Ship Creek Trail
Greenway in Alaska · OpenStreetMap relation
Runs through Anchorage · Anchorage Municipality
Conditions now
Loading the weather near Anchorage…
Forecast by the National Weather Service for Anchorage · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Greenway trail entirely separated from non-motorized network
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Ship Creek Trailhead mile 0 directions to Ship Creek Trailhead
- Parking at Richmond Avenue mile 0.1 directions to trailhead 2
- Parking mile 0.1 directions to trailhead 3
- Parking at North Post Road mile 1.4 directions to trailhead 4
- Parking at East Ship Creek Avenue mile 2.1 directions to trailhead 5
- Parking at East Ship Creek Avenue mile 2.1 directions to trailhead 6
- Parking at East Whitney Road mile 2.3 directions to trailhead 7
- Parking at East Ship Creek Avenue mile 2.4 directions to trailhead 8
- Parking at East Ship Creek Ave mile 2.5 · restrooms · water directions to trailhead 9
- Parking at East Ship Creek Ave mile 2.5 · restrooms · water directions to trailhead 10
- Parking at North C Street mile 2.6 · restrooms · water directions to trailhead 11
(opens in a new tab) About this trail
The Ship Creek Trail is a paved path of about 2.5 miles in Anchorage, Alaska, that follows Ship Creek east from downtown. Its western trailhead is near the Alaska Railroad depot and the Ship Creek fish ladder, and it ends in the parking lot of William Tyson Elementary School in Mountain View, where it meets the Peterkin Avenue bike boulevard. The Anchorage tourism site lists the length as 2.5 miles and another page from the same site as 5.8 miles; the shorter figure matches the route described.
The corridor is lined with railroad tracks and industrial yards. Fishing for king and silver salmon is limited to the far western end, though the creek can be watched along the whole path. The trail is part of the Moose Loop, which links the Campbell Creek, Lanie Fleischer Chester Creek and Tony Knowles Coastal Trails.
A gap remains between the Ship Creek Trail and the Tony Knowles Coastal Trail. Anchorage Daily News reported in 2023 that a link of roughly a mile past the Small Boat Launch would be built with $7.7 million in federal funds through AMATS, with construction expected from 2025 to 2026, and that the Alaska Railroad was replacing a bridge over Ship Creek so the path could pass beneath it.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- When to ride
Best months: May to September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Anchorage Merrill Field, 0.8 km from the trail's middle, 25 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 23 28 34 47 58 66 68 66 57 42 29 25 Low °F 8 12 17 30 41 50 54 51 43 30 16 11 Precipitation, in 0.5 0.7 0.5 0.3 0.6 1 1.7 2.5 3 1.6 0.9 0.9 - Old maps
USGS topographic maps of the trail's middle go back to the 1951 Anchorage sheet (1:250,000); the 1953 Anchorage A-8 sheet (1:63,360) shows the area at mid-century. Browse all 7 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Tony Knowles Coastal Trail 0.4 mi away · 10.4 mi, paved
- A/C St shared use path 0.7 mi away · 6.9 mi, paved
- Glenn Highway Trail 1.1 mi away · 18.8 mi, paved
- Chester Creek Trail 1.3 mi away · 4.7 mi, paved
- RJSP Multiuse 1.9 mi away · 1.3 mi, paved
- Chester Creek Connector 2.0 mi away · 2.0 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 15661243, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Ship Creek Trail - Visit Anchorage · web · checked Oct 17, 2026 Supports: length of 2.5 miles, endpoints, fishing, bike boulevard connection, corridor setting
- Ship Creek Trail - Visit Anchorage · web · checked Oct 17, 2026 Supports: paved surface, Moose Loop connections, 5.8-mile listing
- Missing link unlocked: funding paves way for connecting Anchorage's Coastal and Ship Creek trails - Anchorage Daily News · web · checked Oct 17, 2026 Supports: planned link of about one mile, $7.7 million federal funds, 2025-2026 construction timeline, railroad bridge replacement
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.