States › New York

Route 104 Trail

Greenway in New York

Runs through Town of Webster · Monroe County

Conditions now

Loading the weather near Irondequoit…

Forecast by the National Weather Service for Irondequoit · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.3 mi 2.1 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.

Route 104 Trail drawn on the 1984 USGS topographic map of Rochester, New York
Then: the 1984 USGS Rochester sheet (1:100,000) with today's trail line. Generated from USGS and OpenStreetMap data: map public domain, line © OpenStreetMap contributors. The sheet at USGS.

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Route 104 Trail is a paved path in New York mapped in OpenStreetMap as four pieces of asphalt cycleway designated for bicycles and pedestrians, about 1.3 miles in this record. The name follows NY Route 104.

A separate planning effort used the same corridor name. The Genesee Transportation Council's Route 104 Corridor Trail feasibility study, discussed by its Planning Committee on October 13, 2011, examined a 17.4-mile multi-use trail from Webster to Sodus, with one route parallel to the highway and one along the railroad. Rochester Gas and Electric owns the rail right-of-way in Monroe County, and the abandoned section west of the Xerox campus was slated to pass to the Town and Village of Webster. The sources do not say whether the mapped path is part of that proposal.

Sources checked Oct 18, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

28% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Rochester Gtr International Airport, 17.7 km from the trail's middle, 41 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F333544576978828074614938
Low °F192027374857626154433425
Precipitation, in2.52.12.532.93.43.63.33.23.22.82.7
Snow, in27.423.117.930.100000.18.122.3
Old maps

USGS topographic maps of the trail's middle go back to the 1895 Rochester sheet (1:62,500); the 1952 Rochester East sheet (1:24,000) shows the area at mid-century. Browse all 12 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Route 104 Corridor Trail (Webster to Sodus) Feasibility Study — Genesee Transportation Council · organization · checked Oct 18, 2026
    Supports: 17.4-mile Webster to Sodus proposal, two alternatives, RG&E ownership, Xerox campus section, October 13, 2011 committee meeting
  3. Route 104 Trail — OpenStreetMap way 354646279 · web · checked Oct 18, 2026
    Supports: name Route 104 Trail, asphalt cycleway, bicycle and foot designated (three further ways carry the same tags)

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.