioneer Parkway mile 27.6 directions to trailhead 7
- Parking at West Candletree Drive mile 27.8 directions to trailhead 8
- Parking at West Candletree Drive mile 27.9 directions to trailhead 9
- Parking at West Candletree Drive mile 27.9 directions to trailhead 10
- Parking at North Sheridan Road mile 29 directions to trailhead 11
- Parking at North Knoxville Avenue mile 29.4 directions to trailhead 12
- Parking at North Knoxville Avenue mile 29.6 directions to trailhead 13
- Parking at North Humboldt Avenue mile 29.9 directions to trailhead 14
- Parking at East Glen Avenue mile 30.9 directions to trailhead 15
- Parking at East Marietta Avenue mile 31.3 directions to trailhead 16
- Parking at East Kelly Avenue mile 31.3 directions to trailhead 17
- Parking at East Ruppman Plaza mile 33 directions to trailhead 18
- Parking at North Harvard Avenue mile 33 directions to trailhead 19
- Parking at East Ruppman Plaza mile 33.1 directions to trailhead 20
- Parking at East Princeton Street mile 33.1 directions to trailhead 21
- Parking at East Princeton Street mile 33.1 directions to trailhead 22
- WCTC Parking Lot mile 34.7 directions to WCTC Parking Lot
- Parking at Northeast Adams Street mile 35.1 directions to trailhead 24
- Parking mile 35.2 directions to trailhead 25
- Parking at Northeast Adams Street mile 35.3 directions to trailhead 26
- Parking at Northeast Water Street mile 36.4 directions to trailhead 27
- Parking at Northeast Water Street mile 36.5 directions to trailhead 28
- Parking at Northeast Water Street mile 36.7 directions to trailhead 29
- Parking at Northeast Water Street mile 36.7 directions to trailhead 30
- River Station Lot mile 36.9 directions to River Station Lot
- Liberty Lot mile 37 directions to Liberty Lot
- Parking for FamilyCore employees and counselees mile 37 directions to Parking for FamilyCore employees and counselees
- Parking at Southwest Water Street mile 37 directions to trailhead 34
- Parking at Southwest Water Street mile 37 directions to trailhead 35
- Parking at Harrison Street mile 37.1 directions to trailhead 36
- Parking at Bob Michel Bridge mile 37.1 directions to trailhead 37
- Parking at Southwest Water Street mile 37.1 directions to trailhead 38
- Parking at Southwest Water Street mile 37.1 directions to trailhead 39
Plan your visit
- National Recreation TrailDesignated in 2003 National Recreation Trails database
Links checked Oct 18, 2026. Sources: National Recreation Trails database (NPS and American Trails).
(opens in a new tab) About this trail
The Rock Island Trail is a rail-trail in Peoria and Stark counties, Illinois. Its main part, Rock Island Trail State Park, is a 26-mile corridor managed by the Illinois Department of Natural Resources between Alta in Peoria County and Toulon in Stark County, designated a National Recreation Trail in 2003. It takes its name from the Chicago, Rock Island and Pacific Railroad; the right-of-way was built from 1869 to 1871 as the Peoria and Rock Island Railroad, linking the Quad Cities with Peoria. The line carried grain to Peoria distilleries until Prohibition cut that traffic, and the last train ran in 1963. The right-of-way was acquired for public use in 1965 and deeded to the state in 1969; the trail opened in 1989 and was dedicated in May 1990.
From Alta, mile 0, the state trail runs northwest through Dunlap, Princeville and Wyoming to Toulon, in a tree-lined corridor 50 to 100 feet wide. Along the way are an arched culvert north of Alta, a bridge over Kickapoo Creek, a tallgrass prairie remnant at the Peoria–Stark county line, and a trestle over the Spoon River between Wyoming and Toulon. The park office is in the former Chicago, Burlington and Quincy depot in Wyoming, at mile 20. A pedestrian tunnel under Illinois Route 6 carries the trail south toward Pioneer Parkway in north Peoria.
