Sherman-Williamsville Trail
Rail-trail in Illinois
In Sangamon County
Conditions now
Loading the weather near Williamsville…
Forecast by the National Weather Service for Williamsville · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Bahr Road mile 4.4 directions to trailhead 1
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Sherman-Williamsville Trail is a 4.4-mile asphalt path that joins the villages of Sherman and Williamsville in northern Sangamon County, Illinois. The Village of Sherman calls it the Heritage Route 66 Multi-Use Sherman to Williamsville Trail. It occupies part of the right-of-way of the Illinois Terminal Railroad's electric interurban line, which operated from 1906 until 1956. The corridor generally parallels Interstate 55 and now belongs to the utility company Ameren, which uses it for high-voltage power lines. The village of Williamsville carried out the trail's construction and runs it.
The two villages planned the path for more than 12 years. A $269,000 grant in December 2010 paid for engineering, and $2 million for construction was awarded in 2016. The project cost $2.8 million in all: $2 million from an Illinois Department of Transportation grant and $800,000 shared by the two villages. The trail opened on November 20, 2021. Village officials held a formal ribbon cutting at the Sherman trailhead on August 31, 2022.
The path is 10 feet wide. Its southwest end in Sherman is on East Andrew Road between Bahr Road and Pine Drive, and the Sherman trailhead is near Andrew and Bahr roads. The northeast end is on Conrey Street in Williamsville, near Williamsville High School. From the high school, an older limestone trail circles Lake Williamsville for more than two miles. In 2021 Sherman was working on a link to Sherman Village Park on Rail Fence Road, and Williamsville officials mentioned talk of a future trail to Elkhart in Logan County.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
29% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to June and September to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Springfield Capital Airport, 12.8 km from the trail's middle, 2 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 36 41 53 66 76 84 87 85 80 67 53 41 Low °F 20 24 33 43 54 63 66 64 56 45 34 25 Precipitation, in 2 1.9 2.8 4 4.5 4.6 3.9 3.4 2.9 3.3 2.7 2.1 Snow, in 6.7 6.1 3.1 0.3 0 0 0 0 0 0.1 1.2 4.3 - Old maps
USGS topographic maps of the trail's middle go back to the 1907 Springfield sheet (1:62,500); the 1966 Williamsville sheet (1:24,000) shows the area at mid-century. Browse all 7 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Sherman-Williamsville Trail — Wikipedia · organization · checked Oct 15, 2026 Supports: Illinois Terminal Railroad interurban 1906–1956; parallels I-55; Ameren ownership and power corridor; built and operated by Williamsville; December 2010 $269,000 engineering grant; 2016 $2 million construction award; end points on East Andrew Road and Conrey Street
- Ribbon Cutting at Bike Trail — Village of Sherman · organization · checked Oct 15, 2026 Supports: ribbon cutting at the Sherman trailhead on August 31, 2022
- Bike Trail is open on 11.20.21 — Village of Sherman · organization · checked Oct 15, 2026 Supports: name Heritage Route 66 Multi-Use Sherman to Williamsville Trail; opening November 20, 2021
- On the right path — Illinois Times · press · checked Oct 15, 2026 Supports: 4.4 miles; 10-foot asphalt; opened November 20, 2021; $2.8 million cost with $2 million IDOT grant and $800,000 from the villages; more than 12 years of planning; trailheads at Andrew and Bahr roads and on Conrey Street near Williamsville High School; limestone trail around Lake Williamsville; Sherman Village Park link; talk of a trail to Elkhart
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.