States › Connecticut

Shoreline Greenway Trail

Greenway in Connecticut · OpenStreetMap relation

Runs through East Haven and Branford

Conditions now

Loading the weather near East Haven…

Forecast by the National Weather Service for East Haven · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.5 mi 2.4 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Pine Orchard Road mile 0.1 directions to trailhead 1
  2. Parking at Tabor Drive mile 0.6 directions to trailhead 2
  3. Parking at Tabor Drive mile 0.7 directions to trailhead 3
  4. Parking at Short Beach Road mile 3.9 directions to trailhead 4
  5. Parking at Hoop Pole Lane mile 4.3 directions to trailhead 5
  6. Parking at Elliot Street mile 4.6 directions to trailhead 6

Plan your visit

Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).

Shoreline Greenway Trail, Farm River State Park (54054011744) (opens in a new tab)
Shoreline Greenway Trail, Farm River State Park (54054011744) · Photo: Ethan Long · CC BY-SA · Wikimedia Commons

About this trail

This entry is a 0.7-mile segment of the Shoreline Greenway Trail in Branford, Connecticut, part of a planned 25-mile greenway from Lighthouse Point in New Haven through East Haven, Branford and Guilford to Hammonasset Beach State Park in Madison. The trail is promoted by Shoreline Greenway Trail, Inc., a Branford nonprofit, and built in sections by the towns; about 4.6 miles existed as of TrailLink's listing. Branford's sections run between Pine Orchard Road and Tabor Drive: a 0.9-mile section that parallels the active railroad, in places less than 50 feet from the tracks, and a roughly 0.6-mile stone-dust Tabor section across the town-owned Tabor Drive property, funded 80 percent by the Federal Highway Administration. Surfaces are crushed stone and dirt.

Sources checked Oct 12, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

63% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
New Haven Tweed Airport, 2.7 km from the trail's middle, 4 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F384047586876828175645344
Low °F232430394959666557463629
Precipitation, in2.72.83.74.23.53.53.43.543.83.13.5
Old maps

USGS topographic maps of the trail's middle go back to the 1892 New Haven sheet (1:62,500); the 1954 Branford sheet (1:24,000) shows the area at mid-century. Browse all 11 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 8709835, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Branford — Shoreline Greenway Trail, Inc. · organization · checked Oct 12, 2026
    Supports: organization based in Branford, Pine Orchard/Birch Road and Tilcon Drive sections, Tabor section three-quarter mile, route from downtown Branford to Stony Creek using Trolley Trail
  3. Along The Tabor Trail — New Haven Independent · press · checked Oct 12, 2026
    Supports: Tabor section about 0.6 mi on town-owned 77-acre Tabor Drive property, endpoints Tabor Drive and Pine Orchard Road, 10-ft stone dust, $440,000 cost 80% FHWA, town maintains with Greenway Trail group
  4. Shoreline Greenway Trail — TrailLink · web · checked Oct 12, 2026
    Supports: 25-mile plan Lighthouse Point to Hammonasset, four towns, 4.6 miles built, Branford Pine Orchard Road to Tabor Drive, 0.9-mile section beside active rail line, Trolley Trail 0.6 mi on former trolley line, crushed stone and dirt surface

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.