States › Maryland

Salisbury Rail Trail

Rail-trail in Maryland

Runs through Salisbury and Fruitland · Wicomico County

Conditions now

Loading the weather near Fruitland…

Forecast by the National Weather Service for Fruitland · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
0.7 mi 1.1 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.

Salisbury, along the trail (opens in a new tab)
Salisbury, along the trail · Photo: Eric Fischer · CC BY 2.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Salisbury Rail Trail is a rail-with-trail under development by the City of Salisbury, Maryland, following the general alignment of the active Norfolk Southern railroad tracks through the center of town. The city describes it as a paved, multi-modal shared path designed for people on foot as well as on bicycles. Planning began in 2016, and design of Phase One, the southernmost portion, was funded by a grant from the Maryland Department of Transportation's Bikeways Program.

The city's August 2018 Rails with Trails Master Plan, prepared by Toole Design Group, lays out a 5.75-mile trail running south to north from the City of Fruitland to West Naylor Mill Road in seven segments. The southern section serves Salisbury University housing, classrooms and athletic fields; the middle section serves neighborhoods, downtown and the Riverwalk; the northern section reaches the Henry S. Parker Athletic Complex. At the southern end, along South Salisbury Boulevard (US 13 Business), the plan found an existing 8-foot-wide asphalt trail about a mile long in State Highway Administration right-of-way between the highway and the rail lines, crossing Morris Prong, a tributary of the Wicomico River, on the highway bridge. Segment 1 proposed widening it and extending a 12-foot trail to Milford Street. This record maps about 0.7 mile of paved trail in that area.

In June 2022 Maryland's U.S. senators requested $6.1 million in federal funds, later reported as a request rather than a secured award, toward a $22 million plan to extend the trail from Fruitland through Salisbury to Delmar. Mayor Jake Day said then that the first construction could begin in about a year.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

14% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: March to June and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Salisbury, 4.1 km from the trail's middle, 3 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F475058697784898681716052
Low °F293037465565706862504033
Precipitation, in3.63.24.23.63.74.34.85.34.33.93.43.7
Old maps

USGS topographic maps of the trail's middle go back to the 1901 Salisbury sheet (1:62,500); the 1942 Salisbury sheet (1:24,000) shows the area at mid-century. Browse all 11 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Rails To Trails — City of Salisbury GIS · web · checked Oct 14, 2026
    Supports: rail-with-trail under development, paved multi-modal shared path accommodating people on foot, planning began 2016, multi-phase, Phase One (southernmost) design funded by the MDOT Bikeways Program
  3. Salisbury Rails with Trails Master Plan (August 2018) — City of Salisbury, prepared by Toole Design Group · web · checked Oct 14, 2026
    Supports: 5.75 miles, Fruitland to West Naylor Mill Road, Norfolk Southern alignment, segments and sections, Salisbury University, Riverwalk, Henry S. Parker Athletic Complex, existing 8-foot asphalt trail in SHA right-of-way along US 13 Business, Morris Prong bridge, Segment 1 widening and 12-foot trail to Milford Street
  4. $6.1 million announced for expanding Salisbury rail trail to Fruitland, Delmar — WMDT (June 16, 2022) · web · checked Oct 14, 2026
    Supports: $6.1 million requested by Senators Cardin and Van Hollen (correction: requested, not secured), $22 million plan Fruitland to Delmar, Mayor Day on construction in about a year

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.