States › California

SR-56 Bike Path

Greenway in California · OpenStreetMap relation

Runs through San Diego · San Diego County

Conditions now

Loading the weather near San Diego…

Forecast by the National Weather Service for San Diego · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
10.6 mi 17.1 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Clews Ranch Road mile 2.1 directions to trailhead 1
  2. Parking at Clews Ranch Road mile 2.1 directions to trailhead 2
  3. Parking at Solterra Vista Parkway mile 5.4 directions to trailhead 3
  4. Parking at Torrey Santa Fe Road mile 6.4 directions to trailhead 4
  5. Parking at Rancho Peñasquitos Boulevard mile 9.3 · restrooms directions to trailhead 5
  6. Parking at Azuaga Street mile 9.5 directions to trailhead 6
  7. Parking at Carmel Mountain Express Drive mile 10.5 directions to trailhead 7
SR-56 Bike Path drawn on the 1955 USGS topographic map of San Diego, California
Then: the 1955 USGS San Diego sheet (1:250,000) with today's trail line. Generated from USGS and OpenStreetMap data: map public domain, line © OpenStreetMap contributors. The sheet at USGS.

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The SR-56 Bike Path is a paved, closed multi-use path that parallels State Route 56 across the northern part of the city of San Diego, giving pedestrians and cyclists a corridor between Interstate 5 and Interstate 15 away from busy streets such as El Camino Real and Carmel Valley Road. The city described it in 2018 as 10.5 miles long. It is a highway-corridor path, not a rail-trail.

The map line here runs about 10.6 miles from Sorrento Valley Road near Interstate 5 east to Sabre Springs near Interstate 15. In 2018 the path began at Rancho Carmel Drive in the east and dead-ended at a dirt path about 200 feet short of Interstate 5. That October the San Diego City Council's Infrastructure Committee approved a cooperative agreement with Caltrans to build the missing westernmost segment under the freeway, with the city contributing up to $2.25 million and Caltrans responsible for the rest.

Caltrans and local leaders opened the pathway under Interstate 5 in Carmel Valley in May 2024. The $4 million extension, paid for through the State Highway Operations and Protection Program, connects the SR-56 Bike Path with the North Coast Bike Trail and the Coastal Rail Trail at an existing path on Old Sorrento Valley Road.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

12% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: all year. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
San Diego Miramar Nas, 11 km from the trail's middle, 47 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F676768707275808282787267
Low °F474850525760646563585146
Precipitation, in2.32.71.60.80.30.10.100.10.60.92
Old maps

USGS topographic maps of the trail's middle go back to the 1903 La Jolla sheet (1:62,500); the 1953 Del Mar sheet (1:24,000) shows the area at mid-century. Browse all 12 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 9330456, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Infrastructure Committee Advances Agreement to Complete SR-56 Bike Path (October 24, 2018) — City of San Diego, Councilmember Mark Kersey · government source · checked Oct 15, 2026
    Supports: 10.5-mile closed multi-use pathway parallel to SR-56 between I-5 and I-15; avoids El Camino Real and Carmel Valley Road; 2018 configuration from Rancho Carmel Drive to a dirt path about 200 feet from I-5; cooperative agreement with Caltrans, city up to $2.25 million
  3. Caltrans opens key connecting bike path under Interstate 5 in Carmel Valley — Times of San Diego (May 23, 2024) · press · checked Oct 15, 2026
    Supports: May 2024 opening; $4 million; State Highway Operations and Protection Program; links to North Coast Bike Trail, Coastal Rail Trail and Old Sorrento Valley Road path
  4. SR-56 Bike Path (relation 9330456) — OpenStreetMap · web · checked Oct 15, 2026
    Supports: paved map line about 10.6 miles from Sorrento Valley Road to Sabre Springs (endpoints located with Nominatim reverse geocoding)

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.