Shingobee Connection Trail
Greenway in Minnesota
Runs through Walker and Shingobee Township · Cass County
Conditions now
Loading the weather near Walker…
Forecast by the National Weather Service for Walker · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Walker Bay Boulevard mile 0.6 directions to trailhead 1
- Parking at Shingobee Road Northwest mile 2.7 directions to trailhead 2
No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Shingobee Connection Trail is a paved multi-use trail in Cass County, Minnesota, that links the City of Walker with the Paul Bunyan and Heartland state trails. Lakeland PBS put its length at almost 7 miles; this record maps about 4.4 miles of it, running south from Walker. According to the Bicycle Alliance of Minnesota, the name comes from an Ojibwe word for pine, cedar and spruce.
The idea for the trail emerged in June 2005, and volunteers donated thousands of hours to it. Shingobee Township received a $175,000 state Parks and Trails Legacy grant in fiscal 2010 to build phases 2 and 3 toward the Paul Bunyan State Trail, and the City of Walker received $425,000 in fiscal 2013 for a 0.3-mile section and an underpass beneath State Highway 200/371 to complete the connection. Lakeland PBS reported the trail officially open in August 2014, when the tunnel under Highway 371 in Walker was finished, and described it as a project of more than $2 million.
In Walker the trail runs beside Highway 371, mostly separated from traffic, to the city park on the lakefront. One at-grade crossing of Highway 200/371 remained at the south edge of town. A sixth phase, an underpass built as a 12-by-10-foot box culvert about 100 feet long, was funded in 2024 with a $300,000 DNR Regional Trail Grant and MnDOT money, with construction expected after July 2025; a Streets.mn account published in September 2026 still described an at-grade crossing there. South of town the trail climbs through woods past Ah Gwah Ching Road and crosses the mouth of Shingobee Bay on its way to the Paul Bunyan State Trail.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
The Federal Railroad Administration's national rail map marks 41% of this route as a trail on former railroad right-of-way.
- Shade
30% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Walker, 3.8 km from the trail's middle, 39 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 19 25 38 52 66 75 79 77 68 53 37 25 Low °F 1 4 18 31 44 55 59 57 49 36 22 8 Precipitation, in 0.8 0.7 1.2 2.2 3.3 4.3 4.1 3.2 3.4 2.8 1.3 0.8 - On the National Register
- Minnesota State Sanatorium for Consumptives, Walker · historic district, listed 2001
- Old maps
USGS topographic maps of the trail's middle go back to the 1954 Bemidji sheet (1:250,000); the 1957 Bemidji sheet (1:250,000) shows the area at mid-century. Browse all 6 maps in topoView.
Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
Nearby trails
- Paul Bunyan State Trail within 0.2 mi · 105 mi, paved
- Heartland State Trail 1.1 mi away · 61.0 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Shingobee Connection Trail Phase 2 and 3 — Minnesota's Legacy · government source · checked Oct 15, 2026 Supports: paved multi-use trail connecting Walker and the Paul Bunyan State Trail; Shingobee Township, $175,000, FY2010, July 2010-June 2011
- Phase V Shingobee Connection Trail — Minnesota's Legacy · government source · checked Oct 15, 2026 Supports: City of Walker, $425,000, FY2013, 0.3-mile section and underpass under Highway 200/371 completing the trail; connects Paul Bunyan and Heartland state trails to Walker; Cass County
- Shingobee Connection Trail Project Complete — Lakeland PBS · organization · checked Oct 15, 2026 Supports: officially open August 2014 with Highway 371 tunnel in Walker, almost 7 miles, over $2 million
- Shingobee Trail (Paul Bunyan and Heartland Trail Connection) Improved Crossing Coming! — Bicycle Alliance of Minnesota · organization · checked Oct 15, 2026 Supports: idea June 2005, volunteer hours, Ojibwe meaning of the name, Highway 200/371 at-grade crossing, Phase 6 box culvert underpass, 2024 DNR grant of $300,000 and MnDOT funding, construction after July 2025
- Biking Through the Woods of Walker, Minnesota — Streets.mn · web · checked Oct 15, 2026 Supports: route in Walker beside Highway 371 to lakefront park, at-grade crossing south of Walker as of 2026, woods, Ah Gwah Ching Road, Shingobee Bay, junction with Paul Bunyan Trail
- OpenStreetMap ways for this trail — OpenStreetMap contributors · web · checked Oct 15, 2026 Supports: record extent: about 4.4 miles south from Walker
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.