Squannacook River Rail Trail
Rail-trail in Massachusetts · OpenStreetMap relation
Runs through Townsend and Groton · Middlesex County
Conditions now
Loading the weather near Townsend…
Forecast by the National Weather Service for Townsend · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Squannacook River Rail Trail Parking Lot mile 0 directions to trailhead 1
- Parking at Main Street mile 0 directions to trailhead 2
- Parking at Depot Street mile 0 directions to trailhead 3
- Parking at Railroad Street mile 0 directions to trailhead 4
- Parking at Center Street mile 0.1 directions to trailhead 5
- Parking at Center Street mile 0.1 directions to trailhead 6
- Parking at Main Street mile 0.1 directions to trailhead 7
- Parking at Main Street mile 0.2 directions to trailhead 8
- Parking at Main Street mile 0.2 directions to trailhead 9
- Parking at Main Street mile 0.2 directions to trailhead 10
- Parking at Main Street mile 0.3 directions to trailhead 11
- Parking at Main Street mile 2 directions to trailhead 12
- Parking at Main Street mile 2.1 directions to trailhead 13
- Parking at Main Street mile 2.4 directions to trailhead 14
- Parking at Main Street mile 2.4 directions to trailhead 15
- Parking at Main Street mile 2.5 directions to trailhead 16
- Parking at Main Street mile 2.5 directions to trailhead 17
- Parking at Main Street mile 2.5 directions to trailhead 18
- Parking at Townsend Road mile 3.6 directions to trailhead 19
(opens in a new tab) About this trail
The Squannacook River Rail Trail is a 3.7-mile stone dust rail trail in Townsend and Groton, Massachusetts, on the MBTA-owned right-of-way of a former railroad. The nonprofit Squannacook Greenways, which leased the corridor from the MBTA, built and maintains it. The line began as the Peterborough and Shirley Railroad, incorporated in 1845, which opened as a branch of the Fitchburg Railroad from Ayer to West Townsend in 1848 and continued to Mason, New Hampshire, by 1850. The Fitchburg leased it in 1847 and bought it in 1860, and the line was extended to Greenville, New Hampshire, by 1876.
Squannacook Greenways built the trail in phases. A 2020 MassTrails grant went toward its first third, removing rails and ties and laying an aggregate surface over about 1.1 miles, and an opening ceremony for Phase 1 was held at the Depot Street parking area in Townsend on September 25, 2021. A 2022 MassTrails award went toward a third phase of about 0.6 miles in Groton, and the completion of the trail was celebrated in Townsend in early June 2024.
The trail runs from Depot Street in Townsend Center to the Bertozzi Wildlife Management Area in Groton, beside the Squannacook River State Forest; parking is at Depot Street and Center Street in Townsend. The surface is crushed stone 10 feet wide, used for cycling, walking and horseback riding. The mapped trail measures about 5.1 miles.
Sources checked Oct 13, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
64% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Fitchburg Municipal Airport, 13.2 km from the trail's middle, 24 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 34 37 45 58 70 78 83 82 74 62 50 40 Low °F 16 17 25 35 46 56 62 60 51 40 30 22 Precipitation, in 2.6 2.8 3.8 3.8 3.6 4.1 3.5 3.4 4 4.5 3.6 3.7 - Old maps
USGS topographic maps of the trail's middle go back to the 1893 Groton sheet (1:62,500); the 1950 Townsend sheet (1:24,000) shows the area at mid-century. Browse all 17 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Historic Railway
The line in its working days, from copies of old photographs, oldest first.
Photo 1 of 2
Community
Where people who ride and look after this trail post: notices, conditions, work days.
Nearby trails
- Nashua River Rail Trail 2.8 mi away · 12.3 mi, paved
- Mason Railroad Trail 3.0 mi away · 7.5 mi, dirt · New Hampshire
- Potanipo Rail Trail 4.0 mi away · 3.5 mi, dirt · New Hampshire
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 17937659, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- 2020 MassTrails Grant Awards — Commonwealth of Massachusetts (spreadsheet) · government source · checked Oct 13, 2026 Supports: approximately 3.7-mile trail on the MBTA right-of-way in Townsend and Groton, Squannacook Greenways, first one-third: rails and ties removed and aggregate surface over about 1.1 miles
- 2022 MassTrails Grant Awards — Commonwealth of Massachusetts (spreadsheet) · government source · checked Oct 13, 2026 Supports: 3.7-mile stone dust trail on the MBTA right-of-way, built in four phases, third phase of about 0.6 miles in Groton
- Fitchburg Railroad — Wikipedia · organization · checked Oct 13, 2026 Supports: Peterborough and Shirley Railroad incorporated 1845, opened Ayer–West Townsend 1848, to Mason by 1849 or 1850, Fitchburg lease 1847 and purchase 1860, extension to Greenville by 1876, Squannacook River Rail Trail on this line
- Squannacook River Rail Trail Opening Ceremony and Trailwalk — Groton Herald (September 23, 2021) · press · checked Oct 13, 2026 Supports: Phase 1 opening ceremony Saturday, September 25, at the Depot Street parking area in Townsend
- Groton & Townsend Unite as River Rail Trail is Completed — Groton Herald (June 6, 2024) · press · checked Oct 13, 2026 Supports: completion of the trail celebrated in Townsend the previous Saturday
- Squannacook River Rail Trail — TrailLink · web · checked Oct 13, 2026 Supports: Depot Street, Townsend, to the Bertozzi Wildlife Management Area, Groton; Squannacook Greenways leased the corridor from the MBTA, built and maintains it; 10-foot crushed stone surface; cycling, walking, horseback riding; adjacent Squannacook River State Forest; parking at Depot and Center Streets
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.

