Ruby Jack Trail
Rail-trail in Missouri · OpenStreetMap relation
Runs through Carl Junction and Oronogo · Jasper County
Conditions now
Loading the weather near Oronogo…
Forecast by the National Weather Service for Oronogo · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Ruby Jack Trail Old 66 Trailhead mile 0 directions to Ruby Jack Trail Old 66 Trailhead
- Ruby Jack Trailhead mile 0 directions to Ruby Jack Trailhead
- Ruby Jack Trail County Road 164 Trailhead mile 0.6 directions to Ruby Jack Trail County Road 164 Trailhead
- Ruby Jack Trail County Road 180 Trailhead mile 2.3 directions to Ruby Jack Trail County Road 180 Trailhead
- Ruby Jack Trail County Road 200 Trailhead mile 4.5 directions to Ruby Jack Trail County Road 200 Trailhead
- Trailhead at County Road 200 mile 4.5 directions to trailhead 6
- Ruby Jack Trail Grant Street Trailhead mile 7 directions to Ruby Jack Trail Grant Street Trailhead
- Ruby Jack Trail Country Road 270 Trailhead mile 11.7 directions to Ruby Jack Trail Country Road 270 Trailhead
- Ruby Jack Trail Main Street Trailhead (Carl Junction) mile 12.8 directions to Ruby Jack Trail Main Street Trailhead (Carl Junction)
- Parking at Wise Street mile 12.8 directions to trailhead 10
- Parking at Wise Street mile 12.8 directions to trailhead 11
- Parking at Brooks Street mile 13.3 directions to trailhead 12
- trailhead mile 15.9 directions to trailhead
(opens in a new tab) About this trail
The Ruby Jack Trail is a rail-trail of about 16 miles in Jasper County, Missouri, running west from Carthage through Oronogo and Carl Junction to the Kansas state line. It is managed by the Joplin Trails Coalition, a volunteer-driven nonprofit formed in 1991 that also manages the Frisco Greenway Trail through Joplin and Webb City. The trail follows the former Burlington Northern rail line, which became available for a trail under the federal rails-to-trails program after the railroad was abandoned.
In 2006 construction of a path linking a Carthage trailhead parking lot to the trail was about to begin. A $35,000 Missouri Department of Natural Resources grant announced in 2016 paid for surfacing about 1.5 miles from Route MM west toward Missouri Highway 43. In 2020 the coalition opened a 2.5-mile addition from just west of County Road 240 to Missouri Highway 171, passing under Highway 43, and held a ribbon cutting on October 10, 2020 at County Road 270 near Carl Junction. At that point the coalition described 14 miles of compacted limestone gravel connecting Carl Junction, Oronogo and Carthage; it gives the Kansas state line as the trail's western end.
Access points from west to east are Main Street in Carl Junction, County Road 270 at Ivy, Grant Street in Oronogo, County Road 200 near Alba, County Road 180, County Road 164 at Old 66 Boulevard, and the eastern trailhead at Old 66 and Oak Street in Carthage, across from Carthage Municipal Park. The Carthage trailhead has a new information kiosk, and volunteers hold workdays to clear limbs along the corridor. The coalition is also building a connector of a little over 3.5 miles through Webb City to join the Ruby Jack and the Frisco Greenway; its first finished piece, 0.8 mile through a reclaimed mining area, is the second of six phases.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
17% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: March to April and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Joplin Regional Airport, 6.2 km from the trail's middle, 11 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 45 50 60 69 77 86 90 90 82 71 58 48 Low °F 25 29 37 47 56 65 70 68 59 48 37 28 Precipitation, in 1.9 2 3.3 5 6.6 5.6 4 3.4 4.2 3.8 3.3 2.6 - Old maps
USGS topographic maps of the trail's middle go back to the 1886 Carthage sheet (1:125,000); the 1963 Webb City sheet (1:24,000) shows the area at mid-century. Browse all 10 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationJoplin Trails Coalition
- FacebookJoplin Trails Coalition (Facebook)
- RedditSearch Reddit: r/missouri
Nearby trails
- Thom Station Trail 0.3 mi away · 1.6 mi, surface unknown
- Frisco Greenway Trail 3.4 mi away · 4.2 mi, gravel
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 14228577, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- About Us — Joplin Trails Coalition · organization · checked Oct 15, 2026 Supports: coalition formed 1991; volunteer-driven nonprofit relying on donations and volunteers; manages the Frisco Greenway Trail (Joplin, Webb City) and the Ruby Jack Trail; Ruby Jack runs west from Carthage through Oronogo and Carl Junction to the Kansas state line; former railroad line
- Ruby Jack Trail access points — Joplin Trails Coalition · organization · checked Oct 15, 2026 Supports: access points west to east: Main St (Carl Junction), CR 270/Ivy, Grant St (Oronogo), CR 200 (Alba), CR 180, CR 164/Old 66 Blvd, Old 66/Oak St eastern trailhead across from Carthage Municipal Park
- Joplin Trails Coalition – Joplin Missouri's Regional Rail Trail Organization · organization · checked Oct 15, 2026 Supports: new kiosk at the Carthage trailhead; volunteer workday clearing limbs on the Ruby Jack Trail (2026)
- Work could begin this fall on next phase of Joplin's Ruby Jack Trail | joplinglobe.com — Missouri Bicycle and Pedestrian Federation · organization · checked Oct 15, 2026 Supports: 16-mile trail from Carthage through Oronogo and Carl Junction to the state line; former Burlington Northern rail line made available under the federal rails-to-trails program after abandonment; 1.5-mile phase from Route MM west toward Highway 43; $35,000 DNR grant with 20 percent local match
- Joplin's Ruby Jack Trail to expand thanks to grant | joplinglobe.com — Missouri Bicycle and Pedestrian Federation · organization · checked Oct 15, 2026 Supports: 2016 $35,000 Missouri DNR grant to surface an additional 1.5 miles
- Work begins on 16-mile Ruby Jack Trail near Joplin — Missouri Bicycle and Pedestrian Federation · organization · checked Oct 15, 2026 Supports: 2006: construction of the path from the Carthage trailhead parking lot about to begin (quoting the Carthage Press)
- Our view: Well done, Joplin Trails Coalition, on recent 2.5-mile addition to Ruby Jack Trail | joplinglobe.com — Missouri Bicycle and Pedestrian Federation · organization · checked Oct 15, 2026 Supports: 2020 2.5-mile addition from just west of County Road 240 to Missouri 171, passing under Missouri 43
- Joplin Trails Coalition celebrates completion of Ruby Jack Trail extension connecting Carl Junction, Oronogo, and Carthage — Missouri Bicycle and Pedestrian Federation · organization · checked Oct 15, 2026 Supports: October 10, 2020 ribbon cutting at County Road 270 near Carl Junction; 14-mile compacted limestone gravel trail connecting Carl Junction, Oronogo and Carthage
- Joplin Trails Coalition completes first Frisco-Ruby Jack connector — KSNF/KODE FourStatesHomepage.com · web · checked Oct 15, 2026 Supports: first connector section of 0.8 mile is phase two of six; full connector a little more than 3.5 miles; Webb City; reclaimed mining area
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.