Ruston Way Trail
Greenway in Washington
Runs through Tacoma · Pierce County
Conditions now
Loading the weather near Tacoma…
Forecast by the National Weather Service for Tacoma · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at McCarver Street mile 0 · restrooms · water directions to trailhead 1
- Parking at Ruston Way mile 0 · restrooms · water directions to trailhead 2
- Parking at North 30th Street mile 0 · restrooms · water directions to trailhead 3
- Parking at McCarver Street mile 0 · restrooms · water directions to trailhead 4
- Parking at Ruston Way mile 0.5 directions to trailhead 5
- Parking at Ruston Way mile 0.6 directions to trailhead 6
- Parking at Ruston Way mile 0.7 directions to trailhead 7
- Parking at Ruston Way mile 0.7 directions to trailhead 8
- Parking at Ruston Way mile 0.8 directions to trailhead 9
- Parking at Ruston Way mile 0.8 directions to trailhead 10
- Parking at Ruston Way mile 0.9 directions to trailhead 11
- Parking at Ruston Way mile 1 directions to trailhead 12
- Parking at Ruston Way mile 1.2 directions to trailhead 13
- Parking at Ruston Way mile 1.4 directions to trailhead 14
- Parking at Ruston Way mile 1.5 · water directions to trailhead 15
- Parking at Ruston Way mile 1.8 directions to trailhead 16
(opens in a new tab) About this trail
The Ruston Way Trail is a paved multi-use trail along the shoreline of Tacoma, Washington, beside Ruston Way. Wikipedia describes the waterfront as about two miles long, with the trail starting at Chinese Reconciliation Park in the south, where Schuster Parkway meets Ruston Way in Old Town, and running north to the 97-acre Point Ruston development and on toward the Tacoma Yacht Club. BNSF railroad tracks run along the shoreline parallel to the road.
The City of Tacoma owned the Old Town Dock before World War I and bought land from the Tacoma Boatbuilding Company in 1972, adding parcels in 1973 and 1976. The Dickman Lumber Mill closed in 1974 after about 80 years of operation, and Metro Parks acquired its site. The Chinese Reconciliation Park pagoda was completed in 2011.
OpenStreetMap shows trailheads on McCarver Street and along Ruston Way. The record is about 2.7 miles long, and sources differ on the trail's exact length.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
23% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Tacoma #1, 7 km from the trail's middle, 4 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 48 50 55 60 66 71 77 77 71 61 52 47 Low °F 37 37 40 44 49 53 57 57 53 47 40 37 Precipitation, in 6 4 4.4 3.4 2 1.4 0.6 0.8 1.6 4.1 6.5 6 - On the National Register
- North 23rd Street Bridge, Tacoma · structure, listed 1982 · nomination file for North 23rd Street Bridge
- FIREBOAT NO.1, Tacoma · structure, listed 1983 · nomination file for FIREBOAT NO.1
- Old maps
USGS topographic maps of the trail's middle go back to the 1897 Tacoma sheet (1:125,000); the 1949 Tacoma North sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Scott Pierson Trail 2.4 mi away · 6.4 mi, paved
- Cushman Trail 2.7 mi away · 5.6 mi, paved
- Water Flume Trail 4.3 mi away · 2.2 mi, paved
- Pipeline Trail 4.4 mi away · 5.5 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Ruston Way, Tacoma, Washington — Wikipedia · organization · checked Oct 17, 2026 Supports: shoreline length, endpoints, paved surface, railroad, land history, mill closure, pagoda
- OpenStreetMap — OpenStreetMap contributors · web · checked Oct 17, 2026 Supports: McCarver Street and Ruston Way trailheads
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.