Stewart Creek Greenway
Greenway in North Carolina · OpenStreetMap relation
Runs through Charlotte · Mecklenburg County
Conditions now
Loading the weather near Charlotte…
Forecast by the National Weather Service for Charlotte · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Freedom Drive mile 0 · water directions to trailhead 1
- Parking at Freedom Drive mile 0 · water directions to trailhead 2
- Parking at Hurston Circle mile 0.3 directions to trailhead 3
- Parking at Hurston Circle mile 0.3 directions to trailhead 4
- Parking at Hurston Circle mile 0.4 directions to trailhead 5
- Parking at Woodvale Place mile 0.8 directions to trailhead 6
- Parking at Cunningham Drive mile 1.5 · restrooms · water directions to trailhead 7
- Parking at Yellowstone Drive mile 1.7 directions to trailhead 8
- Parking at Yellowstone Drive mile 1.7 directions to trailhead 9
- Parking at Rozzelles Ferry Road mile 1.7 directions to trailhead 10
- Parking at Wells Meadow Drive mile 1.7 directions to trailhead 11
(opens in a new tab) About this trail
The Stewart Creek Greenway is a paved greenway in west Charlotte, North Carolina, in the Mecklenburg County Park and Recreation greenway system. The county lists it together with the Irwin Creek and Wesley Heights greenways as three independent sections: 2.7 miles from State Street to Cedar Street with a connection to Freedom Drive, 1.7 miles from West Boulevard to Clanton Road, and 1.0 mile of Stewart Tributary Greenway from Lakewood Avenue to Yellowstone Drive.
The newest stretch, through Martin Luther King, Jr. Park, officially opened in March 2025. It was a joint greenway and stormwater project of Mecklenburg County Park and Recreation and Charlotte-Mecklenburg Storm Water Services, with a 0.5-mile trail along Stewart Creek, a 1-mile trail along a Stewart Creek tributary, 0.5 mile of stream enhancements to reduce erosion and sediment, and a new stormwater control measure near a Duke Energy substation.
This record maps about 3.2 miles. It begins at Freedom Drive and follows Stewart Creek north past Martin Luther King Park toward Rozzelles Ferry Road, then turns west along the tributary past Lakewood Park to the Yellowstone Drive area, with a short branch to the northeast. OpenStreetMap maps the route as a shared bicycle and foot path surfaced in asphalt and concrete, with access points at Hurston Circle, Woodvale Place, Wells Meadow Drive, Rozzelles Ferry Road, Cunningham Drive and Yellowstone Drive. A county planning study covers a corridor of about 11.3 miles along Irwin and Stewart creeks between Billy Graham Parkway and Nevin Road, an important link in the county's Greenway Master Plan.
Sources checked Oct 16, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
38% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: March to May and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Charlotte Douglas Airport, 8.1 km from the trail's middle, 25 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 52 57 64 73 80 87 90 89 83 73 63 55 Low °F 32 35 41 49 58 66 70 69 63 50 40 34 Precipitation, in 3.5 3.1 4 3.8 3.4 4 3.7 4.3 3.7 3.2 3.3 3.6 Snow, in 1.6 1.1 0.3 0 0 0 0 0 0 0 0.1 0.4 - On the National Register
- Wesley Heights Historic District, Charlotte · historic district, listed 1995 · nomination file for Wesley Heights Historic District
- Old maps
USGS topographic maps of the trail's middle go back to the 1905 Charlotte sheet (1:48,000); the 1949 Charlotte East sheet (1:24,000) shows the area at mid-century. Browse all 14 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
Nearby trails
- Irwin Creek Greenway 0.5 mi away · 2.5 mi, paved
- Charlotte Rail Trail 1.2 mi away · 6.6 mi, paved
- Cross Charlotte Trail 2.1 mi away · 22.3 mi, paved
- Paw Creek Greenway 3.6 mi away · 1.7 mi, surface unknown
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 11784527, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Greenways | Park and Recreation — Mecklenburg County · government source · checked Oct 16, 2026 Supports: county greenway system; Irwin Creek, Stewart Creek and Wesley Heights Greenways listed as three independent sections: 2.7 miles State Street to Cedar Street with a connection to Freedom Drive, 1.7 miles West Blvd. to Clanton Road, 1.0 miles of Stewart Tributary Greenway from Lakewood Ave. to Yellowstone Drive
- Irwin and Stewart Creek Greenway Planning Study — PublicInput (Mecklenburg County) · government source · checked Oct 16, 2026 Supports: Irwin/Stewart Creek corridor between Billy Graham Parkway and Nevin Road, approximately 11.3 miles, an important link in the county's Greenway Master Plan
- Stewart Creek Greenway — PublicInput (Mecklenburg County) · web · checked Oct 16, 2026 Supports: section through Martin Luther King, Jr. Park officially opened March 2025; partnership of Mecklenburg County Park and Recreation and Charlotte-Mecklenburg Storm Water Services; 0.5-mile trail along Stewart Creek, 1-mile trail along Stewart Creek Tributary, 0.5 mile of stream enhancements, new stormwater control measure near the Duke Energy substation
- Stewart Creek Greenway (relation 11784527) — OpenStreetMap · web · checked Oct 16, 2026 Supports: route of this record (about 3.2 miles) from Freedom Drive north along Stewart Creek and west along the tributary; bicycle=designated and foot=designated cycleways surfaced in asphalt and concrete; Martin Luther King Park and Lakewood Park beside the route; access points at Hurston Circle, Woodvale Place, Wells Meadow Drive, Rozzelles Ferry Road, Cunningham Drive and Yellowstone Drive
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.