Sharpstown Trail
Greenway in Texas
Runs through Houston · Harris County
Conditions now
Loading the weather near Houston…
Forecast by the National Weather Service for Houston · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Beechnut Street mile 0 directions to trailhead 1
No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Sharpstown Trail is a concrete hike-and-bike trail in the Sharpstown area of southwest Houston, Texas, built in a CenterPoint Energy utility corridor parallel to South Gessner Road. It grew out of a 2014 master license agreement between the City of Houston and CenterPoint Energy allowing hike-and-bike trails on utility corridors; the Houston Parks Board led the study and community meetings from 2018 to 2020 with the city, CenterPoint, the Sharpstown Civic Association and elected officials. The owner of the first phase is the Southwest Houston Redevelopment Authority (TIRZ 20).
Phase 1, from Beechnut Street to Sands Point Drive, broke ground on February 26, 2024. State accessibility records describe it as a 10-foot-wide trail mostly within a CenterPoint electrical easement, with a midblock crossing controlled by a pedestrian hybrid beacon, built from March 2024 to March 2025 at an estimated cost of $2.2 million. Congressman Al Green's office announced a ribbon cutting for the 1.8-mile trail at 8600 South Gessner Drive on National Trails Day, June 7, 2025. This record maps about 1.6 miles of it. The Houston Parks Board says the trail could connect to the Westchase trails to the north and the Brays Bayou Greenway to the south.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
9% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: October to April. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Houston Sugarland Memorial, 14.6 km from the trail's middle, 4 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 64 68 74 80 87 92 95 94 90 83 74 66 Low °F 45 50 55 60 69 74 76 76 72 62 53 46 Precipitation, in 3.6 2.8 3.5 4.3 5.2 4.2 4.2 5.3 4.4 4.7 3.8 3.8 - Old maps
USGS topographic maps of the trail's middle go back to the 1915 Alief sheet (1:24,000); the 1955 Sugar Land sheet (1:62,500) shows the area at mid-century. Browse all 9 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationSharpstown Trail — Houston Parks Board
Nearby trails
- Brays Bayou Greenway 0.7 mi away · 41.5 mi, paved
- Keegan's Bayou Trail 1.3 mi away · 4.2 mi, paved
- Library Loop Trail 1.7 mi away · 1.4 mi, paved
- Brays Bayou Connector Trail 1.7 mi away · 2.4 mi, paved
- Quail Trail 3.5 mi away · 6.0 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- TABS2025010763: Sharpstown Trail - Phase 1 from Beechnut St to Sands Point Dr — Texas Department of Licensing and Regulation · government source · checked Oct 17, 2026 Supports: Phase 1 Beechnut Street to Sands Point Drive; 10-foot-wide hike and bike trail mainly within a CenterPoint electrical easement; midblock crossing with pedestrian hybrid beacon; start March 4, 2024, completion March 28, 2025; estimated cost $2,200,000; owner Southwest Houston Redevelopment Authority/TIRZ 20
- Sharpstown Trail — Houston Parks Board · organization · checked Oct 17, 2026 Supports: CenterPoint Energy corridor parallel to South Gessner Road; 2014 City of Houston and CenterPoint master license agreement; Houston Parks Board-led study and meetings 2018-2020 with the city, CenterPoint, Sharpstown Civic Association and elected officials; Phase 1 groundbreaking February 26, 2024; possible connections to Westchase trails and Brays Bayou Greenway
- Congressman Al Green Celebrates National Trails Day ... in Sharpstown Trail Ribbon Cutting — press release of Rep. Al Green (via Capitol Releases), June 7, 2025 · web · checked Oct 17, 2026 Supports: 1.8-mile hike-and-bike pathway from Sands Point Drive to Beechnut Street; ribbon cutting June 7, 2025 (National Trails Day) at 8600 S. Gessner Drive; partners including Houston Parks Board and Southwest Houston Redevelopment Authority/TIRZ 20
- Sharpstown Trail, way 1369402140 and neighbouring ways (1325586494-1325586502, 1369401652-1369403373, 1390486137-1390486139) — OpenStreetMap · web · checked Oct 17, 2026 Supports: concrete surface; the record's mapped length of about 1.6 miles
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.