States › Texas

Spring Branch Trail

Greenway in Texas

Runs through Houston · Harris County

Conditions now

Loading the weather near Houston…

Forecast by the National Weather Service for Houston · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
2.4 mi 3.9 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Kempwood Drive mile 1.9 directions to trailhead 1
  2. Parking at Kempwood Drive mile 1.9 directions to trailhead 2
  3. Parking at Shoshone Road mile 2.4 directions to trailhead 3
Spring Branch Trail drawn on the 1992 USGS topographic map of Houston, Texas
Then: the 1992 USGS Houston sheet (1:100,000) with today's trail line. Generated from USGS and OpenStreetMap data: map public domain, line © OpenStreetMap contributors. The sheet at USGS.

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Spring Branch Trail is a paved hike-and-bike trail in the Spring Branch area of west Houston, Texas, built on a CenterPoint Energy utility corridor. In 2014 the City of Houston and CenterPoint signed a master license agreement allowing the city to build hike-and-bike trails on CenterPoint corridors, and the Spring Branch Management District's 2015-2030 Comprehensive Plan set out an 11-mile trail through Spring Branch linking the Addicks Reservoir to the White Oak Bayou Greenway. The district funded the trail, the nonprofit Houston Parks Board managed its design and construction, and the Houston Parks and Recreation Department managed the contract for design, construction and maintenance.

Phase 1, which this record maps, was completed in December 2020: a 2.4-mile, $1.7 million segment between Blalock Road and Wirt Road, on the CenterPoint right-of-way north of Hammerly Boulevard and south of Kempwood Drive. The path is 10 feet wide and paved. It connects to Schwartz Park and to neighborhoods at Lazy Spring Drive, Tilson Lane, Alcott Drive and Ridgemore Drive, and crosses Blalock, Hollister and Bingle roads at crossings with crosswalks and signs. The management district maintains it, with weekly trash pickup and mowing every two weeks.

Phase 2 extends the trail west from Gessner to Shadowdale Drive in the same easement. The Houston Parks Board gave late fall 2024 as its estimated completion, and in November 2024 the district reported it nearly complete, with a ribbon-cutting expected in early 2025. The Emnora Lane Hike-and-Bike Trail, built and maintained by Harris County, follows the same easement from Gessner to just west of Moorberry Lane.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

7% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: November to April. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Houston Intercont Airport, 22.9 km from the trail's middle, 5 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F646874808792949590837365
Low °F444854606874767571615246
Precipitation, in3.833.54563.84.84.75.53.94
Snow, in000000000000.1
Old maps

USGS topographic maps of the trail's middle go back to the 1915 Hillendahl sheet (1:24,000); the 1955 Addicks sheet (1:62,500) shows the area at mid-century. Browse all 10 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Spring Branch Trail — Houston Parks Board · organization · checked Oct 15, 2026
    Supports: 2014 City of Houston-CenterPoint master license agreement; Spring Branch Management District 2015-2030 Comprehensive Plan; 11-mile trail from Addicks Reservoir to White Oak Bayou Greenway; Phase 1 completed December 2020 from Blalock Road to Wirt Road; Emnora Lane trail built and maintained by Harris County from Gessner to just west of Moorberry Lane; Phase 2 from Gessner west to Shadowdale Drive, estimated completion late fall 2024; district maintenance
  3. Spring Branch Trail segment completion is one giant leap toward linking downtown Houston & far west side — Houston Parks Board press release (December 10, 2020) · organization · checked Oct 15, 2026
    Supports: $1.7 million, 2.4-mile segment between Blalock Road and Wirt Road along the CenterPoint right-of-way north of Hammerly Boulevard and south of Kempwood Drive; roles of the district, Houston Parks Board and Houston Parks and Recreation Department; 10-foot-wide paved trail; connections to Schwartz Park and neighborhood streets; crossings at Blalock, Hollister and Bingle; weekly trash pickup and bi-weekly mowing
  4. Fall has arrived... wait, no, it's gone again — Houstonia (sponsored content, Spring Branch Management District, November 2024) · web · checked Oct 15, 2026
    Supports: second phase nearly complete with a ribbon-cutting expected in early 2025
  5. OpenStreetMap ways for this trail — OpenStreetMap · web · checked Oct 15, 2026
    Supports: mapped extent of about 2.4 miles between Blalock Road and Wirt Road

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.