Setauket-Port Jefferson Station Greenway
Greenway in New York · OpenStreetMap relation
Runs through East Setauket, Brookhaven and Port Jefferson Station · Suffolk County
Conditions now
Loading the weather near Port Jefferson Station…
Forecast by the National Weather Service for Port Jefferson Station · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Setauket-Port Jefferson Station Greenway mile 0 directions to trailhead 1
- Parking at Sunrise Drive mile 0.1 directions to trailhead 2
- Parking at Gnarled Hollow Road mile 0.8 directions to trailhead 3
- Parking at Crescent Drive mile 3.4 directions to trailhead 4
(opens in a new tab) About this trail
The Setauket-Port Jefferson Station Greenway is a paved multi-use trail in the Town of Brookhaven, Suffolk County, New York, running between East Setauket and Port Jefferson Station. The Three Village Community Trust gives its length as about 3.5 miles of paved pathway; 3.2 miles are mapped here. It occupies a 3.3-mile corridor that the New York State Department of Transportation acquired in the 1960s for a bypass of Route 25A that was never built. In the 1990s residents and officials began planning a greenway instead; Assemblyman Steve Englebright secured state funding for the first build-out, and federal funds obtained by Congressman Tim Bishop paid for the remaining sections. The Friends of the Greenway, a stewardship committee of the Three Village Community Trust, cares for the trail, and since 2015 volunteer trail stewards have adopted individual sections.
The first phase, a one-mile span between Gnarled Hollow Road and Lower Sheep Pasture Road, opened in 2009, and the final phase, completed in 2012-13, extended the trail east and west. The route passes county parkland, old-growth forest, a rhododendron woodland once grown by nurseries for Gold Coast estates, a former sand mine, the former Lawrence Aviation Industries property and residential neighborhoods. One entrance is at Limroy Lane in Setauket.
The trail is open during daylight hours only, to walkers, joggers, cyclists and in-line skaters. Motorized vehicles other than wheelchairs are prohibited, horses are not allowed, and pets must be on a non-retractable leash. The trail was designed to be accessible to people with disabilities, and its road crossings have warning systems for trail users and drivers.
Sources checked Oct 14, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
66% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Islip Li Macarthur Airport, 14.9 km from the trail's middle, 24 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 39 41 48 58 68 77 83 81 75 64 54 44 Low °F 25 26 32 41 51 61 67 66 59 47 38 30 Precipitation, in 3.7 3.3 4.5 4.1 3.3 4 3.3 4.2 3.6 4 3.4 4.7 Snow, in 10.3 9.4 6.5 0.6 0 0 0 0 0 0 0.5 4.5 - Old maps
USGS topographic maps of the trail's middle go back to the 1902 Setauket sheet (1:62,500); the 1955 Port Jefferson sheet (1:24,000) shows the area at mid-century. Browse all 16 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationFriends of the Greenway — Three Village Community Trust
- Trail organizationBecome a Trail Steward — Three Village Community Trust
Nearby trails
- Paul Simons Memorial Path 0.8 mi away · 6.8 mi, paved
- North Shore Rail Trail 0.9 mi away · 10.4 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 9734424, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Greenway FAQ's — Three Village Community Trust · organization · checked Oct 14, 2026 Supports: permitted users, daylight hours only, no motorized vehicles except wheelchairs, no horses, non-retractable leash, NYSDOT acquired a 3.3-mile corridor in the 1960s for a Route 25A bypass, 1990s planning, Englebright state funding and Bishop federal funds, first one-mile span Gnarled Hollow Road to Lower Sheep Pasture Road in 2009, final phase 2012-13, Friends of the Greenway committee, adopt-a-section program since 2015, safety crossings
- What is the Greenway? — Three Village Community Trust · organization · checked Oct 14, 2026 Supports: about 3.5 miles of paved multi-use pathway, county parkland, old-growth forest, woodlands, neighborhoods, abandoned sand mining site, handicapped accessible
- Three Village Community Trust celebrates Greenway Trail — TBR News Media (April 2019) · press · checked Oct 14, 2026 Supports: nearly 3.5-mile paved trail, Limroy Lane entrance in Setauket, first phase opened 2009, rhododendron field grown for Gold Coast estates, sandpit, former Lawrence Aviation Industries property, Englebright and Bishop funding
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.