Route 390 Trail
Greenway in New York
Runs through Greece · Monroe County
Conditions now
Loading the weather near Greece…
Forecast by the National Weather Service for Greece · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Maiden Lane mile 3.5 directions to trailhead 1
- Parking at Maiden Lane mile 3.5 directions to trailhead 2
- Parking mile 3.6 directions to trailhead 3
- Parking at Center Place Drive mile 4.3 directions to trailhead 4
- Parking mile 4.3 directions to trailhead 5
- Parking mile 4.3 directions to trailhead 6
- Parking mile 4.4 directions to trailhead 7
- Parking mile 4.4 directions to trailhead 8
- Parking mile 4.4 directions to trailhead 9
- Parking at Center Place Drive mile 4.5 directions to trailhead 10
- Parking at Center Place Drive mile 4.5 directions to trailhead 11
- Parking at Center Place Drive mile 4.5 directions to trailhead 12
- Parking at Center Place Drive mile 4.5 directions to trailhead 13
- Parking at West Ridge Road mile 4.6 directions to trailhead 14
- Parking at West Ridge Road mile 4.6 directions to trailhead 15
- Parking at Center Place Drive mile 4.6 directions to trailhead 16
- Parking at West Ridge Road mile 4.6 directions to trailhead 17
- Parking at West Ridge Road mile 4.6 directions to trailhead 18
- Parking at Hoover Drive mile 4.7 directions to trailhead 19
- Parking at Hoover Drive mile 4.7 directions to trailhead 20
- Parking at Hoover Drive mile 4.8 directions to trailhead 21
- Parking at Paddy Creek Circle mile 4.9 directions to trailhead 22
- Parking at Paddy Creek Circle mile 4.9 directions to trailhead 23
- Parking at Paddy Creek Circle mile 4.9 directions to trailhead 24
- Parking at Paddy Creek Circle mile 4.9 directions to trailhead 25
- Parking at West Ridge Road mile 4.9 directions to trailhead 26
- Parking at Paddy Creek Circle mile 4.9 directions to trailhead 27
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Route 390 Trail is a multi-use path of about 6 miles beside the NY 390 expressway in the Town of Greece, New York, running from the Lake Ontario State Parkway south to Ridgeway Avenue. The New York State Department of Transportation designed and built its southern extension. The trail does not follow a railroad or canal: the expressway beside it was built as part of the Rochester Outer Loop, extended north to Route 104 between the mid-1960s and early 1970s and to the Lake Ontario State Parkway in the early 1980s.
As first built, the trail ran from the Lake Ontario State Parkway down the I-390 corridor to Route 104. In September 2016 the Federal Highway Administration and NYSDOT awarded $2,057,770 to extend it south from Route 104, part of a $3,457,770 award that also funded the Eastman Trail's Ridgeway segment. The 1.2-mile extension from West Ridge Road to Ridgeway Avenue, a $1.6 million project, opened in December 2022, with new curb ramps where the trail crosses at Latona Road and Kodak Park.
At Ridgeway Avenue the trail meets the Eastman Trail, which the City of Rochester built between fall 2021 and summer 2022: an off-road path east from Latona Road, with on-road bike lanes continuing from Weiland Road to Mt. Read Boulevard. The city describes the Eastman Trail as the first phase of an east-west link to its Genesee Riverway Trail at Kings Landing, and as part of a northern loop using the Eastman Trail, the Route 390 Trail and the Lake Ontario State Parkway Trail. A further extension of the Route 390 Trail south toward the Erie Canalway Trail is planned.
Sources checked Oct 14, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
38% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Rochester Gtr International Airport, 12.4 km from the trail's middle, 49 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 33 35 44 57 69 78 82 80 74 61 49 38 Low °F 19 20 27 37 48 57 62 61 54 43 34 25 Precipitation, in 2.5 2.1 2.5 3 2.9 3.4 3.6 3.3 3.2 3.2 2.8 2.7 Snow, in 27.4 23.1 17.9 3 0.1 0 0 0 0 0.1 8.1 22.3 - On the National Register
- Koda-Vista Historic District, Greece · historic district, listed 2019
- Old maps
USGS topographic maps of the trail's middle go back to the 1895 Rochester sheet (1:62,500); the 1952 Rochester West sheet (1:24,000) shows the area at mid-century. Browse all 13 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- RedditSearch Reddit: r/newyork
Nearby trails
- Lake Ontario State Parkway Trail within 0.2 mi · 3.6 mi, paved
- Erie Canalway Trail 1.1 mi away · 147 mi, paved
- Genesee Riverway Trail 2.2 mi away · 17.8 mi, paved
- El Camino Trail 2.8 mi away · 2.1 mi, paved
- Irondequoit Lakeside Trail 3.0 mi away · 4.7 mi, paved
- Hilton Hojack Trail 4.3 mi away · 1.8 mi, surface unknown
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Eastman Trail - Phase I — City of Rochester · government source · checked Oct 14, 2026 Supports: NYSDOT designed and built the extension from Ridge Road (Route 104) to Ridgeway Avenue, Eastman Trail connection, Phase I limits and 2021-2022 construction, Genesee Riverway Trail link, northern loop, planned Route 390 Trail to the Erie Canalway Trail
- Press Release (September 21, 2016) — Senator Kirsten Gillibrand · government source · checked Oct 14, 2026 Supports: original route Lake Ontario State Parkway to Route 104, $2,057,770 for the southern extension, $3,457,770 total award, Eastman Trail Ridgeway segment, planned link to the Canalway Trail
- New York State Route 390 — Wikipedia · organization · checked Oct 14, 2026 Supports: route in Greece, Rochester Outer Loop, extension to Route 104 mid-1960s to early 1970s, to the Lake Ontario State Parkway in the early 1980s
- Route 390 Trail expansion complete — 13WHAM (December 6, 2022) · web · checked Oct 14, 2026 Supports: 1.2-mile extension West Ridge Road to Ridgeway Avenue, $1.6 million, about 6 miles total, northern terminus at the Lake Ontario State Parkway, Eastman Trail connection, curb ramps at Latona Road and Kodak Park
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.