States › South Carolina

Spanish Moss Trail

Rail-trail in South Carolina · OpenStreetMap relation

Runs through Burton, Beaufort and Port Royal · Beaufort County

Conditions now

Loading the weather near Burton…

Forecast by the National Weather Service for Burton · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

The Spanish Moss Trail is a partially-completed, ten-mile multi-purpose rail trail in northern Beaufort County, South Carolina.

From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.

Length
10.2 mi 16.4 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Clarendon Road Trailhead mile 0 directions to Clarendon Road Trailhead
  2. Parking at Roseida Road mile 3.7 directions to trailhead 2
  3. Broome Lane Trailhead mile 8.8 · water directions to Broome Lane Trailhead
  4. Westvine Drive Trailhead mile 9.9 · water directions to Westvine Drive Trailhead
Beaufort County, along the trail (opens in a new tab)
Beaufort County, along the trail · Photo: Upstateherd · CC BY-SA 4.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Spanish Moss Trail is a paved rail-trail of about 10 miles in northern Beaufort County, South Carolina, linking the City of Beaufort and the Town of Port Royal. It follows the corridor of the Magnolia Line railroad, established in 1870, which Wikipedia identifies as the former Port Royal Railroad. Rail operations ended in 2003; in 2008 the Beaufort-Jasper Water & Sewer Authority bought the right-of-way as a utility corridor, and in January 2011 it granted Beaufort County a surface easement to develop 14 miles of it as a recreational trail. Construction began in summer 2012 and the first segment opened that year. The Friends of the Spanish Moss Trail, a nonprofit founded in 2012, raises money and advocates for the trail, which is part of the East Coast Greenway.

The trail runs north to south between Seabrook and Port Royal, passing Burton and Beaufort. This record maps about 10 miles from the Clarendon Road trailhead in the north past the Roseida Road and Broome Lane trailheads to Westvine Drive near Port Royal. The Friends describe planned work at both ends: an extension of the northern section with the county, a funded first phase of a Downtown Beaufort Connector from the Depot Trailhead to Ribaut Road, and a funded segment into Port Royal. Wikipedia mentions a possible later phase of 10.1 miles to Yemassee.

The path is flat, paved and 12 feet wide, open dawn to dusk, with a 15 mph speed limit. It is open to pedestrians and non-motorized users; the only motorized exceptions are motorized wheelchairs and Class 1 pedal-assist e-bikes. Horses are prohibited, and dogs must be on a leash no longer than six feet. Six trailheads have parking, with portable toilets at the Broome Lane and Depot Road trailheads.

Sources checked Oct 16, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

The Federal Railroad Administration's national rail map marks 87% of this route as a trail on former railroad right-of-way.

Shade

35% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: October to May. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Beaufort Mcas, 4.7 km from the trail's middle, 4 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F606470778489929086786963
Low °F404349566471747470594843
Precipitation, in2.92.93.13.12.555.66.543.82.53.2
Snow, in000000000000
Old maps

USGS topographic maps of the trail's middle go back to the 1944 Fort Fremont sheet (1:62,500); the 1958 Beaufort sheet (1:24,000) shows the area at mid-century. Browse all 10 maps in topoView.

Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 9721892, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. “Spanish Moss Trail”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
  3. Wikidata Q7573248, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
  4. Spanish Moss Trail — Wikipedia · organization · checked Oct 16, 2026
    Supports: former Port Royal Railroad right-of-way; Seabrook to Port Royal through Burton and Beaufort; construction from summer 2012 with first segment opened that year; flat, paved, 12 feet wide; East Coast Greenway; possible 10.1-mile phase to Yemassee
  5. About the Spanish Moss Trail — Friends of the Spanish Moss Trail · web · checked Oct 16, 2026
    Supports: Magnolia Line Railroad established 1870; operations ceased 2003; BJWSA acquired right-of-way 2008; January 2011 surface easement to Beaufort County for 14 miles; nearly 10 miles open connecting Beaufort and Port Royal; Friends' role; planned northern extension, Downtown Beaufort Connector Phase 1 from Depot Trailhead to Ribaut Road, funded Port Royal segment
  6. Spanish Moss Trail Beaufort — Friends of the Spanish Moss Trail · web · checked Oct 16, 2026
    Supports: Friends founded in 2012 as a 501(c)(3) nonprofit
  7. Map, Rules and E-Bike Information — Friends of the Spanish Moss Trail · web · checked Oct 16, 2026
    Supports: dawn to dusk, 15 mph, non-motorized use with motorized wheelchair and Class 1 e-bike exceptions, horses prohibited, six-foot leash, six parking trailheads, port-a-potties at Broome Lane and Depot Road
  8. Spanish Moss Trail — OpenStreetMap relation 9721892 · web · checked Oct 16, 2026
    Supports: mapped extent of this record, Clarendon Road to Westvine Drive trailheads

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.