South Tar River Greenway
Greenway in North Carolina · OpenStreetMap relation
Runs through Greenville · Pitt County
Conditions now
Loading the weather near Greenville…
Forecast by the National Weather Service for Greenville · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
The South Tar River Greenway is a 3.1 miles (5.0 km) greenway located in Greenville, North Carolina. The northwest terminus trailhead is located at the Town Common. The trail goes east and follows the southern bank of the Tar River, then at the confluence of the Tar River and Green Mill Run, turns south and follows the western edge of the tributary. The southeast terminus trailhead is located at Greensprings Park. This greenway is the second in the city, after the 1.5 miles (2.4 km) Green Mill Run Greenway. The $1,488,000 project is funded from the Federal Highway Administration budget through its inclusion in the Federal FY2005 Appropriations Act.
From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at North Side Street mile 1.4 directions to trailhead 1
- Parking at River Drive mile 2.2 directions to trailhead 2
- Parking at Cemetery Road mile 4.5 · restrooms directions to trailhead 3
- Greensprings Park mile 4.6 · restrooms directions to Greensprings Park
(opens in a new tab) About this trail
The South Tar River Greenway is a paved greenway along the south bank of the Tar River in Greenville, North Carolina, built by the City of Greenville in phases since 2008. The first phase, about a mile from the Town Common to North Warren Street, broke ground on December 12, 2008, and opened on December 4, 2009, as part of a $1,488,000 project funded through federal highway appropriations. Phase II, a 2.1-mile segment that includes Lookout Point, a riverbank overlook at the mouth of Green Mill Run, and a crossing of East Fifth Street, opened on June 11, 2011.
From the Town Common the greenway runs east along the river, then turns south along the west side of Green Mill Run toward Greensprings Park. It meets the Green Mill Run Greenway, which runs west to Evans Park past Elm Street Park and College Hill; together the two greenways total just under 9 miles. The city counts 15 trailheads, the easternmost on Fifth Street in Greensprings Park, and sculptures from the Down East Sculpture Exhibition line the trail. A 0.8-mile Phase 3A, from the Town Common west to Nash Street, opened in late 2023 at a cost of about $3.75 million. This record maps about 4.8 miles, including short on-street links on River Drive.
Phase 3B, extending west from Nash Street past the Veterans Affairs health care center to Moye Boulevard, began construction in August 2023 as part of a $48.5 million BUILD grant project that also includes the Town Common Connector; completion was scheduled for fall 2024. Through Greenville the greenway carries part of an alternate route of the East Coast Greenway.
Sources checked Oct 16, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
55% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: February to May and October to December. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Greenville, 4.8 km from the trail's middle, 6 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 53 57 64 74 80 87 90 88 83 74 64 56 Low °F 33 35 41 50 59 67 71 70 64 52 41 35 Precipitation, in 3.9 3.4 4.2 3.8 4 4.4 5.9 6 7.3 3.6 3.4 3.5 Snow, in 1.6 0.8 0.1 0 0 0 0 0 0 0 0 0.8 - On the National Register
- Skinnerville--Greenville Heights Historic District, Greenville · historic district, listed 2005 · nomination file for Skinnerville--Greenville Heights Historic District
- Old maps
USGS topographic maps of the trail's middle go back to the 1903 Winterville sheet (1:62,500); the 1954 Rocky Mount sheet (1:250,000) shows the area at mid-century. Browse all 7 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Green Mill Run Greenway within 0.2 mi · 3.1 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 12284652, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- “South Tar River Greenway”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
- Wikidata Q7568616, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
- South Tar River Greenway — Wikipedia · organization · checked Oct 16, 2026 Supports: south bank of the Tar River, route east then south along Green Mill Run, Phase I dates (groundbreaking December 12, 2008, opened December 4, 2009) and extent, $1,488,000 federal highway appropriation, Phase II 2.1 miles opened June 11, 2011 with Lookout Point and East Fifth Street crossing, East Coast Greenway alternate route
- Year of the Trail: Greenville's greenways help city make connections — The Daily Reflector · web · checked Oct 16, 2026 Supports: written by City of Greenville staff; South Tar River and Green Mill Run greenways together just under 9 miles, Green Mill Run route to Evans Park via Elm Street Park and College Hill, 15 trailheads, easternmost at Fifth Street in Greensprings Park, Down East Sculpture Exhibition, BUILD grant segments broke ground August 2023
- City officials open new segment of South Tar River Greenway — The Daily Reflector · web · checked Oct 16, 2026 Supports: Phase 3A of about 0.8 mile from the Town Common to Nash Street opened (article December 2, 2023), about $3.75 million; Phase 3B from Nash Street past the VA center to Moye Boulevard begun August 2023, fall 2024 completion, $48.5 million BUILD project with the Town Common Connector
- OpenStreetMap relation 12284652 — OpenStreetMap contributors · web · checked Oct 16, 2026 Supports: mapped length about 4.8 miles, on-street links on River Drive
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.