States › New York

Sherwood Greenway

Greenway in New York

Runs through Tonawanda Town and Town of Tonawanda · Erie County

Conditions now

Loading the weather near Tonawanda Town…

Forecast by the National Weather Service for Tonawanda Town · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.9 mi 3.1 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Dupont Avenue mile 0.3 directions to trailhead 1
  2. Parking at Riverview Boulevard mile 0.5 directions to trailhead 2
  3. Parking at Dupont Avenue mile 0.5 directions to trailhead 3
  4. Parking at Sheridan Drive mile 1.6 directions to trailhead 4
Sherwood Greenway drawn on the 1950 USGS topographic map of Buffalo NW, New York
Then: the 1950 USGS Buffalo NW sheet (1:24,000) with today's trail line. Generated from USGS and OpenStreetMap data: map public domain, line © OpenStreetMap contributors. The sheet at USGS.

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Sherwood Greenway is a two-mile multi-use trail in the Town of Tonawanda, Erie County, New York. It connects the Two Mile Creek Trail in Sheridan Park with the Buffalo Riverwalk, linking several neighborhoods to the Niagara River waterfront. Planning began in 2003 as a joint undertaking of Erie County, the Town of Tonawanda, the New York State Department of Transportation and the New York State Thruway Authority, and Praxair was also named a partner. The trail was the centerpiece of a $3.8 million project that also resurfaced Sheridan Drive (NY 324) and the Sheridan Drive Extension (NY 325). The contract went to Concrete Applied Technologies of Alden; construction began in spring 2013, and officials cut the ribbon on June 23, 2014, ahead of the fall 2014 target. The trail cost about $1.045 million, about 75 percent from the Federal Highway Administration and the remaining 25 percent, about $258,000, from Erie County. Erie County and the Town of Tonawanda jointly maintain it.

The greenway closed a gap in the town's trail system: at the opening, the county executive said the system was now connected from the Shoreline Trail to Sheridan Park. This record maps about 1.9 miles, with access points on Riverview Boulevard, Dupont Avenue and Sheridan Drive.

The county and state releases call it a multi-use trail but do not give its surface; OpenStreetMap maps it as asphalt with some concrete sections, with marked crossings.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

5% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
N Tonawanda, 9.9 km from the trail's middle, 7 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F333644577079838274614938
Low °F171724344555595850403123
Precipitation, in3.22.42.93.63.43.33.53.13.93.93.53.4
Snow, in22.916.113.12.7000000.5618.5
Old maps

USGS topographic maps of the trail's middle go back to the 1894 Buffalo sheet (1:62,500); the 1950 Buffalo NW sheet (1:24,000) shows the area at mid-century. Browse all 10 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. 6/23/14: Officials Cut Ribbon on Completed Sherwood Greenway Trail — Erie County Executive · government source · checked Oct 14, 2026
    Supports: June 23, 2014 ribbon cutting; two-mile trail from the Two Mile Creek Trail in Sheridan Park to the Buffalo Riverwalk; planning from 2003 by Erie County, the town, NYSDOT and the Thruway Authority; construction from spring 2013, finished ahead of fall 2014; part of a $3.8 million project with Sheridan Drive improvements; about $1.045 million, 75% FHWA, 25% (about $258,000) Erie County; joint maintenance by the county and town; connected from the Shoreline Trail to Sheridan Park
  3. Construction To Begin On Sherwood Greenway Trail (2013) — New York State Senate · government source · checked Oct 14, 2026
    Supports: two-mile multi-use trail linking neighborhoods to the Niagara River waterfront; centerpiece of the $3.8 million highway project on NY 324 and NY 325; New York State, Erie County, Town of Tonawanda and Praxair; contract to Concrete Applied Technologies (CATCO) of Alden; scheduled completion fall 2014
  4. Sherwood Greenway (way 250247565 and connected ways) — OpenStreetMap · web · checked Oct 14, 2026
    Supports: record length about 1.9 miles; access points on Riverview Boulevard, Dupont Avenue and Sheridan Drive; asphalt and concrete surface; marked crossings

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.