Southern Tip Bike & Hike Trail
Rail-trail in Virginia · OpenStreetMap relation
In Northampton County
Conditions now
Loading the weather near Cape Charles…
Forecast by the National Weather Service for Cape Charles · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking mile 0 · restrooms directions to trailhead 1
- Parking at Seaside Road mile 0 · restrooms directions to trailhead 2
- Parking at Cedar Grove Drive mile 2.6 directions to trailhead 3
- Parking at Capeville Drive mile 4.9 directions to trailhead 4
(opens in a new tab) About this trail
The Southern Tip Bike & Hike Trail is a paved rail-trail at the southern end of Virginia's Eastern Shore, in Northampton County. It runs about 5 miles north from the Eastern Shore of Virginia National Wildlife Refuge visitor center, beside the northbound lanes of U.S. Route 13, to Capeville Drive near Cape Center. The U.S. Fish and Wildlife Service, which oversees the refuge, funded and built both completed phases, on land formerly owned by The Nature Conservancy, which donated part of the easement and land.
Except for its southernmost few hundred feet, the trail follows the right-of-way of the Cape Charles Railroad. That railroad was incorporated in 1906 to build south from Cape Charles, opened to Kiptopeke in 1912 and was absorbed by the New York, Philadelphia and Norfolk Railroad in 1917. Penn Central abandoned the line from Cape Charles to Kiptopeke in 1972, and The Nature Conservancy bought the right-of-way in 1985, when the track was removed. Planning for the trail began in 2000; Accomack and Northampton counties adopted the Eastern Shore of Virginia Bicycle Plan in June 2004, and the Northampton County Bicycle Committee was formed in January 2006.
Phase I, 2.6 miles from the refuge to Cedar Grove Drive, was finished in 2011 and opened on October 21, 2011. Phase II, 2.4 miles from Cedar Grove Drive to Capeville Drive, was dedicated on May 17, 2019. The trail is 10 feet wide with 2-foot shoulders and is for walking and biking only; horses, ATVs and golf carts are not allowed. Parking and restrooms are at the refuge visitor center, and the Cedar Grove Drive lot has parking only. Bike repair stations and benches stand along the trail. Phases III and IV, under study, would carry the trail into Cape Charles.
Sources checked Oct 14, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
30% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to June and August to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Cape Charles 5 ENE, 13.8 km from the trail's middle, 0 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 47 49 55 65 72 81 85 83 78 69 59 51 Low °F 32 33 39 48 58 66 71 69 64 53 43 36 Precipitation, in 3.4 2.9 3.5 3.4 3.5 3.8 4.7 4.1 4.2 4.3 3.1 3.5 - Wildlife refuges
Passes through Eastern Shore of Virginia National Wildlife Refuge.
- Old maps
USGS topographic maps of the trail's middle go back to the 1943 Townsend sheet (1:24,000); the 1955 Townsend sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain); National Wildlife Refuge System boundaries (U.S. Fish and Wildlife Service) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Agency noticesSouthern Tip Bike & Hike Trail — Northampton County
Nearby trails
- Eastern Shore Rail Trail 4.3 mi away · 3.7 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 11128165, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Southern Tip Bike & Hike Trail — Northampton County, Virginia · government source · checked Oct 14, 2026 Supports: name, about 5 miles, refuge visitor center to Capeville Drive near Cape Center, along northbound Route 13, USFWS funded and built Phases I and II, Nature Conservancy land and donation, planning from 2000, 2004 bicycle plan, 2006 committee, Phase I 2.6 miles completed 2011, Phase II 2.4 miles dedicated May 17, 2019, 10 ft width and shoulders, walking and biking only, no horses, ATVs or golf carts, parking and restrooms, repair stations and benches, Phases III and IV under study
- Southern Tip Bike & Hike Trail — Wikipedia · organization · checked Oct 14, 2026 Supports: Cape Charles Railroad right-of-way except the southern few hundred feet, 1906 incorporation, 1912 opening to Kiptopeke, 1917 absorption by NYP&N, 1972 Penn Central abandonment, 1985 Nature Conservancy purchase and track removal, October 21, 2011 opening, extension into Cape Charles
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.