States › Michigan

Rogers City Spur Trail

Rail-trail in Michigan

Runs through Pulawski Township and Posen Township · Presque Isle County

Conditions now

Loading the weather near Posen…

Forecast by the National Weather Service for Posen · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
5.5 mi 8.9 km1
Surface
Dirt1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at East Metz Highway mile 1.5 directions to trailhead 1
  2. Parking at East Metz Highway mile 1.5 directions to trailhead 2
Posen Township, along the trail (opens in a new tab)
Posen Township, along the trail · Photo: Elevatorrailfan · CC BY-SA 4.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Rogers City Trail, which the Michigan Department of Natural Resources (DNR) lists as the Rogers City Spur Trail, is a natural-surface rail-trail in Presque Isle County, Michigan, owned and administered by the DNR's Parks and Recreation Division. It follows the Rogers City Branch, a 13.6-mile line that the Detroit and Mackinac Railway opened on June 18, 1911, from its main line near Posen north to Rogers City on Lake Huron. A major source of the branch's traffic was the limestone quarry at Calcite, east of Rogers City. The Lake State Railway, which acquired the Detroit and Mackinac in 1992, abandoned the branch in 2000.

The DNR's trail data shows the spur in two segments on the railroad grade, about 13 miles in all. The section mapped here runs about 5.5 miles through forest from a junction with the North Eastern State Trail north to U.S. 23 near the Swan River. Presque Isle County's 2023–2027 recreation plan described converting the right-of-way into a rail-trail that links the North Eastern State Trail with the Huron Sunrise Trail at Rogers City.

The DNR records the surface as unimproved dirt, at least 12 feet wide, and not ADA accessible. Hiking, biking and mountain biking, cross-country skiing and snowshoeing are permitted; horses and off-road vehicles are not, and the corridor carries snowmobile trail LP 998. TrailLink lists no designated parking along the route.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

24% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Rogers City, 13.8 km from the trail's middle, 48 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F283038506474807971574434
Low °F141320304152585750393021
Precipitation, in2.21.51.62.62.93.43.13.433.32.32.3
Snow, in23.717.811.24.60.200000.46.720.2
Old maps

USGS topographic maps of the trail's middle go back to the 1954 Alpena sheet (1:250,000); the 1957 Alpena sheet (1:250,000) shows the area at mid-century. Browse all 6 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Statewide Railtrails (DNR Trails Open Data, layer 16) — Michigan Department of Natural Resources · government source · checked Oct 15, 2026
    Supports: name Rogers City Spur Trail; DNR Parks and Recreation ownership and administration; railroad grade; two segments of about 8.56 and 4.51 miles; unimproved dirt surface, 12 feet and over, not ADA accessible; hiking, biking/mountain biking, skiing and snowshoeing permissible; no equestrian or ORV; snowmobile trail LP 998
  3. Rogers City Branch — Wikipedia · organization · checked Oct 15, 2026
    Supports: 13.6-mile branch from the Detroit and Mackinac main line near Posen to Rogers City, opened June 18, 1911; Calcite limestone quarry traffic; Lake State Railway acquisition 1992 and abandonment 2000; plan (Presque Isle County Recreation Plan 2023–2027) to convert the right-of-way into a rail-trail linking the North Eastern State Trail and the Huron Sunrise Trail
  4. Rogers City Spur Trail — TrailLink · web · checked Oct 15, 2026
    Supports: about 5.5 miles from the North Eastern State Trail to US-23; forested rural route entirely on the rail corridor; no designated parking
  5. OpenStreetMap API map data near the trail's north end · web · checked Oct 15, 2026
    Supports: north end of the mapped section at US-23 near the Swan River

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.