Southern Links Trailway
Rail-trail in Michigan · OpenStreetMap relation
Runs through Millington, Millington Township, Forest Township (Genesee County), Otter Lake, Marathon Township and Columbiaville · Tuscola, Genesee and Lapeer counties
Conditions now
Loading the weather near Otter Lake…
Forecast by the National Weather Service for Otter Lake · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Managed by Southern Links Trailway Management Council.2
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Water Street mile 10.1 directions to trailhead 1
- Parking at Water Street mile 10.1 directions to trailhead 2
(opens in a new tab) About this trail
The Southern Links Trailway is a rail-trail of about 10 miles in Genesee, Lapeer and Tuscola counties, Michigan, connecting the communities of Columbiaville, Otter Lake and Millington. It occupies a former Michigan Central Railroad corridor. The Michigan Department of Natural Resources maps the trailway as part of the Iron Belle Trail's bicycling route between Flint and Millington. A volunteer friends group maintains the trail.
The trail runs north from Columbiaville through Otter Lake to Millington, with trailhead parking on Water Street in Columbiaville, on Detroit Street in Otter Lake and at the school complex on Gleason Street in Millington. The high point is just north of Otter Lake, so the trail climbs gently from either end on the old railroad grade. Most of the route is tree-lined, passing fields, wetlands, woods and farmland.
The trail is paved with asphalt, and an adjacent path is set aside for horseback riders.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
The Federal Railroad Administration's national rail map marks 46% of this route as a trail on former railroad right-of-way.
- Shade
36% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Lapeer 2w, 19.7 km from the trail's middle, 11 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 31 35 45 57 69 78 82 80 74 61 48 36 Low °F 16 16 25 35 46 56 61 59 51 40 32 22 Precipitation, in 2.8 2.3 2.5 3.3 3.7 3.2 3.4 4.6 2.6 3 2.6 2.3 - Old maps
USGS topographic maps of the trail's middle go back to the 1954 Flint sheet (1:250,000); the 1963 Columbiaville sheet (1:24,000) shows the area at mid-century. Browse all 5 maps in topoView.
Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Historic Railway
The line in its working days, from copies of old photographs.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 9767685, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Michigan DNR Statewide Railtrails, Michigan · Government dataset · Michigan DNR dataset notice on DNRTrailsOPENDATA: "a public record ... no restrictions on the use, reproduction, or distribution of this dataset", as is, no warranty · checked Oct 31, 2026 “managing_org from Michigan DNR Statewide Railtrails”
- Michigan's Iron Belle Trail map 11: Flint - Columbiaville - Otter Lake - Southern Links Trailway - Millington — Michigan DNR · government source · checked Oct 15, 2026 Supports: Southern Links Trailway (Columbiaville to Millington) shown on the Iron Belle Trail bicycling route between Flint and Millington
- List of rail trails in Michigan — Wikipedia · organization · checked Oct 15, 2026 Supports: 10.2 miles; Genesee, Lapeer and Tuscola counties; former Michigan Central Railroad
- Southern Links Trailway — TrailLink (Rails to Trails Conservancy) · web · checked Oct 15, 2026 Supports: connects Columbiaville, Otter Lake and Millington; asphalt with adjacent equestrian path; high point just north of Otter Lake with gradual climbs from either end; tree-lined route through fields, wetlands, forests and farmland; active friends group maintains the trail; trailhead parking on Water Street, Detroit Street and at the Gleason Street school complex
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.
