States › Arkansas

Southwest Trail

Rail-trail in Arkansas

Runs through Shannon Hills and Little Rock · Saline and Pulaski counties

Conditions now

Loading the weather near Little Rock…

Forecast by the National Weather Service for Little Rock · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
6.7 mi 10.8 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Brechen Drive mile 4.6 directions to trailhead 1
  2. Parking at Agua Blanca Boulevard mile 5 directions to trailhead 2
  3. Parking at North Sardis Road mile 5.1 directions to trailhead 3
Southwest Trail drawn on the 1941 USGS topographic map of Alexander, Arkansas
Then: the 1941 USGS Alexander sheet (1:62,500) with today's trail line. Generated from USGS and OpenStreetMap data: map public domain, line © OpenStreetMap contributors. The sheet at USGS.

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Southwest Trail is a planned 65-mile paved, recreational trail between Hot Springs and Little Rock Central High School, with Shannon Hills and Benton among the communities named along the way. The City of Little Rock describes it as typically a 10 to 12 foot wide asphalt trail similar to the Arkansas River Trail, and says its completion "is far from guaranteed." This record covers a 6.7-mile paved piece in the Little Rock area, a fragment of that larger route.

A Little Rock Board of Directors communication of September 16, 2025 describes a recently completed trail running from the Saline County line to Hilaro Springs Road. Phase 2 would continue it from Hilaro Springs Road to Baseline Road. Pulaski County bears the cost of building that phase and would own the trail until the maintenance bond expires, after which ownership passes to the City of Little Rock for long-term maintenance.

The city's project history begins with a 2015 corridor and economic impact study and a 2016 city corridor study. The Friends of the Southwest Trail, a 501(c)(3), raises funds for the project, and Metroplan coordinates a task force. OpenStreetMap mapping shows parking near Brechen Drive, Agua Blanca Boulevard and North Sardis Road.

Sources checked Oct 18, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

63% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: March and October to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Little Rock Airport Adams Field, 16.1 km from the trail's middle, 10 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F505564738088929285746253
Low °F313442505968717063514033
Precipitation, in3.5455.65.13.53.33.234.54.75.1
Snow, in1.11.60.5000000000.6
Old maps

USGS topographic maps of the trail's middle go back to the 1891 Little Rock sheet (1:125,000); the 1954 Little Rock sheet (1:24,000) shows the area at mid-century. Browse all 18 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

What riders say on Reddit

  • One rider in April 2025 found the Iron Horse Church lot gate closed and parked in a pull-off on Heinke Road; another commenter believed parking was in the works at Geyer Springs Road. r/LittleRock, Apr 2025
  • In February 2025 one rider saw new concrete over what looked like an old railbed along Hilaro Springs Road, and in April 2025 another reported a section had opened in south Pulaski County. r/LittleRock, Feb 2025 · r/LittleRock, Apr 2025
5 Reddit threads about this trail, Jan 2025 to Feb 2026

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Where people who ride and look after this trail post: notices, conditions, work days.

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Southwest Trail - City of Little Rock · government source · checked Oct 18, 2026
    Supports: 65-mile planned route, surface width, communities, completion statement, 2015 and 2016 studies, Friends group, Metroplan task force
  3. Board of Directors Communication, September 16, 2025 - City of Little Rock · government source · checked Oct 18, 2026
    Supports: completed segment from Saline County line to Hilaro Springs Road, Phase 2 to Baseline Road, Pulaski County cost and ownership
  4. OpenStreetMap · web · checked Oct 18, 2026
    Supports: paved surface, 6.7-mile mapped length, parking near named streets

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.