Sheboygan Interurban Trail
Trolley trail in Wisconsin
Runs through Town of Holland (Sheboygan County), Cedar Grove and Town of Belgium · Sheboygan and Ozaukee counties
Conditions now
Loading the weather near Cedar Grove…
Forecast by the National Weather Service for Cedar Grove · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.
No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Sheboygan Interurban Trail is the Sheboygan County part of the Interurban Trail in eastern Wisconsin, continuing the Ozaukee Interurban Trail north from the Ozaukee-Sheboygan county line through Cedar Grove to Oostburg. It uses the right-of-way of the Milwaukee Electric Railway and Light Company's interurban passenger line between Milwaukee and Sheboygan. In Sheboygan County the trail is overseen by the county Planning and Resources Department and a committee of the county board. The first stretch, from the county line to Cedar Grove, was built in 2005, and the section from Cedar Grove to Oostburg followed in 2007.
The trail begins at Pebble Beach Road on the county line, where it meets the Ozaukee Interurban Trail, which continues about 30 miles south toward Milwaukee. Its first 5.5 miles, through Cedar Grove and Oostburg, are off-road and run next to an active railroad; the off-road path ends at DeMaster Road in Oostburg. A trailhead with parking is at South 10th Street and Center Avenue in downtown Oostburg. North of Oostburg the route follows low-volume roads through Kohler-Andrae State Park on Lake Michigan to Washington Avenue in Sheboygan, near Lakeview Park, for about 14 miles in all. Plans have called for an off-road extension from Oostburg into Sheboygan by way of Kohler-Andrae, which would connect the trail with the city's bikeways and the Old Plank Road Trail.
The off-road section is paved with asphalt. Parking at the northern end is in Kohler-Andrae State Park.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
13% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Hingham Wwtp, 10.3 km from the trail's middle, 25 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 27 30 41 53 66 75 80 78 71 58 44 32 Low °F 12 14 24 34 45 55 61 60 52 40 29 19 Precipitation, in 1.7 1.8 2.1 3.8 4 4.3 3.6 3.5 2.7 2.9 2.1 2.1 Snow, in 11.2 14.2 6.6 2.2 0 0 0 0 0 0 1.4 13 - Old maps
USGS topographic maps of the trail's middle go back to the 1954 Sheboygan Falls sheet (1:62,500); the 1954 Milwaukee sheet (1:250,000) shows the area at mid-century. Browse all 5 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
Nearby trails
- Ozaukee Interurban Trail within 0.2 mi · 26.6 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Ozaukee Interurban Trail — Wikipedia · organization · checked Oct 15, 2026 Supports: Milwaukee Electric Railway and Light Company right-of-way, route through Cedar Grove to Oostburg, northern end at DeMaster Road, Sheboygan County oversight, construction 2005 and 2007, planned extension via Kohler-Andrae to Sheboygan and the Old Plank Road Trail
- Sheboygan Interurban Trail — TrailLink · web · checked Oct 15, 2026 Supports: Pebble Beach Road start, 5.5 off-road miles next to an active railroad, low-volume roads to Sheboygan, Kohler-Andrae State Park, Lakeview Park, Washington Avenue endpoint, 14 miles, asphalt, Oostburg and Kohler-Andrae parking, connection to the Ozaukee Interurban Trail
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.