The mapped route here, about 36 miles, also includes the Rock Island Greenway, built on the Kellar Branch, the ten-mile end of the same line from Pioneer Industrial Park to downtown Peoria. The City of Peoria and the Village of Peoria Heights bought the branch in 1984, but a railroad kept using it until the Surface Transportation Board allowed conversion to a trail in 2010. The greenway opened in 2014, when the Peoria Park District dedicated an $8.1 million trail bridge over Knoxville Avenue near Junction City.
Sources checked Oct 14, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
25% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April, June and August to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Princeville, 7.9 km from the trail's middle, 6 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 32 37 50 64 74 83 86 84 78 65 51 37 Low °F 14 18 28 38 51 60 63 61 52 41 30 20 Precipitation, in 2.2 1.9 2.4 3.7 5 4 4.5 3.7 3.9 3.1 2.4 2 Snow, in 5.4 5.5 2 0.1 0 0 0 0 0 0 0.9 6.4 - On the National Register
- Chicago, Burlington & Quincy Railroad Depot, Wyoming · building, listed 1987 · nomination file for Chicago, Burlington & Quincy Railroad Depot
- Rock Island Depot and Freight House, Peoria · building, listed 1978 · nomination file for Rock Island Depot and Freight House
- Springdale Cemetery, Peoria · historic district, listed 2004 · nomination file for Springdale Cemetery
- Illinois Waterway Project Office, Peoria · historic district, listed 2004 · nomination file for Illinois Waterway Project Office
- Grand View Drive, Peoria · historic district, listed 1996 · nomination file for Grand View Drive
- Downtown Peoria Historic District, Peoria · historic district, listed 2018
- Peoria Warehouse Historic District, Peoria · historic district, listed 2014
- Old maps
USGS topographic maps of the trail's middle go back to the 1893 Dunlap sheet (1:62,500); the 1958 Peoria sheet (1:250,000) shows the area at mid-century. Browse all 13 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Historic Railway
The line in its working days, from copies of old photographs, oldest first.
Photo 1 of 2
Community
What riders say on Reddit
2 Reddit threads about this trail, Jun 2025 to Sep 2025
- Any good local places to camp? r/PeoriaIL · Jun 2025 · 34 comments
- Covered Bridges of Princeton, Illinois r/illinois · Sep 2025 · 16 comments
What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.
Where people who ride and look after this trail post: notices, conditions, work days.
- Agency noticesRock Island Trail State Park — Illinois DNR
- RedditSearch Reddit: r/illinois
Nearby trails
- River Trail of Illinois 0.4 mi away · 6.3 mi, paved
- Prairie Path 0.8 mi away · 1.8 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 6841506, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- “Rock Island Trail State Park (Illinois)”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
- Wikidata Q7354526, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
- Rock Island Trail State Park — Illinois Department of Natural Resources · government source · checked Oct 14, 2026 Supports: 26 miles Alta (Peoria County) to Toulon (Stark County); mile 0 at Alta Road lot; corridor 50 to 100 feet wide; Dunlap, Princeville, Wyoming; arched culvert north of Alta; prairie remnant at county line; Spoon River trestle; CB&Q depot in Wyoming; park office at mile 20
- Rock Island Trail State Park (Illinois) — Wikipedia · organization · checked Oct 14, 2026 Supports: National Recreation Trail 2003; Peoria and Rock Island Railroad 1869–1871; Chicago, Rock Island and Pacific; grain to distilleries until Prohibition; last train 1963; acquired 1965, deeded 1969; opened 1989, dedicated May 1990; IDNR; Kickapoo Creek bridge; tunnel under Route 6; southern end at Pioneer Parkway
- Evolution of a Trail — Peoria Magazine (May 2021) · web · checked Oct 14, 2026 Supports: Kellar Branch, ten miles from downtown Peoria to Pioneer Industrial Park; 1984 purchase by Peoria and Peoria Heights; continued rail use; 2010 STB approval of trail conversion; 2014 Knoxville Avenue bridge ($8.1 million) dedicated by the Peoria Park District and opening of the Rock Island Greenway
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.

