States › Texas

45SW Trail

Greenway in Texas

Runs through Austin · Travis and Hays counties

Conditions now

Loading the weather near Austin…

Forecast by the National Weather Service for Austin · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Official website

Length
5.3 mi 8.6 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.

A new bike path (opens in a new tab)
A new bike path · Photo: Lars Plougmann · CC BY-SA · Flickr

About this trail

The 45SW Trail, mapped in OpenStreetMap as the SH45 Shared Use Path, is a 4.5-mile paved shared use path beside the 45SW Toll Road on the southern edge of Austin, Texas. The Central Texas Regional Mobility Authority built it as part of the 3.6-mile toll road, which connects the south end of MoPac east to FM 1626 in Hays County and was built with practices meant to protect the Edwards Aquifer Recharge Zone. The Mobility Authority celebrated the road and path with a ribbon cutting in May 2019, and the road was expected to open to traffic on June 1, 2019. The path does not follow a railroad.

The trail runs along the toll road from MoPac and Escarpment Boulevard to FM 1626. It has two trailheads with parking and bicycle repair stands, one at MoPac and one at Bliss Spillar Road, and neither requires driving the toll road to reach. Along the way are an overlook at Bear Creek, a shaded rest area called the Hill Country Classroom, and 14 interpretive signs on the history and natural features of the Hill Country and the Edwards Aquifer, some linked to augmented-reality animations in the authority's Trail Explorer app. The Mobility Authority describes future connections to the Violet Crown Trail.

All Mobility Authority shared use paths are paved, ADA compliant and open to walkers, runners and cyclists; dogs must be leashed. The authority notes that most of its paths have no water fountains or restrooms. This record maps about 5.3 miles, a little more than the official length, because it includes short connecting paths.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

4% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: October to May. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Dripping Springs 6 E, 13 km from the trail's middle, 99 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F606572798591949589806961
Low °F394349566470727266584841
Precipitation, in2.62.12.92.64.33.72.12.13.642.92.7
Snow, in00.20000000000.1
Old maps

USGS topographic maps of the trail's middle go back to the 1896 Austin sheet (1:125,000); the 1968 Signal Hill sheet (1:24,000) shows the area at mid-century. Browse all 8 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. 45SW Trail — Central Texas Regional Mobility Authority · web · checked Oct 15, 2026
    Supports: name 45SW Trail, 4.5-mile paved shared use path, from MoPac and Escarpment Boulevard to FM 1626, two trailheads (MoPac, Bliss Spillar) with parking and bike repair stands, no toll needed to reach them, Bear Creek overlook, 14 interpretive signs, Trail Explorer app, future connections to the Violet Crown Trail
  3. Mobility Authority Celebrates Upcoming Opening of 45SW Toll with Community-wide Celebration — Central Texas Regional Mobility Authority press release (May 25, 2019) · web · checked Oct 15, 2026
    Supports: 3.6-mile toll road from MoPac to FM 1626 in Hays County, continuous 4.5-mile shared use path, trailheads at MoPac and Bliss Spillar Road, Hill Country Classroom rest area, road expected to open June 1, ribbon cutting at Bear Creek Bridge, Edwards Aquifer Recharge Zone
  4. Shared Use Paths — Central Texas Regional Mobility Authority · web · checked Oct 15, 2026
    Supports: all Mobility Authority shared use paths paved and ADA compliant, open to walkers, runners and cyclists, dogs on leash, most facilities without water fountains or restrooms

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.