Sacramento Northern Bike Trail
Rail-trail in California · OpenStreetMap relation
Runs through Elverta, Rio Linda and Sacramento · Sacramento County
Conditions now
Loading the weather near Sacramento…
Forecast by the National Weather Service for Sacramento · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Oak Lane mile 1.9 directions to trailhead 1
- Parking at Rio Linda Boulevard mile 4.3 directions to trailhead 2
- Parking at Traction Avenue mile 7.4 directions to trailhead 3
- Parking at Fairfield Street Rio Linda Avenue Alley mile 7.5 directions to trailhead 4
- Parking at El Camino Avenue Redwood Avenue Alley mile 7.6 directions to trailhead 5
- Parking at C Street mile 10 directions to trailhead 6
- Parking at Chinatown Alley mile 10 directions to trailhead 7
Plan your visit
- By trainAmtrak: Sacramento, CA (SAC) 1.2 mi from a trailhead · Amtrak’s bike information
Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).
(opens in a new tab) About this trail
The Sacramento Northern Bike Trail, which Sacramento County calls the Sacramento Northern Trail, is a paved multi-use rail-trail of about 10 miles linking downtown Sacramento, Del Paso Heights and Rio Linda. It follows the "North End" of the Sacramento Northern Railway, built as the Northern Electric Railway, a third-rail electric interurban that began full service between Sacramento and Chico on September 1, 1907 and was renamed the Sacramento Northern in 1914. In Sacramento the line ran on private right-of-way between 18th and 19th streets to D Street, and it crossed the American River on a Northern Electric-built truss bridge and ran north to Rio Linda and on toward Marysville. Interurban passenger service ended in 1941, after which the railway hauled freight.
The trail starts on C Street in downtown Sacramento and near its south end connects with the American River trail. Sacramento County describes the trail as running from the American River Parkway near Northgate Boulevard in the City of Sacramento, through unincorporated Sacramento County, to the Elverta Park and Ride lot just south of Elverta Road and Rio Linda Boulevard. This record, named after an OpenStreetMap route relation, maps the whole route from C Street to Elverta.
The trail ends about 1.5 miles short of the Placer County line, and that last stretch is a dirt trail. In June 2024 the county announced that its Department of Transportation would receive $564,864 from the Sacramento Area Council of Governments' Carbon Reduction Program for a feasibility study and outreach on a 1.5-mile Class I extension to the county line, paved in asphalt 12 feet wide with centerline striping. The county put the project cost at $640,000, with a local match of $73,408 from Measure A.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
4% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: October to May. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Sacramento 5 ESE, 10.4 km from the trail's middle, 1 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 56 62 68 74 81 89 94 94 89 79 65 56 Low °F 41 44 47 49 54 59 61 61 59 53 45 41 Precipitation, in 3.9 3.6 2.8 1.4 0.9 0.2 0 0 0.1 0.9 1.8 3.5 Snow, in 0 0 0 0 0 0 0 0 0 0 0 0 - Old maps
USGS topographic maps of the trail's middle go back to the 1891 Sacramento sheet (1:125,000); the 1951 Rio Linda sheet (1:24,000) shows the area at mid-century. Browse all 16 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
What riders say on Reddit
- Riders in February 2025 described reaching the trail at 19th Street near the almond factory, then crossing Pipe's Bridge to the American River trail; one suggested 21st northbound, then D and 19th. r/SacBike, Feb 2025
- Riders in February 2025 flagged wet ground: one said the approach from 19th Street can get boggy, another expected the junction with the American River trail to be under water after a storm. r/SacBike, Feb 2025
1 Reddit thread about this trail, Feb 2025
- Route advice r/SacBike · Feb 2025 · 7 comments
What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.
Where people who ride and look after this trail post: notices, conditions, work days.
Nearby trails
- American River Bike Trail within 0.2 mi · 36.5 mi, paved
- Walter S. Ueda Parkway Trail within 0.2 mi · 3.7 mi, paved
- Two Rivers Bike Trail 0.2 mi away · 1.8 mi, surface unknown
- Dry Creek Parkway Trail 0.5 mi away · 2.1 mi, paved
- Levee Path 0.8 mi away · 1.4 mi, paved
- Levee Path 0.8 mi away · 1.5 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 9710865, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Sacramento Northern Trail Extension — Sacramento County (June 27, 2024) · government source · checked Oct 15, 2026 Supports: name Sacramento Northern Trail, route from the American River Parkway near Northgate Blvd through unincorporated county to the Elverta Park and Ride south of Elverta Rd/Rio Linda Blvd, 1.5 miles short of the Placer County line, dirt gap, 1.5-mile 12-foot paved Class I extension with centerline striping, $564,864 SACOG Carbon Reduction Program, $640,000 cost, $73,408 Measure A match
- Sacramento Northern Railway — Wikipedia · organization · checked Oct 15, 2026 Supports: Northern Electric Railway third-rail line, full Sacramento-Chico service September 1, 1907, renamed Sacramento Northern in 1914, North End route over a Northern Electric truss bridge across the American River to Rio Linda and Marysville, right-of-way between 18th and 19th streets in Sacramento, end of interurban passenger service in 1941, freight afterward, rail-trail conversion in Sacramento County
- Sacramento Northern Bike Trail — Great Runs · web · checked Oct 15, 2026 Supports: paved multi-use trail connecting Downtown, Del Paso Heights and Rio Linda, start on C St downtown, about 10 miles, connection with the American River trail
- Sacramento Northern Bike Trail (relation 9710865) — OpenStreetMap · web · checked Oct 15, 2026 Supports: record name and mapped extent from C Street to Elverta
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.