States › Wisconsin

Root River Pathway

Greenway in Wisconsin

Runs through Racine · Racine County

Conditions now

Loading the weather near Racine…

Forecast by the National Weather Service for Racine · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
2.8 mi 4.5 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at North Horlick Drive mile 0.7 directions to trailhead 1
  2. Parking at Clayton Avenue mile 1.4 directions to trailhead 2
  3. Parking at Root River Pathway mile 1.9 directions to trailhead 3
  4. Parking mile 2.4 directions to trailhead 4
  5. Parking at Water Street mile 2.6 directions to trailhead 5
  6. Parking at Water Street mile 2.6 directions to trailhead 6
  7. Parking at Ontario Street mile 2.6 directions to trailhead 7
  8. Parking at Water Street mile 2.6 directions to trailhead 8
  9. Parking at Ontario Street mile 2.7 directions to trailhead 9
  10. Parking at Wisconsin Avenue mile 2.7 directions to trailhead 10
Racine October 2023 119 (Root River Pathway and Horlick Drive) (opens in a new tab)
Racine October 2023 119 (Root River Pathway and Horlick Drive) · Photo: Michael Barera · CC BY-SA 4.0 · Wikimedia Commons

About this trail

The Root River Pathway is a paved path in Racine, Wisconsin. The City of Racine says it extends 4 miles, east to west, from the Main Street Bridge to Colonial Park, with educational signposts that tell the story of the role of the river in the development of Racine, and that it connects to the Racine and Sturtevant trails and the MRK and North Shore trails. At the Main Street Bridge it meets the Lake Michigan Pathway, which the city gives as about 9.8 miles along the lakeshore. The mapped line covers about 2.8 miles (4.5 km). OpenStreetMap tags most of its ways as paved or asphalt cycleways designated for bicycles and pedestrians.

Sources checked Oct 31, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

17% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Racine, 3.2 km from the trail's middle, 1 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F303241516172787770594635
Low °F141827364656646356433221
Precipitation, in21.92.43.94.34.33.33.83.33.12.52.1
Snow, in13.310.95.510000001.98.4
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1892 Racine sheet (1:62,500); the 1958 Racine South sheet (1:24,000) shows the area at mid-century. Browse all 7 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Pathways — City of Racine · government source · checked Oct 31, 2026
    Supports: Root River Pathway extends 4 miles, east to west, from the Main Street Bridge to Colonial Park; educational signposts on the river's role in the development of Racine; connects to the Racine and Sturtevant trails and the MRK and North Shore trails; Lake Michigan Pathway extends approximately 9.8 miles along the lake shore and links to the Root River Pathway at the Main Street Bridge
  3. Root River Pathway — OpenStreetMap way 189887203 · web · checked Oct 31, 2026
    Supports: way named Root River Pathway tagged highway=cycleway, surface=paved, bicycle and foot designated; most other ways of the pathway are tagged paved or asphalt

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.